# A-Steam Power Stations
REPORT DATE - 13 DECEMBER 2003
A - Steam Power Stations
Power Stations Type No. of Units No. of Operating Units Units Load (MW) Total Load MW Target Load Remarks Fuel 1 2 3 4 5 6 MW Dibis Natural Gas 4 2 0 0 8 8 16 24 No.1 mnt 10 DEC to 25 JAN. No. 2 FWP.
Baiji Fuel Oil 6 4 100 85 85 105 0 0 375 500 No. 5 rehab. No. 6 mnt 5 DEC to 19 JAN. No. 1 synch 1618.
Dura Fuel Oil 4 1 75 0 0 0 75 180 No. 4 Mnt 10 OCT to 12 DEC. Nos. 5 & 6: Rehabilitation.
South Baghdad Fuel Oil 6 1 35 0 0 0 0 0 35 200 No. 6 mnt 11 NOV to 26 DEC. No. 5 mnt 1 DEC to 15 JAN. No. 2, 3 and 4 boiler leakage.
Mussaibe Crude and Fuel Oil 4 2 200 0 0 200 400 860 No. 3 program mnt 3 NOV to 18 DEC. No. 2 problem in sealing.
Nassirya Crude 4 2 0 145 0 100 245 600 No. 3 mnt 11 NOV to 11 DEC. No. 1 tripped 2350 boiler leak.
Najebia Natural Gas and Crude 2 1 0 90 90 160 No. 4 mnt 4 NOV to 22 DEC.
Hartha Natural Gas and Crude 4 1 150 0 150 300 No. 4 Mnt from 23 OCT to 23 DEC.
Total: 1386 2824
# B- Gas_C-Power Stations
Report Date- 13 DECEMBER 2003 B- Gas Power Stations C -Hydro Power Stations Power Stations No. of Units No. of Operating Units Station Load Target Load Fuel Use Remarks Power Stations No. of Units No. of Operating Units Station Load Target Load Discharge m3/Sec Gas Pressure Baiji 2 1 120 125 Gas Oil No. 2 lub oil leak. Musil Dam Main 4 3 390 600 Quds 2 2 210 160 Gas Oil 42 trucks. Musil Dam reg 4 3 35 60 450 Mosil 12 7 115 150 32 No. 1 rotor defect. No. 4 vibration. No. 2 ACC. No.3 and 8 program mnt. Musil Pumping 2 1 110 0 Dibis 3 0 0 60 25 No. 4, 5& 6 rehab. Haditha Dam 6 2 150 160 400 Old Mulla 12 8 123 128 470 No. 1 gas control. No. 2 servo and C/B. No. 5 Programmed Mnt. No. 12 rehab. No. 6 HET. Samarra 3 2 39 55 410 New Mulla 6 4 140 173 4 No. 6 Generator Defective. No. 3 Mnt. Himrin 2 1 19 21 75 Taji 7 2 38 55 16 No. 5 flame. No.7 Rehabilitation. No. 2 mnt. No. 4 turbine. No. 3 rotor. Hindia 4 4 4 5 85 M. Taji 2 0 0 20 0 No. 1 and 2 software. Kufa 4 0 0 1 0 Dura 4 2 16 30 15 No.3 Rehabilitation. No. 2 stopped 0110 NGPL. Total 747 896 Hilla 4 4 72 64 32 System Generation 72135 MWh Najaf 3 2 90 129 31 No. 2 program mnt. Syrian Line Generation 1292 MWh Khor 4 3 120 80 Natural Gas No. 4: Rehabilitation. Turkey Line Generation 867 MWh Shuaiba 2 0 0 20 Natural Gas No. 1 oil leak. No 2 VIB. Total Generation 74294 MWh Petro 4 1 10 0 Natural Gas System Peak Load 3460 MW M. Dibis 4 0 0 24 Natural Gas Syria Peak Load 25 MW Mossil East 5 0 0 15 Gas Oil Turkey Peak Load 60 MW Hmam 2 0 0 Gas Oil Fixed Gen Peak Load 77 MW Total Peak Load 3622 MW Total 1054 1233 Baghdad Load 1205 MW Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590).
Edited by Electricity Commission U.S. Advisor Staff.
# Peak Loads
GOVERNORATE Peak Load MW MWH Average Load MW 13 DECEMBER, 2003 Baghdad 1205 15 Power transferred from North to Middle 630 MW.
Duhok 60 15
Naynawa 240 15 Power transferred from South to Middle 180 MW.
Tamim 100 15
Salah Aldeen 195 15
Anbar 195 15
Dyala 87 15
Babil 93 15
Kirbala 65 15
Najaf 75 15
Kadsya 70 15
Wasit 85 15
Muthana 45 15
Nasirya 120 15
Misan 58 15
Basra 265 15
2958
MWH not provided by Ministry of Electricity
الرئيسية / الخدمات الأساسية / ESS-9319eab9
الخدمات الأساسية
Power System 14 dec
- التاريخ
- 14 كانون الأول 2003
- الفئة
- الخدمات الأساسية
- النص متوفر
- الإنكليزية
- عدد الملفات
- 1
معاينة الجدول
الورقة «A-Steam Power Stations»: 13 صفاً × 13 عموداً
| REPORT DATE - 13 DECEMBER 2003 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| A - Steam Power Stations | ||||||||||||
| Power Stations | Type | No. of Units | No. of Operating Units | Units Load (MW) | Total Load MW | Target Load | Remarks | |||||
| Fuel | 1 | 2 | 3 | 4 | 5 | 6 | MW | |||||
| Dibis | Natural Gas | 4 | 2 | 0 | 0 | 8 | 8 | 16 | 24 | No.1 mnt 10 DEC to 25 JAN. No. 2 FWP. | ||
| Baiji | Fuel Oil | 6 | 4 | 100 | 85 | 85 | 105 | 0 | 0 | 375 | 500 | No. 5 rehab. No. 6 mnt 5 DEC to 19 JAN. No. 1 synch 1618. |
| Dura | Fuel Oil | 4 | 1 | 75 | 0 | 0 | 0 | 75 | 180 | No. 4 Mnt 10 OCT to 12 DEC. Nos. 5 & 6: Rehabilitation. | ||
| South Baghdad | Fuel Oil | 6 | 1 | 35 | 0 | 0 | 0 | 0 | 0 | 35 | 200 | No. 6 mnt 11 NOV to 26 DEC. No. 5 mnt 1 DEC to 15 JAN. No. 2, 3 and 4 boiler leakage. |
| Mussaibe | Crude and Fuel Oil | 4 | 2 | 200 | 0 | 0 | 200 | 400 | 860 | No. 3 program mnt 3 NOV to 18 DEC. No. 2 problem in sealing. | ||
| Nassirya | Crude | 4 | 2 | 0 | 145 | 0 | 100 | 245 | 600 | No. 3 mnt 11 NOV to 11 DEC. No. 1 tripped 2350 boiler leak. | ||
| Najebia | Natural Gas and Crude | 2 | 1 | 0 | 90 | 90 | 160 | No. 4 mnt 4 NOV to 22 DEC. | ||||
| Hartha | Natural Gas and Crude | 4 | 1 | 150 | 0 | 150 | 300 | No. 4 Mnt from 23 OCT to 23 DEC. | ||||
| Total: | 1,386 | 2,824 |
الورقة «B- Gas_C-Power Stations»: 25 صفاً × 13 عموداً
| Report Date- 13 DECEMBER 2003 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| B- Gas Power Stations | C -Hydro Power Stations | |||||||||||
| Power Stations | No. of Units | No. of Operating Units | Station Load | Target Load | Fuel Use | Remarks | Power Stations | No. of Units | No. of Operating Units | Station Load | Target Load | Discharge m3/Sec |
| Gas Pressure | ||||||||||||
| Baiji | 2 | 1 | 120 | 125 | Gas Oil | No. 2 lub oil leak. | Musil Dam Main | 4 | 3 | 390 | 600 | |
| Quds | 2 | 2 | 210 | 160 | Gas Oil | 42 trucks. | Musil Dam reg | 4 | 3 | 35 | 60 | 450 |
| Mosil | 12 | 7 | 115 | 150 | 32 | No. 1 rotor defect. No. 4 vibration. No. 2 ACC. No.3 and 8 program mnt. | Musil Pumping | 2 | 1 | 110 | 0 | |
| Dibis | 3 | 0 | 0 | 60 | 25 | No. 4, 5& 6 rehab. | Haditha Dam | 6 | 2 | 150 | 160 | 400 |
| Old Mulla | 12 | 8 | 123 | 128 | 470 | No. 1 gas control. No. 2 servo and C/B. No. 5 Programmed Mnt. No. 12 rehab. No. 6 HET. | Samarra | 3 | 2 | 39 | 55 | 410 |
| New Mulla | 6 | 4 | 140 | 173 | 4 | No. 6 Generator Defective. No. 3 Mnt. | Himrin | 2 | 1 | 19 | 21 | 75 |
| Taji | 7 | 2 | 38 | 55 | 16 | No. 5 flame. No.7 Rehabilitation. No. 2 mnt. No. 4 turbine. No. 3 rotor. | Hindia | 4 | 4 | 4 | 5 | 85 |
| M. Taji | 2 | 0 | 0 | 20 | 0 | No. 1 and 2 software. | Kufa | 4 | 0 | 0 | 1 | 0 |
| Dura | 4 | 2 | 16 | 30 | 15 | No.3 Rehabilitation. No. 2 stopped 0110 NGPL. | Total | 747 | 896 | |||
| Hilla | 4 | 4 | 72 | 64 | 32 | System Generation | 72,135 | MWh | ||||
| Najaf | 3 | 2 | 90 | 129 | 31 | No. 2 program mnt. | Syrian Line Generation | 1,292 | MWh | |||
| Khor | 4 | 3 | 120 | 80 | Natural Gas | No. 4: Rehabilitation. | Turkey Line Generation | 867 | MWh | |||
| Shuaiba | 2 | 0 | 0 | 20 | Natural Gas | No. 1 oil leak. No 2 VIB. | Total Generation | 74,294 | MWh | |||
| Petro | 4 | 1 | 10 | 0 | Natural Gas | System Peak Load | 3,460 | MW | ||||
| M. Dibis | 4 | 0 | 0 | 24 | Natural Gas | Syria Peak Load | 25 | MW | ||||
| Mossil East | 5 | 0 | 0 | 15 | Gas Oil | Turkey Peak Load | 60 | MW | ||||
| Hmam | 2 | 0 | 0 | Gas Oil | Fixed Gen Peak Load | 77 | MW | |||||
| Total Peak Load | 3,622 | MW | ||||||||||
| Total | 1,054 | 1,233 | Baghdad Load | 1,205 | MW | |||||||
| Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590). | ||||||||||||
| Edited by Electricity Commission U.S. Advisor Staff. |
الورقة «Peak Loads»: 21 صفاً × 5 أعمدة · المعاينة لأول 20 صفاً؛ الملف الكامل من زر الأصل
| GOVERNORATE | Peak Load MW | MWH | Average Load MW | 13 DECEMBER, 2003 |
|---|---|---|---|---|
| Baghdad | 1,205 | 15 | Power transferred from North to Middle 630 MW. | |
| Duhok | 60 | 15 | ||
| Naynawa | 240 | 15 | Power transferred from South to Middle 180 MW. | |
| Tamim | 100 | 15 | ||
| Salah Aldeen | 195 | 15 | ||
| Anbar | 195 | 15 | ||
| Dyala | 87 | 15 | ||
| Babil | 93 | 15 | ||
| Kirbala | 65 | 15 | ||
| Najaf | 75 | 15 | ||
| Kadsya | 70 | 15 | ||
| Wasit | 85 | 15 | ||
| Muthana | 45 | 15 | ||
| Nasirya | 120 | 15 | ||
| Misan | 58 | 15 | ||
| Basra | 265 | 15 | ||
| 2,958 | ||||
| MWH not provided by Ministry of Electricity |
تظليل نتائج البحث عن: