# A-Steam Power Stations
REPORT DATE - 3 January 2004 A - Steam Power Stations Power Stations Type No. of Units No. of Operating Units Units Load (MW) Total Load MW Target Load Remarks Fuel 1 2 3 4 5 6 MW Dibis Natural Gas 4 1 0 0 0 8 8 24 No.1 mnt 10 DEC to 25 JAN. No 3 FDF. No. 2 stopped 1523 gas valve.
Baiji Fuel Oil 6 2 95 0 0 90 0 0 185 500 No. 5 rehab. No. 6 mnt 5 DEC to 19 JAN. No. 1 boiler leak. No. 2 stopped 1407 leak at HCL. No. 3 boiler leak.
Dura Fuel Oil 4 1 75 0 0 0 75 180 Nos. 5 & 6: Rehab. No. 4 stopped 0405 noise in bearing.
South Baghdad Fuel Oil 6 4 35 25 20 30 0 30 140 200 No. 5 mnt 1 DEC to 15 JAN.
Mussaibe Crude and Fuel Oil 4 2 215 0 0 220 435 860 No. 3 starting. No. 2 sealing.
Nassirya Crude 4 3 130 140 135 0 405 600 No. 4 programmed mnt 28 DEC to 28 JAN.
Najebia Natural Gas and Crude 2 1 30 0 30 160 No. stopped 1515 cooling eject sealing.
Hartha Natural Gas and Crude 4 1 130 0 130 300 No. 4 Mnt from 23 OCT to 23 DEC.
Total: 1408 2824
# B- Gas_C-Power Stations
Report Date- 3 January 2004 B- Gas Power Stations C -Hydro Power Stations Power Stations No. of Units No. of Operating Units Station Load Target Load Fuel Use Remarks Power Stations No. of Units No. of Operating Units Station Load Target Load Discharge m3/Sec Gas Pressure Baiji 2 1 125 125 Gas Oil No. 2 insufficient fuel. Musil Dam Main 4 3 390 600 Quds 2 1 112 160 Gas Oil 32 trucks. Musil Dam reg 4 3 30 60 450 Mosil 12 8 120 150 29 No. 1 Rotor Defect. No. 2 servo ACC. No. 3 Prog Maint. No. 9 rotor defect. Musil Pumping 2 1 110 0 Dibis 3 1 30 60 29 No. 4 and 5 rehab. No. 6 synch 1810 28 DEC. Haditha Dam 6 2 140 160 300 Old Mulla 12 6 63 128 490 No. 1 ACC gear. No. 2 servo. No. 5 Programmed Mnt. No. 6 acc gear. No. 7 programmed mnt. No. 12 rehab. Samarra 3 3 40 55 400 New Mulla 6 4 120 173 3.2 No. 5 programmed mnt. No. 6 Generator Defective. Himrin 2 1 22 21 90 Taji 7 3 42 55 18 No. 3 Compressor. No. 4 Turbine. No. 5 pilot excit. No. 7 Rehab. Hindia 4 3 4 5 M. Taji 2 1 7 20 Natural Gas No. 2 software. Kufa 4 0 0 1 Dura 4 3 70 30 17 No.3 Rehabilitation. Total 736 896 Hilla 4 4 65 64 32 System Generation 72722 MWh Najaf 3 2 98 129 28 No. 2 program mnt. Syrian Line Generation 1430 MWh Khor 4 3 120 80 Natural Gas No. 4: Rehabilitation. Turkey Line Generation 1874 MWh Shuaiba 2 1 10 20 Natural Gas No. 1 S/B Total Generation 76026 MWh Petro 4 1 0 0 Natural Gas System Peak Load 3290 MW M. Dibis 4 0 10 24 Natural Gas Syria Peak Load 60 MW Mossil East 5 0 0 15 Gas Oil Turkey Peak Load 80 MW Hmam/Zafranya 7 0 0 Gas Oil Fixed Gen Peak Load 77 MW Diesel 0 Gas Oil Total Peak Load 3507 MW Total 992 1233 Baghdad Load 1520 MW Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590).
Edited by Electricity Commission U.S. Advisor Staff.
# Peak Loads
Report Date - 3 January 2004 GOVERNORATE Peak Load MW MWH Average Load MW Power transferred from North to Middle 510 MW.
Power transferred from South to Middle 120 MW.
Baghdad 1350 27114 1129.75 Duhok 80 1780 74.1667 Naynawa 350 6588 274.5 Tamim 150 3190 132.9167 Salah Aldeen 185 4389 182.875 Anbar 170 3803 158.4583 Dyala 90 1698 70.75 Babil 75 1659 69.125 Kirbala 65 1414 58.9167 Najaf 110 1846 76.9167 Kadsya 45 1141 47.5417 Wasit 80 1753 73.0417 Muthana 55 1183 49.2917 Nasirya 115 2416 100.6667 Misan 50 1179 49.125 Basra 240 5510 229.5833
الرئيسية / الخدمات الأساسية / ESS-8dfc8303
الخدمات الأساسية
System Status Jan 03
- التاريخ
- 3 كانون الثاني 2004
- الفئة
- الخدمات الأساسية
- النص متوفر
- الإنكليزية
- عدد الملفات
- 1
معاينة الجدول
الورقة «A-Steam Power Stations»: 13 صفاً × 13 عموداً
| REPORT DATE - 3 January 2004 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| A - Steam Power Stations | ||||||||||||
| Power Stations | Type | No. of Units | No. of Operating Units | Units Load (MW) | Total Load MW | Target Load | Remarks | |||||
| Fuel | 1 | 2 | 3 | 4 | 5 | 6 | MW | |||||
| Dibis | Natural Gas | 4 | 1 | 0 | 0 | 0 | 8 | 8 | 24 | No.1 mnt 10 DEC to 25 JAN. No 3 FDF. No. 2 stopped 1523 gas valve. | ||
| Baiji | Fuel Oil | 6 | 2 | 95 | 0 | 0 | 90 | 0 | 0 | 185 | 500 | No. 5 rehab. No. 6 mnt 5 DEC to 19 JAN. No. 1 boiler leak. No. 2 stopped 1407 leak at HCL. No. 3 boiler leak. |
| Dura | Fuel Oil | 4 | 1 | 75 | 0 | 0 | 0 | 75 | 180 | Nos. 5 & 6: Rehab. No. 4 stopped 0405 noise in bearing. | ||
| South Baghdad | Fuel Oil | 6 | 4 | 35 | 25 | 20 | 30 | 0 | 30 | 140 | 200 | No. 5 mnt 1 DEC to 15 JAN. |
| Mussaibe | Crude and Fuel Oil | 4 | 2 | 215 | 0 | 0 | 220 | 435 | 860 | No. 3 starting. No. 2 sealing. | ||
| Nassirya | Crude | 4 | 3 | 130 | 140 | 135 | 0 | 405 | 600 | No. 4 programmed mnt 28 DEC to 28 JAN. | ||
| Najebia | Natural Gas and Crude | 2 | 1 | 30 | 0 | 30 | 160 | No. stopped 1515 cooling eject sealing. | ||||
| Hartha | Natural Gas and Crude | 4 | 1 | 130 | 0 | 130 | 300 | No. 4 Mnt from 23 OCT to 23 DEC. | ||||
| Total: | 1,408 | 2,824 |
الورقة «B- Gas_C-Power Stations»: 25 صفاً × 13 عموداً
| Report Date- 3 January 2004 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| B- Gas Power Stations | C -Hydro Power Stations | |||||||||||
| Power Stations | No. of Units | No. of Operating Units | Station Load | Target Load | Fuel Use | Remarks | Power Stations | No. of Units | No. of Operating Units | Station Load | Target Load | Discharge m3/Sec |
| Gas Pressure | ||||||||||||
| Baiji | 2 | 1 | 125 | 125 | Gas Oil | No. 2 insufficient fuel. | Musil Dam Main | 4 | 3 | 390 | 600 | |
| Quds | 2 | 1 | 112 | 160 | Gas Oil | 32 trucks. | Musil Dam reg | 4 | 3 | 30 | 60 | 450 |
| Mosil | 12 | 8 | 120 | 150 | 29 | No. 1 Rotor Defect. No. 2 servo ACC. No. 3 Prog Maint. No. 9 rotor defect. | Musil Pumping | 2 | 1 | 110 | 0 | |
| Dibis | 3 | 1 | 30 | 60 | 29 | No. 4 and 5 rehab. No. 6 synch 1810 28 DEC. | Haditha Dam | 6 | 2 | 140 | 160 | 300 |
| Old Mulla | 12 | 6 | 63 | 128 | 490 | No. 1 ACC gear. No. 2 servo. No. 5 Programmed Mnt. No. 6 acc gear. No. 7 programmed mnt. No. 12 rehab. | Samarra | 3 | 3 | 40 | 55 | 400 |
| New Mulla | 6 | 4 | 120 | 173 | 3.20 | No. 5 programmed mnt. No. 6 Generator Defective. | Himrin | 2 | 1 | 22 | 21 | 90 |
| Taji | 7 | 3 | 42 | 55 | 18 | No. 3 Compressor. No. 4 Turbine. No. 5 pilot excit. No. 7 Rehab. | Hindia | 4 | 3 | 4 | 5 | |
| M. Taji | 2 | 1 | 7 | 20 | Natural Gas | No. 2 software. | Kufa | 4 | 0 | 0 | 1 | |
| Dura | 4 | 3 | 70 | 30 | 17 | No.3 Rehabilitation. | Total | 736 | 896 | |||
| Hilla | 4 | 4 | 65 | 64 | 32 | System Generation | 72,722 | MWh | ||||
| Najaf | 3 | 2 | 98 | 129 | 28 | No. 2 program mnt. | Syrian Line Generation | 1,430 | MWh | |||
| Khor | 4 | 3 | 120 | 80 | Natural Gas | No. 4: Rehabilitation. | Turkey Line Generation | 1,874 | MWh | |||
| Shuaiba | 2 | 1 | 10 | 20 | Natural Gas | No. 1 S/B | Total Generation | 76,026 | MWh | |||
| Petro | 4 | 1 | 0 | 0 | Natural Gas | System Peak Load | 3,290 | MW | ||||
| M. Dibis | 4 | 0 | 10 | 24 | Natural Gas | Syria Peak Load | 60 | MW | ||||
| Mossil East | 5 | 0 | 0 | 15 | Gas Oil | Turkey Peak Load | 80 | MW | ||||
| Hmam/Zafranya | 7 | 0 | 0 | Gas Oil | Fixed Gen Peak Load | 77 | MW | |||||
| Diesel | 0 | Gas Oil | Total Peak Load | 3,507 | MW | |||||||
| Total | 992 | 1,233 | Baghdad Load | 1,520 | MW | |||||||
| Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590). | ||||||||||||
| Edited by Electricity Commission U.S. Advisor Staff. |
الورقة «Peak Loads»: 21 صفاً × 4 أعمدة
| Report Date - 3 January 2004 | |||
|---|---|---|---|
| GOVERNORATE | Peak Load MW | MWH | Average Load MW |
| Power transferred from North to Middle 510 MW. | |||
| Power transferred from South to Middle 120 MW. | |||
| Baghdad | 1,350 | 27,114 | 1,129.75 |
| Duhok | 80 | 1,780 | 74.17 |
| Naynawa | 350 | 6,588 | 274.50 |
| Tamim | 150 | 3,190 | 132.92 |
| Salah Aldeen | 185 | 4,389 | 182.88 |
| Anbar | 170 | 3,803 | 158.46 |
| Dyala | 90 | 1,698 | 70.75 |
| Babil | 75 | 1,659 | 69.12 |
| Kirbala | 65 | 1,414 | 58.92 |
| Najaf | 110 | 1,846 | 76.92 |
| Kadsya | 45 | 1,141 | 47.54 |
| Wasit | 80 | 1,753 | 73.04 |
| Muthana | 55 | 1,183 | 49.29 |
| Nasirya | 115 | 2,416 | 100.67 |
| Misan | 50 | 1,179 | 49.12 |
| Basra | 240 | 5,510 | 229.58 |
تظليل نتائج البحث عن: