# A-Steam Power Stations
Report Date - 15 FEBRUARY 2004 A - Steam Power Stations Power Stations Type Fuel No. of Units No. of Operating Units Units Load (MW) Total Load MW Target Load MW Remarks 1 2 3 4 5 6 Dibis Natural Gas 4 1 8 8 24 #2 boiler leakage; #3 prog maint; #4 stopped at 142 boiler leakage Baiji Fuel Oil 6 3 90 75 95 260 500 #2 prog maint; #4 stopped at 516 boiler leakge; #5 forced outage Daura Fuel Oil 4 1 65 65 180 #3 synch at 1655; #4 prog maint; #5 & #6 rehab South Baghdad Fuel Oil 6 2 30 30 60 200 #1 & #2 prog maint; #3 hyd, system prob; #4 synch at 0012; #5 a/h Mussaibe Crude and Fuel Oil 4 3 200 200 200 600 860 #4 prog maint Nassirya Crude 4 3 165 165 145 475 600 #1 stopped at 800 con. Cleaning Najebia Natural Gas and Crude 2 2 35 80 115 160 #4 one boiler in operation Hartha Natural Gas and Crude 4 1 100 100 300 #4 prog maint Out of Service for Unscheduled Maintanence Total: 1683 2824 Out of Service for Program Maintanence/Rehab No activity Not Performing at Peak Performance
# B- Gas_C-Power Stations
Report Date - 15 FEBRUARY 2004 B- Gas Power Stations C -Hydro Power Stations Power Stations No. of Units No. of Operating Units Station Load Target Load Fuel Use Remarks Power Stations No. of Units No. of Operating Units Station Load Target Load Discharge m3/Sec Gas Pressure Baiji 2 125 Gas Oil #1 stopped at 630 line trip; #2 lub oil leak from bearing, Musil Dam Main 4 4 560 600 Quds 2 2 135 160 Gas Oil 29 trucks Musil Dam reg 4 4 36 60 1000 Mosil 12 10 68 150 23 #1 rotor defec; #9 rotor defect Musil Pumping 2 1 110 0 Dibis 3 2 55 30 26 #4 rehab Haditha Dam 6 2 140 160 300 Old Mulla 12 6 70 128 430 #1 acc gear; #2 servo; #3 prim prot; #5 prog maint; #10 prog maint; #12 needs rehab Samarra 3 2 42 55 400 New Mulla 6 4 60 173 2.9 #1 prog maint; #6 generator defect Himrin 2 2 42 21 130 Taji 7 5 70 55 18 #3 compressor; #7 needs rehab Hindia 4 4 5 5 115 M. Taji 2 1 7 18 18 #2 software Kufa 4 3 1 0 70 Daura 4 2 50 30 17 #3 needs rehab Total 936 896 Hilla 4 2 32 64 35 #1 cooling sys prob; #2 servo System Generation 83340 MWh Najaf 3 2 95 129 34 #2 prog maint Syrian Line Generation 942 MWh Khor 4 3 80 80 Natural Gas #4 rehab Turkey Line Generation 1819 MWh Shuaiba 2 1 6 20 Natural Gas #1 prog maint Total Generation 91541 MWh M. Shuaiba 2 Natural Gas split with the refinery System Peak Load 3754 MW Petro 4 1 10 0 Natural Gas Syria Peak Load MW M. Dibis 4 3 12 24 Natural Gas Turkey Peak Load 50 MW Mossil East 5 3 17 0 Gas Oil Fixed Gen Peak Load 266 MW Hmam/Zafranya 7 2 3 Gas Oil Total Peak Load 4070 MW Diesel 48 Gas Oil Baghdad Load 1520 MW Total 818 1186 Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590).
Edited by Electricity Commission U.S. Advisor Staff.
# Peak Loads
Report Date - 15 FEBRUARY 2004 GOVERNORATE Peak Load MW MWH Average Load MW Power transferred from North to Middle 800 MW.
Power transferred from South to Middle 220MW.
Baghdad 1520 32973 1374
Duhok 50 1912 80
Naynawa 330 9757 407
Tamim 121 3739 156
Salah Aldeen 185 5111 213
Anbar 180 4527 189
Dyala 100 2446 102
Babil 110 2571 107
Kirbala 110 2561 107
Najaf 120 2880 120
Kadsya 65 1518 63
Wasit 95 2364 99
Muthana 60 1396 58
Nasirya 120 2710 113
Misan 60 1466 61
Basra 260 7319 305
الرئيسية / الخدمات الأساسية / ESS-95ab75d6
الخدمات الأساسية
System Status Feb 15
- التاريخ
- 15 شباط 2004
- الفئة
- الخدمات الأساسية
- النص متوفر
- الإنكليزية
- عدد الملفات
- 1
معاينة الجدول
الورقة «A-Steam Power Stations»: 16 صفاً × 13 عموداً
| Report Date - 15 FEBRUARY 2004 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| A - Steam Power Stations | ||||||||||||
| Power Stations | Type Fuel | No. of Units | No. of Operating Units | Units Load (MW) | Total Load MW | Target Load MW | Remarks | |||||
| 1 | 2 | 3 | 4 | 5 | 6 | |||||||
| Dibis | Natural Gas | 4 | 1 | 8 | 8 | 24 | #2 boiler leakage; #3 prog maint; #4 stopped at 142 boiler leakage | |||||
| Baiji | Fuel Oil | 6 | 3 | 90 | 75 | 95 | 260 | 500 | #2 prog maint; #4 stopped at 516 boiler leakge; #5 forced outage | |||
| Daura | Fuel Oil | 4 | 1 | 65 | 65 | 180 | #3 synch at 1655; #4 prog maint; #5 & #6 rehab | |||||
| South Baghdad | Fuel Oil | 6 | 2 | 30 | 30 | 60 | 200 | #1 & #2 prog maint; #3 hyd, system prob; #4 synch at 0012; #5 a/h | ||||
| Mussaibe | Crude and Fuel Oil | 4 | 3 | 200 | 200 | 200 | 600 | 860 | #4 prog maint | |||
| Nassirya | Crude | 4 | 3 | 165 | 165 | 145 | 475 | 600 | #1 stopped at 800 con. Cleaning | |||
| Najebia | Natural Gas and Crude | 2 | 2 | 35 | 80 | 115 | 160 | #4 one boiler in operation | ||||
| Hartha | Natural Gas and Crude | 4 | 1 | 100 | 100 | 300 | #4 prog maint | |||||
| Out of Service for Unscheduled Maintanence | Total: | 1,683 | 2,824 | |||||||||
| Out of Service for Program Maintanence/Rehab | ||||||||||||
| No activity | ||||||||||||
| Not Performing at Peak Performance |
الورقة «B- Gas_C-Power Stations»: 26 صفاً × 13 عموداً
| Report Date - 15 FEBRUARY 2004 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| B- Gas Power Stations | C -Hydro Power Stations | |||||||||||
| Power Stations | No. of Units | No. of Operating Units | Station Load | Target Load | Fuel Use | Remarks | Power Stations | No. of Units | No. of Operating Units | Station Load | Target Load | Discharge m3/Sec |
| Gas Pressure | ||||||||||||
| Baiji | 2 | 125 | Gas Oil | #1 stopped at 630 line trip; #2 lub oil leak from bearing, | Musil Dam Main | 4 | 4 | 560 | 600 | |||
| Quds | 2 | 2 | 135 | 160 | Gas Oil | 29 trucks | Musil Dam reg | 4 | 4 | 36 | 60 | 1,000 |
| Mosil | 12 | 10 | 68 | 150 | 23 | #1 rotor defec; #9 rotor defect | Musil Pumping | 2 | 1 | 110 | 0 | |
| Dibis | 3 | 2 | 55 | 30 | 26 | #4 rehab | Haditha Dam | 6 | 2 | 140 | 160 | 300 |
| Old Mulla | 12 | 6 | 70 | 128 | 430 | #1 acc gear; #2 servo; #3 prim prot; #5 prog maint; #10 prog maint; #12 needs rehab | Samarra | 3 | 2 | 42 | 55 | 400 |
| New Mulla | 6 | 4 | 60 | 173 | 2.90 | #1 prog maint; #6 generator defect | Himrin | 2 | 2 | 42 | 21 | 130 |
| Taji | 7 | 5 | 70 | 55 | 18 | #3 compressor; #7 needs rehab | Hindia | 4 | 4 | 5 | 5 | 115 |
| M. Taji | 2 | 1 | 7 | 18 | 18 | #2 software | Kufa | 4 | 3 | 1 | 0 | 70 |
| Daura | 4 | 2 | 50 | 30 | 17 | #3 needs rehab | Total | 936 | 896 | |||
| Hilla | 4 | 2 | 32 | 64 | 35 | #1 cooling sys prob; #2 servo | System Generation | 83,340 | MWh | |||
| Najaf | 3 | 2 | 95 | 129 | 34 | #2 prog maint | Syrian Line Generation | 942 | MWh | |||
| Khor | 4 | 3 | 80 | 80 | Natural Gas | #4 rehab | Turkey Line Generation | 1,819 | MWh | |||
| Shuaiba | 2 | 1 | 6 | 20 | Natural Gas | #1 prog maint | Total Generation | 91,541 | MWh | |||
| M. Shuaiba | 2 | Natural Gas | split with the refinery | System Peak Load | 3,754 | MW | ||||||
| Petro | 4 | 1 | 10 | 0 | Natural Gas | Syria Peak Load | MW | |||||
| M. Dibis | 4 | 3 | 12 | 24 | Natural Gas | Turkey Peak Load | 50 | MW | ||||
| Mossil East | 5 | 3 | 17 | 0 | Gas Oil | Fixed Gen Peak Load | 266 | MW | ||||
| Hmam/Zafranya | 7 | 2 | 3 | Gas Oil | Total Peak Load | 4,070 | MW | |||||
| Diesel | 48 | Gas Oil | Baghdad Load | 1,520 | MW | |||||||
| Total | 818 | 1,186 | ||||||||||
| Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590). | ||||||||||||
| Edited by Electricity Commission U.S. Advisor Staff. |
الورقة «Peak Loads»: 24 صفاً × 4 أعمدة · المعاينة لأول 21 صفاً؛ الملف الكامل من زر الأصل
| Report Date - 15 FEBRUARY 2004 | |||
|---|---|---|---|
| GOVERNORATE | Peak Load MW | MWH | Average Load MW |
| Power transferred from North to Middle 800 MW. | |||
| Power transferred from South to Middle 220MW. | |||
| Baghdad | 1,520 | 32,973 | 1,374 |
| Duhok | 50 | 1,912 | 80 |
| Naynawa | 330 | 9,757 | 407 |
| Tamim | 121 | 3,739 | 156 |
| Salah Aldeen | 185 | 5,111 | 213 |
| Anbar | 180 | 4,527 | 189 |
| Dyala | 100 | 2,446 | 102 |
| Babil | 110 | 2,571 | 107 |
| Kirbala | 110 | 2,561 | 107 |
| Najaf | 120 | 2,880 | 120 |
| Kadsya | 65 | 1,518 | 63 |
| Wasit | 95 | 2,364 | 99 |
| Muthana | 60 | 1,396 | 58 |
| Nasirya | 120 | 2,710 | 113 |
| Misan | 60 | 1,466 | 61 |
| Basra | 260 | 7,319 | 305 |