# A-Steam Power Stations
Report Date - 14 FEBRUARY 2004 A - Steam Power Stations Power Stations Type Fuel No. of Units No. of Operating Units Units Load (MW) Total Load MW Target Load MW Remarks 1 2 3 4 5 6 Dibis Natural Gas 4 2 8 7 15 24 #2 boiler leakage; #3 prog maint Baiji Fuel Oil 6 4 90 65 80 95 330 500 #1 synch at 1005; #2 prog maint; #3 limited to control valve; #5 forced outage Daura Fuel Oil 4 0 180 #3 synch at 1420, stopped at 313 boiler prob; #4 prog maint; #5 & #6 rehab South Baghdad Fuel Oil 6 1 30 30 200 #1 & #2 prog maint; #3 stopped at 1300 hyd prob; #4 boiler leakage; #5 a/h Mussaibe Crude and Fuel Oil 4 3 200 200 200 600 860 #4 prog maint Nassirya Crude 4 4 130 160 170 175 635 600 Najebia Natural Gas and Crude 2 2 80 90 170 160 Hartha Natural Gas and Crude 4 1 100 100 300 #4 prog maint Out of Service for Unscheduled Maintanence Total: 1880 2824 Out of Service for Program Maintanence/Rehab No activity Not Performing at Peak Performance
# B- Gas_C-Power Stations
Report Date - 14 FEBRUARY 2004 B- Gas Power Stations C -Hydro Power Stations Power Stations No. of Units No. of Operating Units Station Load Target Load Fuel Use Remarks Power Stations No. of Units No. of Operating Units Station Load Target Load Discharge m3/Sec Gas Pressure Baiji 2 1 85 125 Gas Oil #2 lub oil leak from bearing Musil Dam Main 4 4 560 600 Quds 2 2 220 160 Gas Oil 34 trucks Musil Dam reg 4 4 36 60 1000 Mosil 12 10 153 150 24 #1 rotor defec; #9 rotor defect Musil Pumping 2 1 110 0 Dibis 3 2 54 30 26 #4 rehab Haditha Dam 6 2 140 160 300 Old Mulla 12 6 84 128 450 #1 acc gear; #2 servo; #3 stopped at 1416 prin. Prot.; #5 prog maint; #10 prog maint; #12 needs rehab; All the operating untis stopped to repair gas system Samarra 3 2 42 55 400 New Mulla 6 4 117 173 3.2 #1 prog maint; #4 synch at 1350; #6 generator defect Himrin 2 2 35 21 130 Taji 7 5 71 55 18 #3 compressor; #7 needs rehab Hindia 4 4 5 5 115 M. Taji 2 18 #2 software Kufa 4 3 1 0 70 Daura 4 3 70 30 17 #3 needs rehab Total 929 896 Hilla 4 2 32 64 34 #1 cooling sys prob; #2 servo System Generation 90199 MWh Najaf 3 2 90 129 32 #2 prog maint Syrian Line Generation 1341 MWh Khor 4 3 80 80 Natural Gas #4 rehab Turkey Line Generation 1950 MWh Shuaiba 2 1 6 20 Natural Gas #2 s/b Total Generation 98917 MWh M. Shuaiba 2 Natural Gas split with the refinery System Peak Load 4082 MW Petro 4 1 10 0 Natural Gas Syria Peak Load 60 MW M. Dibis 4 3 10 24 Natural Gas Turkey Peak Load 80 MW Mossil East 5 3 16 0 Gas Oil Fixed Gen Peak Load 266 MW Hmam/Zafranya 7 2 3 Gas Oil Total Peak Load 4488 MW Diesel 48 Gas Oil Baghdad Load 1700 MW Total 1149 1186 Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590).
Edited by Electricity Commission U.S. Advisor Staff.
# Peak Loads
Report Date - 14 FEBRUARY 2004 GOVERNORATE Peak Load MW MWH Average Load MW Power transferred from North to Middle 850 MW.
Power transferred from South to Middle 292 MW.
Baghdad 1700 35570 1482
Duhok 80 1916 80
Naynawa 400 9614 401
Tamim 151 3643 152
Salah Aldeen 230 4963 207
Anbar 202 4503 188
Dyala 118 2522 105
Babil 110 2614 109
Kirbala 128 2799 117
Najaf 135 3097 129
Kadsya 70 1446 60
Wasit 100 2445 102
Muthana 65 1389 58
Nasirya 130 2886 120
Misan 65 1419 59
Basra 270 7523 313
الرئيسية / الخدمات الأساسية / ESS-a5b69d49
الخدمات الأساسية
System Status Feb 14
- التاريخ
- 14 شباط 2004
- الفئة
- الخدمات الأساسية
- النص متوفر
- الإنكليزية
- عدد الملفات
- 1
معاينة الجدول
الورقة «A-Steam Power Stations»: 16 صفاً × 13 عموداً
| Report Date - 14 FEBRUARY 2004 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| A - Steam Power Stations | ||||||||||||
| Power Stations | Type Fuel | No. of Units | No. of Operating Units | Units Load (MW) | Total Load MW | Target Load MW | Remarks | |||||
| 1 | 2 | 3 | 4 | 5 | 6 | |||||||
| Dibis | Natural Gas | 4 | 2 | 8 | 7 | 15 | 24 | #2 boiler leakage; #3 prog maint | ||||
| Baiji | Fuel Oil | 6 | 4 | 90 | 65 | 80 | 95 | 330 | 500 | #1 synch at 1005; #2 prog maint; #3 limited to control valve; #5 forced outage | ||
| Daura | Fuel Oil | 4 | 0 | 180 | #3 synch at 1420, stopped at 313 boiler prob; #4 prog maint; #5 & #6 rehab | |||||||
| South Baghdad | Fuel Oil | 6 | 1 | 30 | 30 | 200 | #1 & #2 prog maint; #3 stopped at 1300 hyd prob; #4 boiler leakage; #5 a/h | |||||
| Mussaibe | Crude and Fuel Oil | 4 | 3 | 200 | 200 | 200 | 600 | 860 | #4 prog maint | |||
| Nassirya | Crude | 4 | 4 | 130 | 160 | 170 | 175 | 635 | 600 | |||
| Najebia | Natural Gas and Crude | 2 | 2 | 80 | 90 | 170 | 160 | |||||
| Hartha | Natural Gas and Crude | 4 | 1 | 100 | 100 | 300 | #4 prog maint | |||||
| Out of Service for Unscheduled Maintanence | Total: | 1,880 | 2,824 | |||||||||
| Out of Service for Program Maintanence/Rehab | ||||||||||||
| No activity | ||||||||||||
| Not Performing at Peak Performance |
الورقة «B- Gas_C-Power Stations»: 26 صفاً × 13 عموداً
| Report Date - 14 FEBRUARY 2004 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| B- Gas Power Stations | C -Hydro Power Stations | |||||||||||
| Power Stations | No. of Units | No. of Operating Units | Station Load | Target Load | Fuel Use | Remarks | Power Stations | No. of Units | No. of Operating Units | Station Load | Target Load | Discharge m3/Sec |
| Gas Pressure | ||||||||||||
| Baiji | 2 | 1 | 85 | 125 | Gas Oil | #2 lub oil leak from bearing | Musil Dam Main | 4 | 4 | 560 | 600 | |
| Quds | 2 | 2 | 220 | 160 | Gas Oil | 34 trucks | Musil Dam reg | 4 | 4 | 36 | 60 | 1,000 |
| Mosil | 12 | 10 | 153 | 150 | 24 | #1 rotor defec; #9 rotor defect | Musil Pumping | 2 | 1 | 110 | 0 | |
| Dibis | 3 | 2 | 54 | 30 | 26 | #4 rehab | Haditha Dam | 6 | 2 | 140 | 160 | 300 |
| Old Mulla | 12 | 6 | 84 | 128 | 450 | #1 acc gear; #2 servo; #3 stopped at 1416 prin. Prot.; #5 prog maint; #10 prog maint; #12 needs rehab; All the operating untis stopped to repair gas system | Samarra | 3 | 2 | 42 | 55 | 400 |
| New Mulla | 6 | 4 | 117 | 173 | 3.20 | #1 prog maint; #4 synch at 1350; #6 generator defect | Himrin | 2 | 2 | 35 | 21 | 130 |
| Taji | 7 | 5 | 71 | 55 | 18 | #3 compressor; #7 needs rehab | Hindia | 4 | 4 | 5 | 5 | 115 |
| M. Taji | 2 | 18 | #2 software | Kufa | 4 | 3 | 1 | 0 | 70 | |||
| Daura | 4 | 3 | 70 | 30 | 17 | #3 needs rehab | Total | 929 | 896 | |||
| Hilla | 4 | 2 | 32 | 64 | 34 | #1 cooling sys prob; #2 servo | System Generation | 90,199 | MWh | |||
| Najaf | 3 | 2 | 90 | 129 | 32 | #2 prog maint | Syrian Line Generation | 1,341 | MWh | |||
| Khor | 4 | 3 | 80 | 80 | Natural Gas | #4 rehab | Turkey Line Generation | 1,950 | MWh | |||
| Shuaiba | 2 | 1 | 6 | 20 | Natural Gas | #2 s/b | Total Generation | 98,917 | MWh | |||
| M. Shuaiba | 2 | Natural Gas | split with the refinery | System Peak Load | 4,082 | MW | ||||||
| Petro | 4 | 1 | 10 | 0 | Natural Gas | Syria Peak Load | 60 | MW | ||||
| M. Dibis | 4 | 3 | 10 | 24 | Natural Gas | Turkey Peak Load | 80 | MW | ||||
| Mossil East | 5 | 3 | 16 | 0 | Gas Oil | Fixed Gen Peak Load | 266 | MW | ||||
| Hmam/Zafranya | 7 | 2 | 3 | Gas Oil | Total Peak Load | 4,488 | MW | |||||
| Diesel | 48 | Gas Oil | Baghdad Load | 1,700 | MW | |||||||
| Total | 1,149 | 1,186 | ||||||||||
| Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590). | ||||||||||||
| Edited by Electricity Commission U.S. Advisor Staff. |
الورقة «Peak Loads»: 24 صفاً × 4 أعمدة · المعاينة لأول 21 صفاً؛ الملف الكامل من زر الأصل
| Report Date - 14 FEBRUARY 2004 | |||
|---|---|---|---|
| GOVERNORATE | Peak Load MW | MWH | Average Load MW |
| Power transferred from North to Middle 850 MW. | |||
| Power transferred from South to Middle 292 MW. | |||
| Baghdad | 1,700 | 35,570 | 1,482 |
| Duhok | 80 | 1,916 | 80 |
| Naynawa | 400 | 9,614 | 401 |
| Tamim | 151 | 3,643 | 152 |
| Salah Aldeen | 230 | 4,963 | 207 |
| Anbar | 202 | 4,503 | 188 |
| Dyala | 118 | 2,522 | 105 |
| Babil | 110 | 2,614 | 109 |
| Kirbala | 128 | 2,799 | 117 |
| Najaf | 135 | 3,097 | 129 |
| Kadsya | 70 | 1,446 | 60 |
| Wasit | 100 | 2,445 | 102 |
| Muthana | 65 | 1,389 | 58 |
| Nasirya | 130 | 2,886 | 120 |
| Misan | 65 | 1,419 | 59 |
| Basra | 270 | 7,523 | 313 |
تظليل نتائج البحث عن: