Report Date - 24 FEBRUARY 2004
A - Steam Power Stations
Power StationsType FuelNo. of UnitsNo. of Operating UnitsUnits Load (MW)Total Load MWTarget Load MWRemarks
123456
DibisNatural Gas42881624#3 prog maint; #4 boiler leakage
BaijiFuel Oil64908580100355500#2 prog maint; #5 forced outage
DauraFuel Oil417575180#4 prog maint; #5 & #6 rehab
South BaghdadFuel Oil612020200#1 & #2 prog maint; #4 stopped at 1150 boiler leakage; #5 stopped at 250 boiler leakage; #6 boiler leakage
MussaibeCrude and Fuel Oil42200200400860#1 boiler leakage; #4 prog maint
NassiryaCrude4313516575375600#3 vacuums prob; #4 stopped at 1705 vacuum prob, synch at 1900
NajebiaNatural Gas and Crude228590175160
HarthaNatural Gas and Crude41130130300#4 excit. prob
Out of Service for Unscheduled MaintanenceTotal:1,5462,824
Out of Service for Program Maintanence/Rehab
No activity
Not Performing at Peak Performance
# A-Steam Power Stations Report Date - 24 FEBRUARY 2004 A - Steam Power Stations Power Stations Type Fuel No. of Units No. of Operating Units Units Load (MW) Total Load MW Target Load MW Remarks 1 2 3 4 5 6 Dibis Natural Gas 4 2 8 8 16 24 #3 prog maint; #4 boiler leakage Baiji Fuel Oil 6 4 90 85 80 100 355 500 #2 prog maint; #5 forced outage Daura Fuel Oil 4 1 75 75 180 #4 prog maint; #5 & #6 rehab South Baghdad Fuel Oil 6 1 20 20 200 #1 & #2 prog maint; #4 stopped at 1150 boiler leakage; #5 stopped at 250 boiler leakage; #6 boiler leakage Mussaibe Crude and Fuel Oil 4 2 200 200 400 860 #1 boiler leakage; #4 prog maint Nassirya Crude 4 3 135 165 75 375 600 #3 vacuums prob; #4 stopped at 1705 vacuum prob, synch at 1900 Najebia Natural Gas and Crude 2 2 85 90 175 160 Hartha Natural Gas and Crude 4 1 130 130 300 #4 excit. prob Out of Service for Unscheduled Maintanence Total: 1546 2824 Out of Service for Program Maintanence/Rehab No activity Not Performing at Peak Performance # B- Gas_C-Power Stations Report Date - 24 FEBRUARY 2004 B- Gas Power Stations C -Hydro Power Stations Power Stations No. of Units No. of Operating Units Station Load Target Load Fuel Use Remarks Power Stations No. of Units No. of Operating Units Station Load Target Load Discharge m3/Sec Gas Pressure Baiji 2 1 130 125 Gas Oil #2 lub oil leak from bearing Musil Dam Main 4 4 565 600 Quds 2 1 80 160 Gas Oil 24 trucks - #2 stopped at 125 fuel level low Musil Dam reg 4 3 23 60 1000 Mosil 12 8 120 150 21 #1 rotor defect; #3 synch at 1020; #5 synch at 1005; #7 & #8 transt prob; #9 rotor defect; #12 generator fault Musil Pumping 2 1 100 0 Dibis 3 2 56 30 28 #4 rehab Haditha Dam 6 2 125 160 350 Old Mulla 12 7 111 128 30 #1 acc. Gear; #2 servo; #5 prog maint; #10 prog maint; #11 synch at 1014; #12 needs rehab Samarra 3 3 48 55 420 New Mulla 6 4 140 173 30 #1 synch at 1413; #2 prog maint; #6 generator defect Himrin 2 2 44 21 160 Taji 7 5 69 55 14 #3 compressor; #7 needs rehab Hindia 4 4 5 5 120 M. Taji 2 1 8 18 14 #2 software Kufa 4 1 1 0 30 Daura 4 1 25 30 18 #2 prog maint; #3 needs rehab; #4 stopped at 520 c/b Total 911 896 Hilla 4 2 35 64 28 #1 cooling sys prob; #2 servo System Generation 80750 MWh Najaf 3 3 140 129 23 Syrian Line Generation 1369 MWh Khor 4 3 120 80 Natural Gas #2 prog maint Turkey Line Generation 944 MWh Shuaiba 2 1 5 20 Natural Gas #1 prog maint Total Generation 88490 MWh M. Shuaiba 2 Natural Gas split with the refinery System Peak Load 3629 MW Petro 4 1 10 0 Natural Gas Syria Peak Load 60 MW M. Dibis 4 4 12 24 Natural Gas Turkey Peak Load 56 MW Mossil East 5 3 15 0 Gas Oil Fixed Gen Peak Load 266 MW Hmam/Zafranya 7 1 2 Gas Oil Total Peak Load 4011 MW Diesel 43 Gas Oil Baghdad Load 1300 MW Total 1121 1186 Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590). Edited by Electricity Commission U.S. Advisor Staff. # Peak Loads Report Date - 24 FEBRUARY 2004 Power transferred from North to Middle 845 MW. Power transferred from South to Middle 124 MW. GOVERNORATE Peak Load MW MWH Average Load MW Baghdad 1300 29740 1239 Duhok 84 1303 54 Naynawa 310 9447 394 Tamim 120 3827 159 Salah Aldeen 200 4837 202 Anbar 185 4012 167 Dyala 75 1847 77 Babil 75 2202 92 Kirbala 146 2657 111 Najaf 156 2861 119 Kadsya 55 1310 55 Wasit 65 1871 78 Muthana 59 1353 56 Nasirya 140 2807 117 Misan 61 1439 60 Basra 310 7455 311