Reporting Peak for 21 APRIL 2004 / Report Date - 22 APRIL 2004
A - Steam Power Stations
Power StationsType FuelNo. of UnitsNo. of Operating UnitsUnits Load (MW)Total Load MWTarget Load MWRemarks
123456
DibisNatural Gas42881624
BaijiFuel Oil6310095100295500
DauraFuel Oil40180
South BaghdadFuel Oil62303060200
MussaibeCrude and Fuel Oil43150150120420860
NassiryaCrude42150150300600
NajebiaNatural Gas and Crude227080150160
HarthaNatural Gas and Crude41170170300
Out of Service for Unscheduled MaintanenceTotal:1,4112,824
Out of Service for Program Maintanence/Rehab
No activity
Not Performing at Peak Performance
# A-Steam Power Stations Reporting Peak for 21 APRIL 2004 / Report Date - 22 APRIL 2004 A - Steam Power Stations Power Stations Type Fuel No. of Units No. of Operating Units Units Load (MW) Total Load MW Target Load MW Remarks 1 2 3 4 5 6 Dibis Natural Gas 4 2 8 8 16 24 Baiji Fuel Oil 6 3 100 95 100 295 500 Daura Fuel Oil 4 0 180 South Baghdad Fuel Oil 6 2 30 30 60 200 Mussaibe Crude and Fuel Oil 4 3 150 150 120 420 860 Nassirya Crude 4 2 150 150 300 600 Najebia Natural Gas and Crude 2 2 70 80 150 160 Hartha Natural Gas and Crude 4 1 170 170 300 Out of Service for Unscheduled Maintanence Total: 1411 2824 Out of Service for Program Maintanence/Rehab No activity Not Performing at Peak Performance # B- Gas_C-Power Stations Reporting Peak for 21 APRIL 2004 / Report Date - 22 APRIL 2004 B- Gas Power Stations C -Hydro Power Stations Power Stations No. of Units No. of Operating Units Station Load Target Load Fuel Use Remarks Power Stations No. of Units No. of Operating Units Station Load Target Load Discharge m3/Sec Gas Pressure Baiji 2 1 90 125 Gas Oil Musil Dam Main 4 4 560 600 M. Baiji 8 4 80 Gas Oil Musil Dam reg 4 4 33 60 Quds 2 2 200 160 Gas Oil Musil Pumping 2 1 110 0 Mosil 12 8 125 150 Haditha Dam 6 160 Dibis 3 2 50 30 Samarra 3 3 56 55 Old Mulla 12 7 93 128 Himrin 2 2 35 21 New Mulla 6 4 120 173 Hindia 4 4 6 5 Taji 7 55 Kufa 4 2 1 0 M. Taji 2 18 Total 801 896 Daura 4 30 System Generation MWh Hilla 4 4 60 64 Syrian Line Generation MWh Najaf 3 3 82 129 Turkey Line Generation MWh Khor 4 3 115 80 Natural Gas Total Generation 86821 MWh Shuaiba 2 1 9 20 Natural Gas System Peak Load 3705 MW M. Shuaiba 2 Natural Gas Syria Peak Load 56 MW Petro 4 0 Natural Gas Turkey Peak Load 80 MW M. Dibis 4 3 9 24 Natural Gas Fixed Gen Peak Load 266 MW Mossil East 5 3 18 0 Gas Oil Total Peak Load 4107 MW Hmam/Zafranya 7 2 55 Gas Oil Baghdad Load 1500 MW Diesel Gas Oil Total 1106 1186 Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590). Edited by Electricity Commission U.S. Advisor Staff. # Peak Loads Reporting Peak for 21 APRIL 2004 / Report Date - 22 APRIL 2004 GOVERNORATE Peak Load MW MWH Average Load MW Demand Load MW Baghdad 1200 Duhok 82 Naynawa 340 Tamim 145 Salah Aldeen 210 Anbar 210 Dyala 85 Babil 90 Kirbala 90 Najaf 95 Kadsya 63 Wasit 85 Muthana 57 Nasirya 110 Misan 64 Basra 325