DAILY POWER SYSTEM HIGHLIGHTS FOR FEBRUARY 26, 2004
The CPA Electricity Advisor issues this report to note significant events or conditions of interest in the power sector. The basic daily data on the power system is available on the CPA web site.
HIGHLIGHTS:
Generation:
Peak Power 4333Mw, 94,729Mw hours, 7-day Avg. 4180Mw
Generators Returned to Service 295 Mw South Baghdad 4 30 Mw South Baghdad 5 30 Mw Nassirya 3 150 Mw Qudis 2 85 Mw Generators Unscheduled Out of Service 598 Mw 876 Mw PLANT
Type
SP, CP, RP, HP
Fault
Mw
Dibis 4
SP
Boiler Leak
8
* South Baghdad 3
SP
Boiler Leak
30
South Baghdad 6
SP
Boiler Leak
30
Mussaibe 1
SP
Boiler Leak
200
Baiji 2,
CP
Lubricating oil leak
110
Hilla 1
CP
Cooling System problems
20
Hilla 2
CP
Servo
20
Mosil 1
CP
Rotor Defect
15
Mosil 9
CP
Rotor Defect
15
Mosil 12
CP
Generator fault
15
Old Mulla 1
CP
Acc Gear
15
Old Mulla 2
CP
Servo
15
New Mulla 5
CP
Inlet Gate Valve (IGV)
30
New Mulla 6
CP
Generator Defect
30
Taji 3,
CP
Compressor
15
* Taji 4
CP
Control card
15
Taji Mobile, 2
CP
Software problem
15
* RED – Denotes out of service since last report
Generators Scheduled Out of Service 816 Mw PLANT
Type
SP/NG
Prog. Maintenance(M) / Rehab (R) Maint.
Org.
Date out-of -service
Est. In-service Date
Mw
Baiji 2
SP
M
Bechtel
2 Jan 04
4 Mar
100
Doura 2
CP
M
ME
21 Feb 04
TBD
20
Doura 3
CP
R
GRD/RIE
1 Mar 03
15 May
20
Doura 4
SP
M
ME
2 Feb 04
20 Apr
65
Doura 5
SP
R
Bechtel
Jul 03
30 Apr
100
Doura 6
SP
R
Bechtel
Jul 03
31May
100
Dibis 3
SP
M
ME
30Dec 03
31 May
8
Dibis 4
CP
R
GRD/RIE
Sep 03
30 Mar
18
Khor Zubayr 2
CP
M
ME
19 Feb 04
TBD
50
Mussaibe 4
SP
M
ME
7 Feb 04
7 Mar
180
New Mulla 2
CP
M
ME
17 Feb04
TBD
30
Old Mulla 5
CP
M
GRD/RIE
1 Nov 03
15 May
15
Old Mulla 12
CP
R
GRD/RIE
1 Oct 03
15 May
15
Taji 7
CP
R
GRD/RIE
1 Oct 03
TBD
15
Shuaiba 1
CP
M
ME
14 Feb 04
31 May
20
South Baghdad 1
SP
M
ME
12 Feb 04
12 Apr
30
South Baghdad 2
SP
M
ME
12 Feb 04
12 Apr
30
LEGEND OF ELECTRICAL SYSTEM POWER SOURCE
SP: STEAM POWER – These plants use either fuel oil or crude in burners CP: COMBUSTION POWER RP: RECIPROCATING POWER HP: HYDRO POWER
Transmission:
LINE
Kv
Fault
Maint.
Org.
Date out-of -service
Est. In-service Date
Comments
Nassiriya-Khor Zubayr
400
Sabotage
Bechtel
26 May
102 towers complete/212req’d Haditha-Baghd West 400 Sabotage GRD/RIE
20 Apr
45 towers complete/236 req’d Hartha-Qut – Wasit 400 Sabotage GRD/RIE
7 Mar
287 towers complete/297 req’d Baiji - Baghd West #1 400 Sabotage GRD/RIE
14 Mar
68 towers complete/68 req’d Baghd E.-Baghd S. #2 400 New Line GRD/RIE
28 Feb
81 towers complete/81req’d Baghd S. – Diwaniyah 400 Sabotage GRD/RIE
Compl. 24 Jan
27 towers complete/27 req’d Haditha – Qaim 400 Sabotage ME
TBD
No contract awarded
Baiji – Haditha
400
Sabotage
ME
TBD
No contract awarded
Diyala Connection
400
New Line
ME
30 Apr
Dibis/Irbil-Quarqush
132
New Line
GRD/RIE
15 May
Contractor on-site 20 Feb
Mosul – Mosul East
132
Sabotage
ME
TBD
Shuwaiba-Toba-Hamar
132
Sabotage
ME
28 Feb
44 towers complete/44 req’d Baghd West – Jamia 132 Sabotage ME
TBD
Omara-Burzegan
132
Looting
ME
1 May
26 towers complete/126 req’d Temim- Tuz 132 Sabotage ME
TBD
Nejibiya – Hartha
132
Sabotage
ME
TBD
Lines Returned to service:
None reported today
Distribution:
Power transferred from North to Middle 850 MW.
Power transferred from South to Middle 180 MW.
GOVERNORATE
Peak Load MW
MWH
Average Load MW
Baghdad
1630
32844
1364
Duhok
82
2055
86
Naynawa
342
8265
344
Tamim
131
3618
151
Salah Aldeen
220
5158
215
Anbar
215
4422
184
Dyala
100
2213
92
Babil
100
2524
105
Kirbala
121
2928
122
Najaf
125
3087
129
Kadsya
50
1296
54
Wasit
90
2130
89
Muthana
65
1295
54
Nasirya
150
2761
115
Misan
65
1491
62
Basra
360
8080
337
Data compiled and reported by:
LTC Tharnell M. Thomas
CENTCOM LNO CPA Ministry of Electricity thomast2orha.centcom.mil Page PAGE 1 of NUMPAGES 3
الرئيسية / الخدمات الأساسية / ESS-9aed5136
الخدمات الأساسية
DAILY POWER SYSTEM HIGHLIGHTS FOR FEBRUARY 26, 2004
- التاريخ
- 26 شباط 2004
- الفئة
- الخدمات الأساسية
- النص متوفر
- الإنكليزية
- عدد الملفات
- 1
تظليل نتائج البحث عن: