Power System Highlights for January 28, 2004
The CPA Electricity Advisor issues this report to note significant events or conditions of interest in the power sector. The basic daily data on the power system is available on the CPA web site.
HIGHLIGHTS:
Nassirya 4 returned programmed maintenance and is operational.
Generation:
Daily System peak on 27 Jan – 4104Mw.
Daily system Demand on 27 Jan – 5,922 Mw (Estimated) (4104 Actual Generation, + 1500 Load Shed, + 318 Corrected Frequency, = 5922)
Total generation – 87,494Mwh
Imported power - Power from Syria (60Mw) and Turkey (82Mw) included in System Peak
Generators Returned to Service 335 Mw Baiji 4 100 Mw South Baghdad 1 30 Mw Nassirya 4 130 Mw South Baghdad 6 30 Mw Mosil 2 15 Mw Mosil 6 15 Mw Taji 4 15 Mw
Generators Unscheduled Out of Service as of 27 JAN 04 579 Mw
*Dibis 1, SP, Turbine Vibration 8Mw Dibis 4, SP, Boiler Leak 8Mw Baiji 5, SP, Forced Outage 100Mw Daura 4, SP, Rotor repair 100Mw South Baghdad 4, SP, Boiler Leak 30Mw South Baghdad 2, SP, Air heater defect 30Mw
*Najebia 6, SP, Natural Gas system trouble 100Mw Baiji 2, NG, Lubricating oil leak from bearing 60Mw Mosil 1, NG, Rotor Defect 15Mw Mosil 3, NG, Bleed Valve 15Mw Mosil 9, NG, Rotor Defect 15Mw Old Mulla 1,NG, Acc Gear 15Mw Old Mulla 2, NG, Servo and Circuit breaker problem 15Mw New Mulla 6, NG, Generator Defect 30Mw Taji 3, NG, Compressor 15Mw Taji Mobile, 2, NG, Software problem 15Mw Shuaiba 2, NG, Stand by 8Mw
* RED – Denotes out of service since last report
Generators Scheduled Out of Service as of 27 JAN 04 801 Mw
2 Thermal units off-line for rehabilitation ------------------------------------------------ 200 Mw Daura 5 and 6 200 Mw – ECD May 2004
6 Thermal units in programmed maintenance ----------------------------------------- 393 Mw Dibis 3 8 Mw – ECD Feb15 Baiji 2 100 Mw – ECD Mar 04 Baiji 6 100 Mw – ECD Feb 3 South Baghdad 5 35 Mw – ECD Slipped TBD Hartha 4 150 Mw – ECD Jan 30
6 Gas Turbine units off-line for rehabilitation ---------------------------------------------118 Mw Dibis 4, 9 Mw - ECD Mar 30 Dibis 5 9 Mw – ECD Jan 29 Old Mulla 12 15 Mw Taji 7 15 Mw Daura 3 20 Mw Najaf 2 50 Mw - ECD Jan 25
5 Gas Turbine units in programmed maintenance--------------------------------------- 90 Mw Old Mulla 5 15 Mw Old Mulla 10 15 Mw - ECD Feb 05 New Mulla 4 30 Mw – ECD Mar 31 New Mulla 1 30 Mw – ECD Feb 29
Transmission:
Countrywide, Iraq’s electrical output continues to be constrained by damaged transmission and distribution lines. The lines have come down due to sabotage and bad weather. Downed transmission lines increase the probability for complete nationwide blackout by reducing system contingency and causing mechanical damage at power plants. This may cause further temporary blackouts, which have already directly resulted in 1) impacted refineries causing reduced fuel flow to power plants and a subsequent reduction in power supply, and 2) damages in the power plants due to undercurrent causing units to come off-line for unscheduled maintenance.
Transmission Lines out of service:
400KV
Nassiriya-Khor Zubayr – ECD May 1 Haditha-Baghdad West – ECD slipped from Jan 24 to Mar 15 Hartha-Qarna – Wasit – ECD slipped to Feb 29 Baiji - Baghdad West #1 – ECD Feb 10 New line - Baghdad East-Baghdad South #2 – ECD Feb 4 Haditha – Qaim – no funding Baiji – Haditha – no funding/no contractor Diyala Connection – ECD April 30 132KV Shuwaiba-Toba-Hamar– ECD Jan 30 Omara-Burzegan – Sabotaged. ECD March 2004 Nejibiya – Hartha Work Complete on one line, one remaining Bab- Al Zubair – ECD TBD Shuwaiba – Bab Al Zubayr 1+2, ECD TBD SST – Um Qsr ECD TBD
Lines Returned to service:
None
LEGEND OF ELECTRICAL SYSTEM POWER SOURCE
NG: NATURAL GAS
SP: STEAM POWER – These plants use either fuel oil or crude in burners HYDRO: WATER POWER
Data compiled and reported by:
LTC Tharnell M. Thomas
CENTCOM LNO CPA Ministry of Electricity thomast2orha.centcom.mil Page PAGE 3 of NUMPAGES 3
الرئيسية / الخدمات الأساسية / ESS-a660f41b
الخدمات الأساسية
Power System Highlights for January 28, 2004
- التاريخ
- 28 كانون الثاني 2004
- الفئة
- الخدمات الأساسية
- النص متوفر
- الإنكليزية
- عدد الملفات
- 1
تظليل نتائج البحث عن: