DAILY POWER SYSTEM HIGHLIGHTS FOR MAY 9, 2004
The CPA Electricity Advisor issues this report to note significant events or conditions of interest in the power sector. The basic daily data on the power system is available on the CPA web site.
HIGHLIGHTS:
Generation:
Peak Power 3885Mw, 78,105Mw hours, 7-day Avg. 3740Mw Generators Returned to Service: (3) 220 Mw Baiji 2, SP 110 Mw Baiji 3, SP 85 Mw New Mulla 4 25 Mw
Generators Unscheduled Out of Service (21) 726 Mw PLANT
Type
SP, CP, RP, HP
Fault
Mw
* Baiji 4
SP
Excitor problem
85
* Dibis 1
SP
Boiler leak
8
Dibis 2
SP
Drum Level low
8
Najebia 5
SP
Thrust bearing problem
80
Mussaibe 4
SP
Oil Leak
230
* South Baghdad 5
SP
Air Heater
30
South Baghdad 6
SP
Boiler Leak
30
Baiji Mobile, 4
CP
Fuel Filters
25
Doura 1,2
CP
No gas pressure
40
* Khor Zubayr 4
CP
Oil Leak
40
Mosil 1
CP
Rotor Defect
15
Mosil 2
CP
Reverse Power
15
Mosil 9
CP
Reverse Power
15
Old Mulla 7
CP
High exhaust temp
15
Taji 1,2
CP
No gas pressure
30
Taji 3,
CP
Compressor
15
Taji 5
CP
High Exhaust Temp
15
M. Taji 1
CP
Planned Outage
15
M. Taji 2
CP
Software
15
RED – Denotes out of service since last report
Generators Scheduled Out of Service (26) 1226 Mw PLANT
Type
SP/NG
Prog. Maintenance(M) / Rehab (R) Maint.
Org.
Date out-of -service
Est. In-service Date
Mw
Baiji 1
SP
M
Bechtel
21 Mar 04
21 May
100
Dibis 3
SP
M
ME
26 Apr 04
TBD
8
Dibis 4
SP
M
ME
15 Mar 04
TBD
8
Doura 4
CP
M
ME
14 Apr 04
31 May
20
Doura 3
CP
R
ME
1 Mar 03
TBD
20
Doura 3
SP
M
ME
18 Mar 04
18 May
65
Doura 4
SP
M
ME
2 Feb 04
TBD
65
Doura 5
SP
R
Bechtel
Jul 03
20 Jun
100
Doura 6
SP
R
Bechtel
Jul 03
20 Jul
100
Dibis 4
CP
R
GRD/RIE
Sep 03
12 May
30
Hartha 1
SP
M
ME
22 Mar 04
23 May
100
Khor Zubayr 2
CP
R
GRD/RIE
15 Mar 04
3 Jul
50
Mosil 7
CP
M
ME
24 Apr 04
18 May
15
Mussaibe 2
SP
M (Additional work)
ME
28 Feb 04
20 May
200
Nassirya 1
SP
M
ME
30 Mar 04
21 May
130
New Mulla 6
CP
R
GRD/RIE
28 Mar 04
15 May
30
Old Mulla 1
CP
M
ME
17 Apr 04
15 May
15
Old Mulla 2
CP
M
ME
17 Apr 04
15 May
15
Old Mulla 8
CP
M
ME
17 Apr 04
12 May
15
Old Mulla 12
CP
R
GRD/RIE
1 Oct 03
15 May
15
South Baghdad 1
SP
M (Awaiting parts)
ME
12 Feb 04
21 May
30
South Baghdad 2
SP
M (Awaiting Parts)
ME
12 Feb 04
20 May
30
South Baghdad 3
SP
R
ME
18 Mar 04
6 Jun
20
Taji 4
CP
M
GRD/RIE
21 Apr 04
15 JUL
15
Taji 7
CP
R
GRD/RIE
1 Oct 03
15 JUL
15
Taji 6
CP
M
ME
2 Apr 04
26 May
15
New In-service date
LEGEND OF ELECTRICAL SYSTEM POWER SOURCE
SP: STEAM POWER – These plants use either fuel oil or crude in burners CP: COMBUSTION POWER RP: RECIPROCATING POWER HP: HYDRO POWER
Transmission:
LINE
Kv
Fault
Maint.
Org.
Date out-of -service
Est. In-service Date
Comments
Nassiriya-Khor Zubayr
400
Sabotage
Bechtel
26 May
159 towers complete/216req’d Haditha-Baghd West 400 Sabotage GRD/RIE
Complete
246 towers complete/246 req’d Hartha-Qut Wasit 400 Sabotage GRD/RIE
Complete
23 Apr Operational
Baiji - Baghd West #1
400
Sabotage
GRD/RIE
Complete
Operational
Baghd E.-Baghd S. #2
400
New Line
GRD/RIE
Complete
81 towers complete/81req’d Haditha – Qaim 400 Sabotage GRD-RIE
28 Feb 05
Start date 21 May 04
Baiji – Haditha
400
Sabotage
Bechtel
TBD
No contract awarded
Diyala Connection
400
New Line
ME
15 Jun
Foundations under construction Dibis/Erbil-Qara Qosh 132 New Line GRD/RIE
22 May
Construction ongoing
Dibis to Old Kirkuk
132
Reconductor
GRD-RIE
31 Jul
Bids for work under evaluation Mosul – Mosul East 132 Sabotage ME
TBD
Shuwaiba-Toba-Hamar
132
Sabotage
ME
Complete
44 towers complete/44 req’d Samediya – New Baghdad 132 Reconductor GRD-RIE
5 Jul
Assessment underway
Jazair to Yarmook
132
Reconductor
GRD-RIE
5 Jul
Assessment underway
Baghd West – Jamia
132
Sabotage
ME
TBD
Old Amarah-Burzulgan
132
Looting
GRD-RIE
25 Jun
Assessment underway
Temim- Tuz
132
Sabotage
ME
TBD
Nejibiya – Hartha
132
Sabotage
ME
TBD
Lines Returned to service:
Distribution: No report today Power transferred from North to Middle 950 MW.
Power transferred from South to Middle 250 MW.
GOVERNORATE
Peak Load MW
MWH
Average Load MW
Demand Load MW
Baghdad
1370
24008
1000
1544
Duhok
80
1895
79
110
Naynawa
250
6129
255
499
Tamim
130
2813
117
185
Salah Aldeen
210
4363
182
250
Anbar
108
4137
172
234
Dyala
70
1590
66
136
Babil
95
1924
80
140
Kirbala
65
1542
64
111
Najaf
95
1989
83
134
Kadsya
55
1147
48
95
Wasit
75
1750
73
123
Muthana
45
1154
48
76
Nasirya
120
2591
108
128
Misan
65
1405
59
81
Basra
320
6853
286
325
Data compiled and reported by:
LTC Tharnell M. Thomas
CENTCOM LNO CPA Ministry of Electricity thomast2orha.centcom.mil Page PAGE 1 of NUMPAGES 3
الرئيسية / الخدمات الأساسية / ESS-9ab563aa
الخدمات الأساسية
DAILY POWER SYSTEM HIGHLIGHTS FOR MAY 9, 2004
- التاريخ
- 9 أيار 2004
- الفئة
- الخدمات الأساسية
- النص متوفر
- الإنكليزية
- عدد الملفات
- 1
تظليل نتائج البحث عن: