DAILY POWER SYSTEM HIGHLIGHTS FOR MAY 9, 2004

التاريخ
9 أيار 2004
الفئة
الخدمات الأساسية
النص متوفر
الإنكليزية
عدد الملفات
1
الأصل الإنكليزي DOCتنزيل النص الإنكليزي
DAILY POWER SYSTEM HIGHLIGHTS FOR MAY 9, 2004 The CPA Electricity Advisor issues this report to note significant events or conditions of interest in the power sector. The basic daily data on the power system is available on the CPA web site. HIGHLIGHTS: Generation: Peak Power 3885Mw, 78,105Mw hours, 7-day Avg. 3740Mw Generators Returned to Service: (3) 220 Mw Baiji 2, SP 110 Mw Baiji 3, SP 85 Mw New Mulla 4 25 Mw Generators Unscheduled Out of Service (21) 726 Mw PLANT Type SP, CP, RP, HP Fault Mw * Baiji 4 SP Excitor problem 85 * Dibis 1 SP Boiler leak 8 Dibis 2 SP Drum Level low 8 Najebia 5 SP Thrust bearing problem 80 Mussaibe 4 SP Oil Leak 230 * South Baghdad 5 SP Air Heater 30 South Baghdad 6 SP Boiler Leak 30 Baiji Mobile, 4 CP Fuel Filters 25 Doura 1,2 CP No gas pressure 40 * Khor Zubayr 4 CP Oil Leak 40 Mosil 1 CP Rotor Defect 15 Mosil 2 CP Reverse Power 15 Mosil 9 CP Reverse Power 15 Old Mulla 7 CP High exhaust temp 15 Taji 1,2 CP No gas pressure 30 Taji 3, CP Compressor 15 Taji 5 CP High Exhaust Temp 15 M. Taji 1 CP Planned Outage 15 M. Taji 2 CP Software 15 RED – Denotes out of service since last report Generators Scheduled Out of Service (26) 1226 Mw PLANT Type SP/NG Prog. Maintenance(M) / Rehab (R) Maint. Org. Date out-of -service Est. In-service Date Mw Baiji 1 SP M Bechtel 21 Mar 04 21 May 100 Dibis 3 SP M ME 26 Apr 04 TBD 8 Dibis 4 SP M ME 15 Mar 04 TBD 8 Doura 4 CP M ME 14 Apr 04 31 May 20 Doura 3 CP R ME 1 Mar 03 TBD 20 Doura 3 SP M ME 18 Mar 04 18 May 65 Doura 4 SP M ME 2 Feb 04 TBD 65 Doura 5 SP R Bechtel Jul 03 20 Jun 100 Doura 6 SP R Bechtel Jul 03 20 Jul 100 Dibis 4 CP R GRD/RIE Sep 03 12 May 30 Hartha 1 SP M ME 22 Mar 04 23 May 100 Khor Zubayr 2 CP R GRD/RIE 15 Mar 04 3 Jul 50 Mosil 7 CP M ME 24 Apr 04 18 May 15 Mussaibe 2 SP M (Additional work) ME 28 Feb 04 20 May 200 Nassirya 1 SP M ME 30 Mar 04 21 May 130 New Mulla 6 CP R GRD/RIE 28 Mar 04 15 May 30 Old Mulla 1 CP M ME 17 Apr 04 15 May 15 Old Mulla 2 CP M ME 17 Apr 04 15 May 15 Old Mulla 8 CP M ME 17 Apr 04 12 May 15 Old Mulla 12 CP R GRD/RIE 1 Oct 03 15 May 15 South Baghdad 1 SP M (Awaiting parts) ME 12 Feb 04 21 May 30 South Baghdad 2 SP M (Awaiting Parts) ME 12 Feb 04 20 May 30 South Baghdad 3 SP R ME 18 Mar 04 6 Jun 20 Taji 4 CP M GRD/RIE 21 Apr 04 15 JUL 15 Taji 7 CP R GRD/RIE 1 Oct 03 15 JUL 15 Taji 6 CP M ME 2 Apr 04 26 May 15 New In-service date LEGEND OF ELECTRICAL SYSTEM POWER SOURCE SP: STEAM POWER – These plants use either fuel oil or crude in burners CP: COMBUSTION POWER RP: RECIPROCATING POWER HP: HYDRO POWER Transmission: LINE Kv Fault Maint. Org. Date out-of -service Est. In-service Date Comments Nassiriya-Khor Zubayr 400 Sabotage Bechtel 26 May 159 towers complete/216req’d Haditha-Baghd West 400 Sabotage GRD/RIE Complete 246 towers complete/246 req’d Hartha-Qut Wasit 400 Sabotage GRD/RIE Complete 23 Apr Operational Baiji - Baghd West #1 400 Sabotage GRD/RIE Complete Operational Baghd E.-Baghd S. #2 400 New Line GRD/RIE Complete 81 towers complete/81req’d Haditha – Qaim 400 Sabotage GRD-RIE 28 Feb 05 Start date 21 May 04 Baiji – Haditha 400 Sabotage Bechtel TBD No contract awarded Diyala Connection 400 New Line ME 15 Jun Foundations under construction Dibis/Erbil-Qara Qosh 132 New Line GRD/RIE 22 May Construction ongoing Dibis to Old Kirkuk 132 Reconductor GRD-RIE 31 Jul Bids for work under evaluation Mosul – Mosul East 132 Sabotage ME TBD Shuwaiba-Toba-Hamar 132 Sabotage ME Complete 44 towers complete/44 req’d Samediya – New Baghdad 132 Reconductor GRD-RIE 5 Jul Assessment underway Jazair to Yarmook 132 Reconductor GRD-RIE 5 Jul Assessment underway Baghd West – Jamia 132 Sabotage ME TBD Old Amarah-Burzulgan 132 Looting GRD-RIE 25 Jun Assessment underway Temim- Tuz 132 Sabotage ME TBD Nejibiya – Hartha 132 Sabotage ME TBD Lines Returned to service: Distribution: No report today Power transferred from North to Middle 950 MW. Power transferred from South to Middle 250 MW. GOVERNORATE Peak Load MW MWH Average Load MW Demand Load MW Baghdad 1370 24008 1000 1544 Duhok 80 1895 79 110 Naynawa 250 6129 255 499 Tamim 130 2813 117 185 Salah Aldeen 210 4363 182 250 Anbar 108 4137 172 234 Dyala 70 1590 66 136 Babil 95 1924 80 140 Kirbala 65 1542 64 111 Najaf 95 1989 83 134 Kadsya 55 1147 48 95 Wasit 75 1750 73 123 Muthana 45 1154 48 76 Nasirya 120 2591 108 128 Misan 65 1405 59 81 Basra 320 6853 286 325 Data compiled and reported by: LTC Tharnell M. Thomas CENTCOM LNO CPA Ministry of Electricity thomast2orha.centcom.mil Page PAGE 1 of NUMPAGES 3