# A-Steam Power Stations
REPORT DATE - DECEMBER 2003
A - Steam Power Stations
Power Stations Type No. of Units No. of Operating Units Units Load (MW) Total Load MW Target Load Remarks Fuel 1 2 3 4 5 6 MW Dibis Natural Gas 4 1 0 0 0 8 8 24 No.1 mnt 10 DEC to 25 JAN. No. 3 tripped 1715 FWP. No. 2 FWP.
Baiji Fuel Oil 6 3 0 85 85 100 0 0 270 500 No. 5 rehab. No. 6 mnt 5 DEC to 19 JAN. No. 1 tripped at 726 A/H.
Dura Fuel Oil 4 1 75 0 0 0 75 180 No. 4 Mnt 10 OCT to 12 DEC. Nos. 5 & 6: Rehabilitation.
South Baghdad Fuel Oil 6 1 35 0 0 0 0 0 35 200 No. 6 mnt 11 NOV to 26 DEC. No. 5 mnt 1 DEC to 15 JAN. No. 2, 3 and 4 boiler leakage.
Mussaibe Crude and Fuel Oil 4 2 200 0 0 200 400 860 No. 3 program mnt 3 NOV to 18 DEC. No. 2 problem in sealing.
Nassirya Crude 4 3 145 145 0 110 400 600 No. 3 mnt 11 NOV to 11 DEC. No. 4 synch 1401 11 DEC.
Najebia Natural Gas and Crude 2 1 0 90 90 160 No. 4 mnt 4 NOV to 22 DEC.
Hartha Natural Gas and Crude 4 1 150 0 150 300 No. 4 Mnt from 23 OCT to 23 DEC.
Total: 1428 2824
# B- Gas_C-Power Stations
Report Date- 12 DECEMBER 2003 B- Gas Power Stations C -Hydro Power Stations Power Stations No. of Units No. of Operating Units Station Load Target Load Fuel Use Remarks Power Stations No. of Units No. of Operating Units Station Load Target Load Discharge m3/Sec Gas Pressure Baiji 2 1 110 125 Gas Oil Musil Dam Main 4 3 390 600 Quds 2 1 112 160 Gas Oil 51 trucks. Musil Dam reg 4 3 35 60 450 Mosil 12 7 115 150 33 No. 1 rotor defect. No. 2 ACC. No.3 and 8 program mnt. Musil Pumping 2 0 0 0 Dibis 3 0 0 60 26 No. 4, 5& 6 rehab. Haditha Dam 6 2 150 160 400 Old Mulla 12 8 120 128 510 No. 1 gas control. No. 2 servo and C/B. No. 5 Programmed Mnt. No. 12 rehab. No. 6 tripped at 1920 HET. Samarra 3 2 41 55 410 New Mulla 6 4 140 173 3.6 No. 6 Generator Defective. No. 3 Mnt. Himrin 2 1 20 21 75 Taji 7 2 33 55 20 No. 5 flame. No.7 Rehabilitation. No. 2 mnt. No. 4 generator look out. No. 3 rotor. Hindia 4 4 4 5 85 M. Taji 2 0 0 20 0 No. 1 and 2 software. Kufa 4 0 0 1 0 Dura 4 3 75 30 19 No.3 Rehabilitation. Total 640 896 Hilla 4 4 70 64 34 System Generation 71615 MWh Najaf 3 2 98 129 32 No. 2 program mnt. Syrian Line Generation 1248 MWh Khor 4 2 110 80 Natural Gas No. 4: Rehabilitation. No. 1 VIB. Turkey Line Generation 601 MWh Shuaiba 2 0 0 20 Natural Gas No. 1 oil leak. No 2 tripped 304 VIB. Total Generation 73464 MWh Petro 4 1 10 0 Natural Gas System Peak Load 3266 MW M. Dibis 4 0 0 24 Natural Gas Syria Peak Load 20 MW Mossil East 5 0 0 15 Gas Oil Turkey Peak Load 30 MW Hmam 2 0 0 Gas Oil Fixed Gen Peak Load 77 MW Total Peak Load 3393 MW Total 993 1233 Baghdad Load 1350 MW Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590).
Edited by Electricity Commission U.S. Advisor Staff.
# Peak Loads
GOVERNORATE Peak Load MW MWH Average Load MW 12 DECEMBER, 2003 Baghdad 1350 15 Power transferred from North to Middle 700 MW.
Duhok 30 15
Naynawa 241 15 Power transferred from South to Middle 200 MW.
Tamim 110 15
Salah Aldeen 150 15
Anbar 170 15
Dyala 50 15
Babil 78 15
Kirbala 60 15
Najaf 75 15
Kadsya 50 15
Wasit 75 15
Muthana 45 15
Nasirya 115 15
Misan 60 15
Basra 300 15
2959
MWH not provided by Ministry of Electricity
الرئيسية / الخدمات الأساسية / ESS-a91b23da
الخدمات الأساسية
Power System 13 dec
- التاريخ
- 13 كانون الأول 2003
- الفئة
- الخدمات الأساسية
- النص متوفر
- الإنكليزية
- عدد الملفات
- 1
معاينة الجدول
الورقة «A-Steam Power Stations»: 13 صفاً × 13 عموداً
| REPORT DATE - DECEMBER 2003 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| A - Steam Power Stations | ||||||||||||
| Power Stations | Type | No. of Units | No. of Operating Units | Units Load (MW) | Total Load MW | Target Load | Remarks | |||||
| Fuel | 1 | 2 | 3 | 4 | 5 | 6 | MW | |||||
| Dibis | Natural Gas | 4 | 1 | 0 | 0 | 0 | 8 | 8 | 24 | No.1 mnt 10 DEC to 25 JAN. No. 3 tripped 1715 FWP. No. 2 FWP. | ||
| Baiji | Fuel Oil | 6 | 3 | 0 | 85 | 85 | 100 | 0 | 0 | 270 | 500 | No. 5 rehab. No. 6 mnt 5 DEC to 19 JAN. No. 1 tripped at 726 A/H. |
| Dura | Fuel Oil | 4 | 1 | 75 | 0 | 0 | 0 | 75 | 180 | No. 4 Mnt 10 OCT to 12 DEC. Nos. 5 & 6: Rehabilitation. | ||
| South Baghdad | Fuel Oil | 6 | 1 | 35 | 0 | 0 | 0 | 0 | 0 | 35 | 200 | No. 6 mnt 11 NOV to 26 DEC. No. 5 mnt 1 DEC to 15 JAN. No. 2, 3 and 4 boiler leakage. |
| Mussaibe | Crude and Fuel Oil | 4 | 2 | 200 | 0 | 0 | 200 | 400 | 860 | No. 3 program mnt 3 NOV to 18 DEC. No. 2 problem in sealing. | ||
| Nassirya | Crude | 4 | 3 | 145 | 145 | 0 | 110 | 400 | 600 | No. 3 mnt 11 NOV to 11 DEC. No. 4 synch 1401 11 DEC. | ||
| Najebia | Natural Gas and Crude | 2 | 1 | 0 | 90 | 90 | 160 | No. 4 mnt 4 NOV to 22 DEC. | ||||
| Hartha | Natural Gas and Crude | 4 | 1 | 150 | 0 | 150 | 300 | No. 4 Mnt from 23 OCT to 23 DEC. | ||||
| Total: | 1,428 | 2,824 |
الورقة «B- Gas_C-Power Stations»: 25 صفاً × 13 عموداً
| Report Date- 12 DECEMBER 2003 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| B- Gas Power Stations | C -Hydro Power Stations | |||||||||||
| Power Stations | No. of Units | No. of Operating Units | Station Load | Target Load | Fuel Use | Remarks | Power Stations | No. of Units | No. of Operating Units | Station Load | Target Load | Discharge m3/Sec |
| Gas Pressure | ||||||||||||
| Baiji | 2 | 1 | 110 | 125 | Gas Oil | Musil Dam Main | 4 | 3 | 390 | 600 | ||
| Quds | 2 | 1 | 112 | 160 | Gas Oil | 51 trucks. | Musil Dam reg | 4 | 3 | 35 | 60 | 450 |
| Mosil | 12 | 7 | 115 | 150 | 33 | No. 1 rotor defect. No. 2 ACC. No.3 and 8 program mnt. | Musil Pumping | 2 | 0 | 0 | 0 | |
| Dibis | 3 | 0 | 0 | 60 | 26 | No. 4, 5& 6 rehab. | Haditha Dam | 6 | 2 | 150 | 160 | 400 |
| Old Mulla | 12 | 8 | 120 | 128 | 510 | No. 1 gas control. No. 2 servo and C/B. No. 5 Programmed Mnt. No. 12 rehab. No. 6 tripped at 1920 HET. | Samarra | 3 | 2 | 41 | 55 | 410 |
| New Mulla | 6 | 4 | 140 | 173 | 3.60 | No. 6 Generator Defective. No. 3 Mnt. | Himrin | 2 | 1 | 20 | 21 | 75 |
| Taji | 7 | 2 | 33 | 55 | 20 | No. 5 flame. No.7 Rehabilitation. No. 2 mnt. No. 4 generator look out. No. 3 rotor. | Hindia | 4 | 4 | 4 | 5 | 85 |
| M. Taji | 2 | 0 | 0 | 20 | 0 | No. 1 and 2 software. | Kufa | 4 | 0 | 0 | 1 | 0 |
| Dura | 4 | 3 | 75 | 30 | 19 | No.3 Rehabilitation. | Total | 640 | 896 | |||
| Hilla | 4 | 4 | 70 | 64 | 34 | System Generation | 71,615 | MWh | ||||
| Najaf | 3 | 2 | 98 | 129 | 32 | No. 2 program mnt. | Syrian Line Generation | 1,248 | MWh | |||
| Khor | 4 | 2 | 110 | 80 | Natural Gas | No. 4: Rehabilitation. No. 1 VIB. | Turkey Line Generation | 601 | MWh | |||
| Shuaiba | 2 | 0 | 0 | 20 | Natural Gas | No. 1 oil leak. No 2 tripped 304 VIB. | Total Generation | 73,464 | MWh | |||
| Petro | 4 | 1 | 10 | 0 | Natural Gas | System Peak Load | 3,266 | MW | ||||
| M. Dibis | 4 | 0 | 0 | 24 | Natural Gas | Syria Peak Load | 20 | MW | ||||
| Mossil East | 5 | 0 | 0 | 15 | Gas Oil | Turkey Peak Load | 30 | MW | ||||
| Hmam | 2 | 0 | 0 | Gas Oil | Fixed Gen Peak Load | 77 | MW | |||||
| Total Peak Load | 3,393 | MW | ||||||||||
| Total | 993 | 1,233 | Baghdad Load | 1,350 | MW | |||||||
| Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590). | ||||||||||||
| Edited by Electricity Commission U.S. Advisor Staff. |
الورقة «Peak Loads»: 21 صفاً × 5 أعمدة · المعاينة لأول 20 صفاً؛ الملف الكامل من زر الأصل
| GOVERNORATE | Peak Load MW | MWH | Average Load MW | 12 DECEMBER, 2003 |
|---|---|---|---|---|
| Baghdad | 1,350 | 15 | Power transferred from North to Middle 700 MW. | |
| Duhok | 30 | 15 | ||
| Naynawa | 241 | 15 | Power transferred from South to Middle 200 MW. | |
| Tamim | 110 | 15 | ||
| Salah Aldeen | 150 | 15 | ||
| Anbar | 170 | 15 | ||
| Dyala | 50 | 15 | ||
| Babil | 78 | 15 | ||
| Kirbala | 60 | 15 | ||
| Najaf | 75 | 15 | ||
| Kadsya | 50 | 15 | ||
| Wasit | 75 | 15 | ||
| Muthana | 45 | 15 | ||
| Nasirya | 115 | 15 | ||
| Misan | 60 | 15 | ||
| Basra | 300 | 15 | ||
| 2,959 | ||||
| MWH not provided by Ministry of Electricity |
تظليل نتائج البحث عن: