Power Stations Type No. of Units No. of Operating Units Units Load (MW) Total Load MW Target Load Remarks Fuel 1 2 3 4 5 6 MW Dibis Natural Gas 4 2 0 8 0 8 16 24 No.1 mnt 10 DEC to 25 JAN. No 3 FDF.
Baiji Fuel Oil 6 4 95 75 70 100 0 0 340 500 No. 5 rehab. No. 6 mnt 5 DEC to 19 JAN. No. 2 synch at 0203. No. 3 synch 2040.
Dura Fuel Oil 4 2 80 90 0 0 170 180 Nos. 5 & 6: Rehab.
South Baghdad Fuel Oil 6 2 35 25 0 0 0 35 95 200 No. 5 mnt 1 DEC to 15 JAN. No. 3 and 4 starting.
Mussaibe Crude and Fuel Oil 4 3 215 100 0 215 530 860 No. 3 program mnt 3 NOV to 18 DEC. No. 2 synch 0229.
Nassirya Crude 4 3 130 145 0 100 375 600 No. 3 mnt 11 NOV to 15 DEC.
Najebia Natural Gas and Crude 2 1 0 0 0 160 No. 4 tripped 2000. No. 5 oil leak.
Hartha Natural Gas and Crude 4 1 140 0 140 300 No. 4 Mnt from 23 OCT to 23 DEC.
Total: 1666 2824
# B- Gas_C-Power Stations
Report Date- 28 DECEMBER 2003 B- Gas Power Stations C -Hydro Power Stations Power Stations No. of Units No. of Operating Units Station Load Target Load Fuel Use Remarks Power Stations No. of Units No. of Operating Units Station Load Target Load Discharge m3/Sec Gas Pressure Baiji 2 1 125 125 Gas Oil No. 2 insufficient fuel. Musil Dam Main 4 3 395 600 Quds 2 2 200 160 Gas Oil 36 trucks. Musil Dam reg 4 3 32 60 450 Mosil 12 8 120 150 27 No. 1 Rotor Defect. No. 2 servo ACC. No. 3 Prog Maint. No. 9 rotor defect. Musil Pumping 2 1 113 0 Dibis 3 0 0 60 27 No. 4, 5& 6 rehab. Haditha Dam 6 2 140 160 480 Old Mulla 12 5 70 128 510 No. 1 ACC gear. No. 2 servo. No. 4 tripped 2230 vibration. No. 5 Programmed Mnt. No. 6 acc gear. No. 7 programmed mnt. No. 12 rehab. Samarra 3 2 35 55 390 New Mulla 6 4 135 173 350 No. 5 programmed mnt. No. 6 Generator Defective. Himrin 2 1 22 21 Taji 7 2 39 55 19 No. 1 tripped 455 temp diff. No. 3 Compressor. No. 4 Turbine. No. 5 pilot excit. No. 7 Rehab. Hindia 4 3 5 5 M. Taji 2 1 7 20 0 No. 2 software. Kufa 4 0 0 1 Dura 4 3 75 30 18 No.3 Rehabilitation. Total 742 896 Hilla 4 4 70 64 32 System Generation 72246 MWh Najaf 3 2 95 129 31 No. 2 program mnt. Syrian Line Generation 1276 MWh Khor 4 3 90 80 Natural Gas No. 4: Rehabilitation. Turkey Line Generation 1897 MWh Shuaiba 2 1 10 20 Natural Gas No. 1 S/B Total Generation 75419 MWh Petro 4 0 0 0 Natural Gas System Peak Load 3358 MW M. Dibis 4 0 0 24 Natural Gas Syria Peak Load 20 MW Mossil East 5 3 15 15 Gas Oil Turkey Peak Load 80 MW Hmam/Zafranya 7 2 3 Gas Oil Fixed Gen Peak Load 77 MW Diesel 5 Total Peak Load 3535 MW Total 1059 1233 Baghdad Load 1480 MW Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590).
Edited by Electricity Commission U.S. Advisor Staff.
# Peak Loads
GOVERNORATE Peak Load MW MWH Average Load MW 28 December, 2003 Baghdad 1480 26888 1120.3333 Power transferred from North to Middle 530 MW.
Duhok 80 1892 78.8333
Naynawa 290 9024 376 Power transferred from South to Middle 120 MW.
Tamim 150 4174 173.9167
Salah Aldeen 200 4584 191
Anbar 171 3738 155.75
Dyala 70 1764 73.5
Babil 81 1682 70.0833
Kirbala 65 1365 56.875
Najaf 70 1645 68.5417
Kadsya 51 1130 47.0833
Wasit 58 1590 66.25
Muthana 40 1052 43.8333
Nasirya 115 2492 103.8333
Misan 55 1178 49.0833
Basra 245 5979 249.125
3221
NO DATA RECEIVED FROM ME
الرئيسية / الخدمات الأساسية / ESS-9364dc9c
الخدمات الأساسية
Power System 28 dec
- التاريخ
- 28 كانون الأول 2003
- الفئة
- الخدمات الأساسية
- النص متوفر
- الإنكليزية
- عدد الملفات
- 1
معاينة الجدول
الورقة «A-Steam Power Stations»: 13 صفاً × 13 عموداً
| REPORT DATE - 28 DECEMBER 2003 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| A - Steam Power Stations | ||||||||||||
| Power Stations | Type | No. of Units | No. of Operating Units | Units Load (MW) | Total Load MW | Target Load | Remarks | |||||
| Fuel | 1 | 2 | 3 | 4 | 5 | 6 | MW | |||||
| Dibis | Natural Gas | 4 | 2 | 0 | 8 | 0 | 8 | 16 | 24 | No.1 mnt 10 DEC to 25 JAN. No 3 FDF. | ||
| Baiji | Fuel Oil | 6 | 4 | 95 | 75 | 70 | 100 | 0 | 0 | 340 | 500 | No. 5 rehab. No. 6 mnt 5 DEC to 19 JAN. No. 2 synch at 0203. No. 3 synch 2040. |
| Dura | Fuel Oil | 4 | 2 | 80 | 90 | 0 | 0 | 170 | 180 | Nos. 5 & 6: Rehab. | ||
| South Baghdad | Fuel Oil | 6 | 2 | 35 | 25 | 0 | 0 | 0 | 35 | 95 | 200 | No. 5 mnt 1 DEC to 15 JAN. No. 3 and 4 starting. |
| Mussaibe | Crude and Fuel Oil | 4 | 3 | 215 | 100 | 0 | 215 | 530 | 860 | No. 3 program mnt 3 NOV to 18 DEC. No. 2 synch 0229. | ||
| Nassirya | Crude | 4 | 3 | 130 | 145 | 0 | 100 | 375 | 600 | No. 3 mnt 11 NOV to 15 DEC. | ||
| Najebia | Natural Gas and Crude | 2 | 1 | 0 | 0 | 0 | 160 | No. 4 tripped 2000. No. 5 oil leak. | ||||
| Hartha | Natural Gas and Crude | 4 | 1 | 140 | 0 | 140 | 300 | No. 4 Mnt from 23 OCT to 23 DEC. | ||||
| Total: | 1,666 | 2,824 |
الورقة «B- Gas_C-Power Stations»: 25 صفاً × 13 عموداً
| Report Date- 28 DECEMBER 2003 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| B- Gas Power Stations | C -Hydro Power Stations | |||||||||||
| Power Stations | No. of Units | No. of Operating Units | Station Load | Target Load | Fuel Use | Remarks | Power Stations | No. of Units | No. of Operating Units | Station Load | Target Load | Discharge m3/Sec |
| Gas Pressure | ||||||||||||
| Baiji | 2 | 1 | 125 | 125 | Gas Oil | No. 2 insufficient fuel. | Musil Dam Main | 4 | 3 | 395 | 600 | |
| Quds | 2 | 2 | 200 | 160 | Gas Oil | 36 trucks. | Musil Dam reg | 4 | 3 | 32 | 60 | 450 |
| Mosil | 12 | 8 | 120 | 150 | 27 | No. 1 Rotor Defect. No. 2 servo ACC. No. 3 Prog Maint. No. 9 rotor defect. | Musil Pumping | 2 | 1 | 113 | 0 | |
| Dibis | 3 | 0 | 0 | 60 | 27 | No. 4, 5& 6 rehab. | Haditha Dam | 6 | 2 | 140 | 160 | 480 |
| Old Mulla | 12 | 5 | 70 | 128 | 510 | No. 1 ACC gear. No. 2 servo. No. 4 tripped 2230 vibration. No. 5 Programmed Mnt. No. 6 acc gear. No. 7 programmed mnt. No. 12 rehab. | Samarra | 3 | 2 | 35 | 55 | 390 |
| New Mulla | 6 | 4 | 135 | 173 | 350 | No. 5 programmed mnt. No. 6 Generator Defective. | Himrin | 2 | 1 | 22 | 21 | |
| Taji | 7 | 2 | 39 | 55 | 19 | No. 1 tripped 455 temp diff. No. 3 Compressor. No. 4 Turbine. No. 5 pilot excit. No. 7 Rehab. | Hindia | 4 | 3 | 5 | 5 | |
| M. Taji | 2 | 1 | 7 | 20 | 0 | No. 2 software. | Kufa | 4 | 0 | 0 | 1 | |
| Dura | 4 | 3 | 75 | 30 | 18 | No.3 Rehabilitation. | Total | 742 | 896 | |||
| Hilla | 4 | 4 | 70 | 64 | 32 | System Generation | 72,246 | MWh | ||||
| Najaf | 3 | 2 | 95 | 129 | 31 | No. 2 program mnt. | Syrian Line Generation | 1,276 | MWh | |||
| Khor | 4 | 3 | 90 | 80 | Natural Gas | No. 4: Rehabilitation. | Turkey Line Generation | 1,897 | MWh | |||
| Shuaiba | 2 | 1 | 10 | 20 | Natural Gas | No. 1 S/B | Total Generation | 75,419 | MWh | |||
| Petro | 4 | 0 | 0 | 0 | Natural Gas | System Peak Load | 3,358 | MW | ||||
| M. Dibis | 4 | 0 | 0 | 24 | Natural Gas | Syria Peak Load | 20 | MW | ||||
| Mossil East | 5 | 3 | 15 | 15 | Gas Oil | Turkey Peak Load | 80 | MW | ||||
| Hmam/Zafranya | 7 | 2 | 3 | Gas Oil | Fixed Gen Peak Load | 77 | MW | |||||
| Diesel | 5 | Total Peak Load | 3,535 | MW | ||||||||
| Total | 1,059 | 1,233 | Baghdad Load | 1,480 | MW | |||||||
| Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590). | ||||||||||||
| Edited by Electricity Commission U.S. Advisor Staff. |
الورقة «Peak Loads»: 21 صفاً × 5 أعمدة
| GOVERNORATE | Peak Load MW | MWH | Average Load MW | 28 December, 2003 |
|---|---|---|---|---|
| Baghdad | 1,480 | 26,888 | 1,120.33 | Power transferred from North to Middle 530 MW. |
| Duhok | 80 | 1,892 | 78.83 | |
| Naynawa | 290 | 9,024 | 376 | Power transferred from South to Middle 120 MW. |
| Tamim | 150 | 4,174 | 173.92 | |
| Salah Aldeen | 200 | 4,584 | 191 | |
| Anbar | 171 | 3,738 | 155.75 | |
| Dyala | 70 | 1,764 | 73.50 | |
| Babil | 81 | 1,682 | 70.08 | |
| Kirbala | 65 | 1,365 | 56.88 | |
| Najaf | 70 | 1,645 | 68.54 | |
| Kadsya | 51 | 1,130 | 47.08 | |
| Wasit | 58 | 1,590 | 66.25 | |
| Muthana | 40 | 1,052 | 43.83 | |
| Nasirya | 115 | 2,492 | 103.83 | |
| Misan | 55 | 1,178 | 49.08 | |
| Basra | 245 | 5,979 | 249.12 | |
| 3,221 | ||||
| NO DATA RECEIVED FROM ME |