DAILY POWER SYSTEM HIGHLIGHTS FOR MARCH 21, 2004
The CPA Electricity Advisor issues this report to note significant events or conditions of interest in the power sector. The basic daily data on the power system is available on the CPA web site.
HIGHLIGHTS:
We will continue to see decreased power as we enter into the spring maintenance period. Sabotage will continue to have unanticipated and detrimental effects on power output.
Generation:
Peak Power 4327Mw, 89,032Mw hours, 7-day Avg. 4144Mw
Generators Returned to Service: 190 Mw Baiji 2 , CP 110 Mw Qudas 2 50 Mw Taji 4 15 Mw Old Mulla 5 15 Mw
Generators Unscheduled Out of Service 383 Mw PLANT
Type
SP, CP, RP, HP
Fault
Mw
Dibis 4
SP
Fuel Filters
8
South Baghdad 5
SP
Air Heater
30
Nassirya 4
SP
Turbine
125
Khor Zubayr 4
CP
Flame out
40
Mosil 1
CP
Rotor Defect
15
Mosil 9
CP
Rotor Defect
15
Mosil 11
CP
Hydraulic Pressure
15
Old Mulla 1
CP
Acc Gear
15
Old Mulla 2
CP
Servo
15
Old Mulla 8
CP
Vibrations
15
Old Mulla 9,10
CP
Transformer damage
30
New Mulla 6
CP
Generator Defect
30
Taji 3,
CP
Compressor
15
Taji Mobile, 2
CP
Software problem
15
* RED – Denotes out of service since last report
Generators Scheduled Out of Service 1281 Mw PLANT
Type
SP/NG
Prog. Maintenance(M) / Rehab (R) Maint.
Org.
Date out-of -service
Est. In-service Date
Mw
Baiji 2
SP
M
Bechtel
2 Jan 04
22 Mar
100
Baiji 3
SP
M
Bechtel
29 Feb 04
1 May
100
Doura 2
CP
M
ME
21 Feb 04
15 May
20
Doura 3
CP
R
GRD/RIE
1 Mar 03
15 May
20
Doura 4
SP
M
ME
2 Feb 04
20 Apr
65
Doura 5
SP
R
Bechtel
Jul 03
30 Apr
100
Doura 6
SP
R
Bechtel
Jul 03
31May
100
Dibis 3
SP
M
ME
30Dec 03
31 May
8
Dibis 4
CP
R
GRD/RIE
Sep 03
1 May
18
Hilla 3
CP
M
ME
9 Mar 04
15 May
20
Khor Zubayr 2
CP
M
GRD/RIE
15 Mar 04
21 May
50
Mussaibe 2
SP
M
ME
28 Feb 04
28 Apr
200
Mussaibe 4
SP
M
ME
7 Feb 04
15 May
200
Nassirya 2
SP
M
ME
9 Mar 04
15 Apr
150
Old Mulla 12
CP
R
GRD/RIE
1 Oct 03
15 May
15
South Baghdad 3
SP
R
ME
18 Mar 04
18 May
20
Taji 7
CP
R
GRD/RIE
1 Oct 03
15 May
15
Shuaiba 1
CP
M
ME
14 Feb 04
31 May
20
South Baghdad 1
SP
M
ME
12 Feb 04
12 Apr
30
South Baghdad 2
SP
M
ME
12 Feb 04
12 Apr
30
LEGEND OF ELECTRICAL SYSTEM POWER SOURCE
SP: STEAM POWER – These plants use either fuel oil or crude in burners CP: COMBUSTION POWER RP: RECIPROCATING POWER HP: HYDRO POWER
Transmission:
LINE
Kv
Fault
Maint.
Org.
Date out-of -service
Est. In-service Date
Comments
Nassiriya-Khor Zubayr
400
Sabotage
Bechtel
26 May
102 towers complete/212req’d Haditha-Baghd West 400 Sabotage GRD/RIE
15 Apr
246 towers complete/246 req’d Hartha-Qut – Wasit 400 Sabotage GRD/RIE
Complete
297 towers complete/297 req’d Baiji - Baghd West #1 400 Sabotage GRD/RIE
31 Mar
68 towers complete/68 req’d Baghd E.-Baghd S. #2 400 New Line GRD/RIE
Complete
81 towers complete/81req’d Haditha – Qaim 400 Sabotage ME
TBD
No contract awarded
Baiji – Haditha
400
Sabotage
Bechtel
TBD
No contract awarded
Diyala Connection
400
New Line
ME
30 May
Dibis/Irbil-Quarqush
132
New Line
GRD/RIE
15 May
Mosul – Mosul East
132
Sabotage
ME
TBD
Shuwaiba-Toba-Hamar
132
Sabotage
ME
Complete
44 towers complete/44 req’d Baghd West – Jamia 132 Sabotage ME
TBD
Omara-Burzegan
132
Looting
ME
1 May
26 towers complete/126 req’d Temim- Tuz 132 Sabotage ME
TBD
Nejibiya – Hartha
132
Sabotage
ME
TBD
Lines Returned to service:
None reported today
Distribution:
Report Date -21 MARCH 2004 Power transferred from North to Middle 900 MW.
Power transferred from South to Middle 90 MW.
GOVERNORATE
Peak Load MW
MWH
Average Load MW
Baghdad
1420
Duhok
82
Naynawa
470
Tamim
203
Salah Aldeen
246
Anbar
215
Dyala
103
Babil
105
Kirbala
105
Najaf
120
Kadsya
65
Wasit
100
Muthana
65
Nasirya
125
Misan
70
Basra
310
Data compiled and reported by:
LTC Tharnell M. Thomas
CENTCOM LNO CPA Ministry of Electricity thomast2orha.centcom.mil Page PAGE 1 of NUMPAGES 3
الرئيسية / الخدمات الأساسية / ESS-95f06e56
الخدمات الأساسية
DAILY POWER SYSTEM HIGHLIGHTS FOR MARCH 21, 2004
- التاريخ
- 21 آذار 2004
- الفئة
- الخدمات الأساسية
- النص متوفر
- الإنكليزية
- عدد الملفات
- 1
تظليل نتائج البحث عن: