REPORT DATE -5 NOVEMBER 2003
A - Steam Power Stations
Power StationsTypeNo. of UnitsNo. of Operating UnitsUnits Load (MW)Total Load MWTarget LoadRemarks
Fuel123456MW
DibisNatural Gas4200771424No. 2 Boiler Leakage. No. 1 FWP.
BaijiFuel Oil6595858085080425500No. 5 rehab. No. 3 synch 2011.
DuraFuel Oil417500075180No. 4: Programmed Maintenance10 OCT to 25 NOV. Nos. 5 & 6: Rehabilitation.
South BaghdadFuel Oil644000353510120200No.2 Boiler Leakage. Nos. 3 A/H. No. 6 limited to condensate pump.
MussaibeCrude and Fuel Oil4220000200400860No. 2 program mnt 20 OCT to 12 NOV. No. 3 program mnt 5 NOV to 20 DEC.
NassiryaCrude431501101000360600No. 4 turbine expansion.
NajebiaNatural Gas and Crude2130030160No. 5 one boiler in operation. No. 4 stopped prog at 0438.
HarthaNatural Gas and Crude411500150300No. 1: Limited due to load flow. No. 4: Programmed Maintenance from 23 OCT to 23 DEC.
Total:1,5742,824
# A-Steam Power Stations REPORT DATE -5 NOVEMBER 2003 A - Steam Power Stations Power Stations Type No. of Units No. of Operating Units Units Load (MW) Total Load MW Target Load Remarks Fuel 1 2 3 4 5 6 MW Dibis Natural Gas 4 2 0 0 7 7 14 24 No. 2 Boiler Leakage. No. 1 FWP. Baiji Fuel Oil 6 5 95 85 80 85 0 80 425 500 No. 5 rehab. No. 3 synch 2011. Dura Fuel Oil 4 1 75 0 0 0 75 180 No. 4: Programmed Maintenance10 OCT to 25 NOV. Nos. 5 & 6: Rehabilitation. South Baghdad Fuel Oil 6 4 40 0 0 35 35 10 120 200 No.2 Boiler Leakage. Nos. 3 A/H. No. 6 limited to condensate pump. Mussaibe Crude and Fuel Oil 4 2 200 0 0 200 400 860 No. 2 program mnt 20 OCT to 12 NOV. No. 3 program mnt 5 NOV to 20 DEC. Nassirya Crude 4 3 150 110 100 0 360 600 No. 4 turbine expansion. Najebia Natural Gas and Crude 2 1 30 0 30 160 No. 5 one boiler in operation. No. 4 stopped prog at 0438. Hartha Natural Gas and Crude 4 1 150 0 150 300 No. 1: Limited due to load flow. No. 4: Programmed Maintenance from 23 OCT to 23 DEC. Total: 1574 2824 # B- Gas_C-Power Stations Report Date- 5 NOVEMBER 2003 B- Gas Power Stations C -Hydro Power Stations Power Stations No. of Units No. of Operating Units Station Load Target Load Fuel Use Remarks Power Stations No. of Units No. of Operating Units Station Load Target Load Discharge m3/Sec Gas Pressure Baiji 2 1 115 125 Gas Oil No. 2 waiting expret. Musil Dam Main 4 2 170 600 Quds 2 2 110 160 Gas Oil 39 trucks. Musil Dam reg 4 3 33 60 450 Mosil 12 8 120 150 18 No. 1 rotor defect. No. 2 ACC. No. 8 program mnt. No. 7 tripped at 2127 NGPL. Musil Pumping 2 0 0 0 Dibis 3 1 11 60 33 No. 5 problem turbine rotor. No. 6: Programmed Maintenance. Haditha Dam 6 2 130 160 300 Old Mulla 12 6 85 128 480 No. 1 excitation. No. 2 Clutch. No. 5 programmed maintenance. No. 7 Oil Cooler. No. 11 Programmed Maintenance. Samarra 3 2 41 55 420 New Mulla 6 5 180 173 3.3 No. 6 Generator Defective. Himrin 2 1 23 21 130 Taji 7 4 60 55 19 No. 1 Programmed Maintenance. No. 5 Diesel. No.7 Rehabilitation. Hindia 4 4 6 5 M. Taji 2 0 0 20 0 NGPL Kufa 4 1 1 1 Dura 4 0 0 30 21 No.1 Control. No.3 Rehabilitation. No. 4 and 2 NGPL. Total 404 896 Hilla 4 3 50 64 28 No. 1 Programmed Maintenance. System Generation 73032 MWh Najaf 3 3 100 129 26 Syrian Line Generation 1228 MWh Khor 4 3 110 80 Natural Gas No. 4: Rehabilitation. Turkey Line Generation 1946 MWh Shuaiba 2 1 6 20 Natural Gas No. 1 Programmed Maintenance. Total Generation 76206 MWh Petro 4 1 10 0 Natural Gas System Peak Load 3542 MW M. Dibis 4 1 0 24 Natural Gas Syria Peak Load 60 MW Mossil East 5 0 0 15 Gas Oil Turkey Peak Load 80 MW Hmam 2 0 0 Gas Oil Fixed Gen Peak Load 77 MW Total Peak Load 3759 MW Total 957 1233 Baghdad Load 1243 MW Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590). Edited by Electricity Commission U.S. Advisor Staff. # Peak Loads GOVERNORATE Peak Load MW MWH Average Load MW 5 NOVEMBER, 2003 Baghdad 1245 24236 1009.8333 Power transferred from North to Middle 740 MW Duhok 80 1881 78.375 Naynawa 320 7852 327.1667 Power transferred from South to Middle 190 MW Tamim 148 3095 128.9583 Salah Aldeen 220 4456 185.6667 Anbar 202 4058 169.0833 Dyala 85 1835 76.4583 Babil 115 2322 96.75 Kirbala 75 1735 72.2917 Najaf 100 2318 96.5833 Kadsya 60 1505 62.7083 Wasit 110 2167 90.2917 Muthana 70 1482 61.75 Nasirya 125 2564 106.8333 Misan 65 1504 62.6667 Basra 310 7166 298.5833 3330