# A-Steam Power Stations
REPORT DATE - 27 DECEMBER 2003
A - Steam Power Stations
Power Stations Type No. of Units No. of Operating Units Units Load (MW) Total Load MW Target Load Remarks Fuel 1 2 3 4 5 6 MW Dibis Natural Gas 4 2 0 8 0 8 16 24 No.1 mnt 10 DEC to 25 JAN. No 3 FDF.
Baiji Fuel Oil 6 2 100 0 0 100 0 0 200 500 No. 5 rehab. No. 6 mnt 5 DEC to 19 JAN. No. 2 bearing problem. No. 3 tripped.
Dura Fuel Oil 4 2 80 100 0 0 180 180 No. 4 synch. Nos. 5 & 6: Rehab.
South Baghdad Fuel Oil 6 4 35 25 0 35 0 35 130 200 No. 5 mnt 1 DEC to 15 JAN. No. 3 boiler leakage. No. 1 and 2 synch.
Mussaibe Crude and Fuel Oil 4 2 215 0 0 215 430 860 No. 3 program mnt 3 NOV to 18 DEC. No. 2 seal high temp.
Nassirya Crude 4 3 130 140 0 100 370 600 No. 3 mnt 11 NOV to 15 DEC.
Najebia Natural Gas and Crude 2 1 35 0 35 160 No. 4 synch. No. 5 stopped.
Hartha Natural Gas and Crude 4 1 140 0 140 300 No. 4 Mnt from 23 OCT to 23 DEC.
Total: 1501 2824
# B- Gas_C-Power Stations
Report Date- 27 DECEMBER 2003 B- Gas Power Stations C -Hydro Power Stations Power Stations No. of Units No. of Operating Units Station Load Target Load Fuel Use Remarks Power Stations No. of Units No. of Operating Units Station Load Target Load Discharge m3/Sec Gas Pressure Baiji 2 1 50 125 Gas Oil No. 2 insufficient fuel. Musil Dam Main 4 3 350 600 Quds 2 2 215 160 Gas Oil 42 trucks. Musil Dam reg 4 3 35 60 450 Mosil 12 8 120 150 29 No. 1 Rotor Defect. No. 2 servo ACC. No. 3 Prog Maint. No. 9 rotor defect. Musil Pumping 2 0 0 0 Dibis 3 0 0 60 0 No. 4, 5& 6 rehab. Haditha Dam 6 2 140 160 480 Old Mulla 12 5 70 128 700 No. 1 ACC gear. No. 2 servo. No. 4 vibration. No. 5 Programmed Mnt. No. 6 acc gear. No. 7 programmed mnt. No. 12 rehab. Samarra 3 2 40 55 390 New Mulla 6 4 150 173 350 No. 5 programmed mnt. No. 6 Generator Defective. Himrin 2 1 23 21 Taji 7 3 50 55 18 No. 3 Compressor. No. 4 Turbine. No. 5 Flame. No. 7 Rehab. Hindia 4 3 4 5 M. Taji 2 1 7 20 0 No. 2 software. Kufa 4 0 0 1 Dura 4 3 70 30 18 No.3 Rehabilitation. Total 592 896 Hilla 4 4 70 64 34 System Generation 72268 MWh Najaf 3 2 90 129 31 No. 2 program mnt. Syrian Line Generation 1423 MWh Khor 4 2 80 80 Natural Gas No. 4: Rehabilitation. No. 3 tripped 1618. Turkey Line Generation 1802 MWh Shuaiba 2 2 10 20 Natural Gas No 2 VIB. Total Generation 75493 MWh Petro 4 0 0 0 Natural Gas System Peak Load 3090 MW M. Dibis 4 0 0 24 Natural Gas Syria Peak Load 60 MW Mossil East 5 3 15 15 Gas Oil Turkey Peak Load 80 MW Hmam/Zafranya 7 2 3 Gas Oil Fixed Gen Peak Load 77 MW Diesel 5 Total Peak Load 3307 MW Total 1005 1233 Baghdad Load 1075 MW Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590).
Edited by Electricity Commission U.S. Advisor Staff.
# Peak Loads
GOVERNORATE Peak Load MW MWH Average Load MW 27 December, 2003 Baghdad 15 Power transferred from North to Middle MW.
Duhok 15
Naynawa 15 Power transferred from South to Middle MW.
Tamim 15
Salah Aldeen 15
Anbar 15
Dyala 15
Babil 15
Kirbala 15
Najaf 15
Kadsya 15
Wasit 15
Muthana 15
Nasirya 15
Misan 15
Basra 15
0
NO DATA RECEIVED FROM ME
الرئيسية / الخدمات الأساسية / ESS-a095afa8
الخدمات الأساسية
Power System 27 dec
- التاريخ
- 27 كانون الأول 2003
- الفئة
- الخدمات الأساسية
- النص متوفر
- الإنكليزية
- عدد الملفات
- 1
معاينة الجدول
الورقة «A-Steam Power Stations»: 13 صفاً × 13 عموداً
| REPORT DATE - 27 DECEMBER 2003 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| A - Steam Power Stations | ||||||||||||
| Power Stations | Type | No. of Units | No. of Operating Units | Units Load (MW) | Total Load MW | Target Load | Remarks | |||||
| Fuel | 1 | 2 | 3 | 4 | 5 | 6 | MW | |||||
| Dibis | Natural Gas | 4 | 2 | 0 | 8 | 0 | 8 | 16 | 24 | No.1 mnt 10 DEC to 25 JAN. No 3 FDF. | ||
| Baiji | Fuel Oil | 6 | 2 | 100 | 0 | 0 | 100 | 0 | 0 | 200 | 500 | No. 5 rehab. No. 6 mnt 5 DEC to 19 JAN. No. 2 bearing problem. No. 3 tripped. |
| Dura | Fuel Oil | 4 | 2 | 80 | 100 | 0 | 0 | 180 | 180 | No. 4 synch. Nos. 5 & 6: Rehab. | ||
| South Baghdad | Fuel Oil | 6 | 4 | 35 | 25 | 0 | 35 | 0 | 35 | 130 | 200 | No. 5 mnt 1 DEC to 15 JAN. No. 3 boiler leakage. No. 1 and 2 synch. |
| Mussaibe | Crude and Fuel Oil | 4 | 2 | 215 | 0 | 0 | 215 | 430 | 860 | No. 3 program mnt 3 NOV to 18 DEC. No. 2 seal high temp. | ||
| Nassirya | Crude | 4 | 3 | 130 | 140 | 0 | 100 | 370 | 600 | No. 3 mnt 11 NOV to 15 DEC. | ||
| Najebia | Natural Gas and Crude | 2 | 1 | 35 | 0 | 35 | 160 | No. 4 synch. No. 5 stopped. | ||||
| Hartha | Natural Gas and Crude | 4 | 1 | 140 | 0 | 140 | 300 | No. 4 Mnt from 23 OCT to 23 DEC. | ||||
| Total: | 1,501 | 2,824 |
الورقة «B- Gas_C-Power Stations»: 25 صفاً × 13 عموداً
| Report Date- 27 DECEMBER 2003 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| B- Gas Power Stations | C -Hydro Power Stations | |||||||||||
| Power Stations | No. of Units | No. of Operating Units | Station Load | Target Load | Fuel Use | Remarks | Power Stations | No. of Units | No. of Operating Units | Station Load | Target Load | Discharge m3/Sec |
| Gas Pressure | ||||||||||||
| Baiji | 2 | 1 | 50 | 125 | Gas Oil | No. 2 insufficient fuel. | Musil Dam Main | 4 | 3 | 350 | 600 | |
| Quds | 2 | 2 | 215 | 160 | Gas Oil | 42 trucks. | Musil Dam reg | 4 | 3 | 35 | 60 | 450 |
| Mosil | 12 | 8 | 120 | 150 | 29 | No. 1 Rotor Defect. No. 2 servo ACC. No. 3 Prog Maint. No. 9 rotor defect. | Musil Pumping | 2 | 0 | 0 | 0 | |
| Dibis | 3 | 0 | 0 | 60 | 0 | No. 4, 5& 6 rehab. | Haditha Dam | 6 | 2 | 140 | 160 | 480 |
| Old Mulla | 12 | 5 | 70 | 128 | 700 | No. 1 ACC gear. No. 2 servo. No. 4 vibration. No. 5 Programmed Mnt. No. 6 acc gear. No. 7 programmed mnt. No. 12 rehab. | Samarra | 3 | 2 | 40 | 55 | 390 |
| New Mulla | 6 | 4 | 150 | 173 | 350 | No. 5 programmed mnt. No. 6 Generator Defective. | Himrin | 2 | 1 | 23 | 21 | |
| Taji | 7 | 3 | 50 | 55 | 18 | No. 3 Compressor. No. 4 Turbine. No. 5 Flame. No. 7 Rehab. | Hindia | 4 | 3 | 4 | 5 | |
| M. Taji | 2 | 1 | 7 | 20 | 0 | No. 2 software. | Kufa | 4 | 0 | 0 | 1 | |
| Dura | 4 | 3 | 70 | 30 | 18 | No.3 Rehabilitation. | Total | 592 | 896 | |||
| Hilla | 4 | 4 | 70 | 64 | 34 | System Generation | 72,268 | MWh | ||||
| Najaf | 3 | 2 | 90 | 129 | 31 | No. 2 program mnt. | Syrian Line Generation | 1,423 | MWh | |||
| Khor | 4 | 2 | 80 | 80 | Natural Gas | No. 4: Rehabilitation. No. 3 tripped 1618. | Turkey Line Generation | 1,802 | MWh | |||
| Shuaiba | 2 | 2 | 10 | 20 | Natural Gas | No 2 VIB. | Total Generation | 75,493 | MWh | |||
| Petro | 4 | 0 | 0 | 0 | Natural Gas | System Peak Load | 3,090 | MW | ||||
| M. Dibis | 4 | 0 | 0 | 24 | Natural Gas | Syria Peak Load | 60 | MW | ||||
| Mossil East | 5 | 3 | 15 | 15 | Gas Oil | Turkey Peak Load | 80 | MW | ||||
| Hmam/Zafranya | 7 | 2 | 3 | Gas Oil | Fixed Gen Peak Load | 77 | MW | |||||
| Diesel | 5 | Total Peak Load | 3,307 | MW | ||||||||
| Total | 1,005 | 1,233 | Baghdad Load | 1,075 | MW | |||||||
| Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590). | ||||||||||||
| Edited by Electricity Commission U.S. Advisor Staff. |
الورقة «Peak Loads»: 21 صفاً × 5 أعمدة
| GOVERNORATE | Peak Load MW | MWH | Average Load MW | 27 December, 2003 |
|---|---|---|---|---|
| Baghdad | 15 | Power transferred from North to Middle MW. | ||
| Duhok | 15 | |||
| Naynawa | 15 | Power transferred from South to Middle MW. | ||
| Tamim | 15 | |||
| Salah Aldeen | 15 | |||
| Anbar | 15 | |||
| Dyala | 15 | |||
| Babil | 15 | |||
| Kirbala | 15 | |||
| Najaf | 15 | |||
| Kadsya | 15 | |||
| Wasit | 15 | |||
| Muthana | 15 | |||
| Nasirya | 15 | |||
| Misan | 15 | |||
| Basra | 15 | |||
| 0 | ||||
| NO DATA RECEIVED FROM ME |