System Status Apr 05

التاريخ
5 نيسان 2004
الفئة
الخدمات الأساسية
النص متوفر
الإنكليزية
عدد الملفات
1
الأصل الإنكليزي XLSتنزيل النص الإنكليزي

معاينة الجدول

الورقة «A-Steam Power Stations»: 16 صفاً × 13 عموداً

Reporting Peak for 03 APRIL 2004 / Report Date - 04 APRIL 2004
A - Steam Power Stations
Power StationsType FuelNo. of UnitsNo. of Operating UnitsUnits Load (MW)Total Load MWTarget Load MWRemarks
123456
DibisNatural Gas439892624
BaijiFuel Oil63808075235500
DauraFuel Oil40180
South BaghdadFuel Oil6330303090200
MussaibeCrude and Fuel Oil41210210860
NassiryaCrude40600
NajebiaNatural Gas and Crude229090180160
HarthaNatural Gas and Crude41170170300
Out of Service for Unscheduled MaintanenceTotal:9112,824
Out of Service for Program Maintanence/Rehab
No activity
Not Performing at Peak Performance
# A-Steam Power Stations Reporting Peak for 03 APRIL 2004 / Report Date - 04 APRIL 2004 A - Steam Power Stations Power Stations Type Fuel No. of Units No. of Operating Units Units Load (MW) Total Load MW Target Load MW Remarks 1 2 3 4 5 6 Dibis Natural Gas 4 3 9 8 9 26 24 Baiji Fuel Oil 6 3 80 80 75 235 500 Daura Fuel Oil 4 0 180 South Baghdad Fuel Oil 6 3 30 30 30 90 200 Mussaibe Crude and Fuel Oil 4 1 210 210 860 Nassirya Crude 4 0 600 Najebia Natural Gas and Crude 2 2 90 90 180 160 Hartha Natural Gas and Crude 4 1 170 170 300 Out of Service for Unscheduled Maintanence Total: 911 2824 Out of Service for Program Maintanence/Rehab No activity Not Performing at Peak Performance # B- Gas_C-Power Stations Reporting Peak for 03 APRIL 2004 / Report Date - 04 APRIL 2004 B- Gas Power Stations C -Hydro Power Stations Power Stations No. of Units No. of Operating Units Station Load Target Load Fuel Use Remarks Power Stations No. of Units No. of Operating Units Station Load Target Load Discharge m3/Sec Gas Pressure Baiji 2 2 180 125 Gas Oil Musil Dam Main 4 4 616 600 M. Baiji 8 4 69 Gas Oil Musil Dam reg 4 4 48 60 Quds 2 2 246 160 Gas Oil Musil Pumping 2 1 110 0 Mosil 12 7 200 150 Haditha Dam 6 160 Dibis 3 1 112.5 30 Samarra 3 3 70 55 Old Mulla 12 5 220 128 Himrin 2 2 41 21 New Mulla 6 5 222 173 Hindia 4 2 3 5 Taji 7 3 120 55 Kufa 4 2 1 0 M. Taji 2 1 24 18 Total 889 896 Daura 4 3 150 30 System Generation MWh Hilla 4 4 80 64 Syrian Line Generation MWh Najaf 3 3 189 129 Turkey Line Generation MWh Khor 4 4 252 80 Natural Gas Total Generation 80213 MWh Shuaiba 2 1 40 20 Natural Gas System Peak Load 3260 MW M. Shuaiba 2 Natural Gas Syria Peak Load 60 MW Petro 4 1 10 0 Natural Gas Turkey Peak Load 80 MW M. Dibis 4 3 50 24 Natural Gas Fixed Gen Peak Load 266 MW Mossil East 5 3 40 0 Gas Oil Total Peak Load 3666 MW Hmam/Zafranya 7 2 53 Gas Oil Baghdad Load 1190 MW Diesel Gas Oil Total 2257.5 1186 Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590). Edited by Electricity Commission U.S. Advisor Staff. # Peak Loads Reporting Peak for 03 APRIL 2004 / Report Date - 04 APRIL 2004 GOVERNORATE Peak Load MW MWH Average Load MW Demand Load MW Baghdad 190 Duhok 80 Naynawa 300 Tamim 120 Salah Aldeen 210 Anbar 200 Dyala 85 Babil 90 Kirbala 120 Najaf 140 Kadsya 65 Wasit 90 Muthana 65 Nasirya 120 Misan 65 Basra 275