# A-Steam Power Stations
REPORT DATE - 19 January 2004 A - Steam Power Stations Power Stations Type No. of Units No. of Operating Units Units Load (MW) Total Load MW Target Load Remarks Fuel 1 2 3 4 5 6 MW Dibis Natural Gas 4 2 8 8 16 24 #1 synch at 1333; #2 boiler leakage; #3 prog maint Baiji Fuel Oil 6 3 90 100 100 290 500 #2 prog. maint; #5 forced outage; #6 prog maint Daura Fuel Oil 4 1 80 80 180 #4 rotor repair; #(5+6) Rehab South Baghdad Fuel Oil 6 4 30 20 30 30 110 200 #1 synch at 1450; #2 air heater defect; #5 prog maint Mussaibe Crude and Fuel Oil 4 4 210 150 100 220 680 860 #3 synch at 1805 Nassirya Crude 4 3 130 140 150 420 600 #4 prog maint. 28 DEC to 28 JAN.
Najebia Natural Gas and Crude 2 2 80 80 160 160 Hartha Natural Gas and Crude 4 1 140 140 300 #4 prog maint Out of Service for Unscheduled Maintanence Total: 1896 2824 Out of Service for Program Maintanence/Rehab No activity Not Performing at Peak Performance
# B- Gas_C-Power Stations
Report Date- 19 January 2004 B- Gas Power Stations C -Hydro Power Stations Power Stations No. of Units No. of Operating Units Station Load Target Load Fuel Use Remarks Power Stations No. of Units No. of Operating Units Station Load Target Load Discharge m3/Sec Gas Pressure Baiji 2 1 125 125 Gas Oil #2 lubricating oil leak from bearing Musil Dam Main 4 3 380 600 Quds 2 2 130 160 Gas Oil 35 trucks Musil Dam reg 4 3 38 60 450 Mosil 12 7 110 150 28 #1 rotor defect; #2 servo + ACC; #3 prog maint; #6 diesel; #9 rotor defect Musil Pumping 2 1 110 0 Dibis 3 1 30 30 34 #4 and #5 rehab Haditha Dam 6 2 125 160 250 Old Mulla 12 5 64 128 520 #1 ACC gear, #2 servo, #3 prime protec; #6 stopped at 1654 c/b; #10 prog maint; #12 rehab Samarra 3 2 33 55 320 New Mulla 6 4 95 173 30 #4 & #5 prog maint; #6 Generator defect Himrin 2 1 22 21 90 Taji 7 5 62 55 17.5 #3 Compressor; #7 Rehab Hindia 4 4 5 5 80 M. Taji 2 1 7 18 17 #2 software. Kufa 4 0 0 0 Daura 4 3 65 30 16 #3 Rehab Total 713 896 Hilla 4 4 72 64 21 System Generation 75368 MWh Najaf 3 2 90 129 19 #2 prog maint Syrian Line Generation 1431 MWh Khor 4 2 80 80 Natural Gas #3 prog maint; #4 Rehab Turkey Line Generation 1908 MWh Shuaiba 2 1 5 20 Natural Gas #2 S/B Total Generation 78787 MWh M. Shuaiba 2 Natural Gas System Peak Load 3630 MW Petro 4 1 10 0 Natural Gas Syria Peak Load 60 MW M. Dibis 4 3 9 24 Natural Gas Turkey Peak Load 80 MW Mossil East 5 2 12 0 Gas Oil Fixed Gen Peak Load 77 MW Hmam/Zafranya 7 2 3 Gas Oil Total Peak Load 3847 MW Diesel 23 Gas Oil Baghdad Load 1375 MW Total 992 1186 Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590).
Edited by Electricity Commission U.S. Advisor Staff.
# Peak Loads
Report Date - 19 January 2004 GOVERNORATE Peak Load MW MWH Average Load MW Power transferred from North to Middle 480 MW.
Power transferred from South to Middle 165 MW.
Baghdad 1375 29501 1229
Duhok 80 1892 79
Naynawa 335 7148 298
Tamim 128 3270 136
Salah Aldeen 195 4411 184
Anbar 195 3748 156
Dyala 85 1958 82
Babil 85 2069 86
Kirbala 85 1934 81
Najaf 110 2438 102
Kadsya 75 1460 61
Wasit 85 1995 83
Muthana 59 1313 55
Nasirya 125 2699 112
Misan 56 1382 58
Basra 310 6942 289
الرئيسية / الخدمات الأساسية / ESS-87124d81
الخدمات الأساسية
System Status Jan 19
- التاريخ
- 19 كانون الثاني 2004
- الفئة
- الخدمات الأساسية
- النص متوفر
- الإنكليزية
- عدد الملفات
- 1
معاينة الجدول
الورقة «A-Steam Power Stations»: 16 صفاً × 13 عموداً
| REPORT DATE - 19 January 2004 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| A - Steam Power Stations | ||||||||||||
| Power Stations | Type | No. of Units | No. of Operating Units | Units Load (MW) | Total Load MW | Target Load | Remarks | |||||
| Fuel | 1 | 2 | 3 | 4 | 5 | 6 | MW | |||||
| Dibis | Natural Gas | 4 | 2 | 8 | 8 | 16 | 24 | #1 synch at 1333; #2 boiler leakage; #3 prog maint | ||||
| Baiji | Fuel Oil | 6 | 3 | 90 | 100 | 100 | 290 | 500 | #2 prog. maint; #5 forced outage; #6 prog maint | |||
| Daura | Fuel Oil | 4 | 1 | 80 | 80 | 180 | #4 rotor repair; #(5+6) Rehab | |||||
| South Baghdad | Fuel Oil | 6 | 4 | 30 | 20 | 30 | 30 | 110 | 200 | #1 synch at 1450; #2 air heater defect; #5 prog maint | ||
| Mussaibe | Crude and Fuel Oil | 4 | 4 | 210 | 150 | 100 | 220 | 680 | 860 | #3 synch at 1805 | ||
| Nassirya | Crude | 4 | 3 | 130 | 140 | 150 | 420 | 600 | #4 prog maint. 28 DEC to 28 JAN. | |||
| Najebia | Natural Gas and Crude | 2 | 2 | 80 | 80 | 160 | 160 | |||||
| Hartha | Natural Gas and Crude | 4 | 1 | 140 | 140 | 300 | #4 prog maint | |||||
| Out of Service for Unscheduled Maintanence | Total: | 1,896 | 2,824 | |||||||||
| Out of Service for Program Maintanence/Rehab | ||||||||||||
| No activity | ||||||||||||
| Not Performing at Peak Performance |
الورقة «B- Gas_C-Power Stations»: 26 صفاً × 13 عموداً
| Report Date- 19 January 2004 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| B- Gas Power Stations | C -Hydro Power Stations | |||||||||||
| Power Stations | No. of Units | No. of Operating Units | Station Load | Target Load | Fuel Use | Remarks | Power Stations | No. of Units | No. of Operating Units | Station Load | Target Load | Discharge m3/Sec |
| Gas Pressure | ||||||||||||
| Baiji | 2 | 1 | 125 | 125 | Gas Oil | #2 lubricating oil leak from bearing | Musil Dam Main | 4 | 3 | 380 | 600 | |
| Quds | 2 | 2 | 130 | 160 | Gas Oil | 35 trucks | Musil Dam reg | 4 | 3 | 38 | 60 | 450 |
| Mosil | 12 | 7 | 110 | 150 | 28 | #1 rotor defect; #2 servo + ACC; #3 prog maint; #6 diesel; #9 rotor defect | Musil Pumping | 2 | 1 | 110 | 0 | |
| Dibis | 3 | 1 | 30 | 30 | 34 | #4 and #5 rehab | Haditha Dam | 6 | 2 | 125 | 160 | 250 |
| Old Mulla | 12 | 5 | 64 | 128 | 520 | #1 ACC gear, #2 servo, #3 prime protec; #6 stopped at 1654 c/b; #10 prog maint; #12 rehab | Samarra | 3 | 2 | 33 | 55 | 320 |
| New Mulla | 6 | 4 | 95 | 173 | 30 | #4 & #5 prog maint; #6 Generator defect | Himrin | 2 | 1 | 22 | 21 | 90 |
| Taji | 7 | 5 | 62 | 55 | 17.50 | #3 Compressor; #7 Rehab | Hindia | 4 | 4 | 5 | 5 | 80 |
| M. Taji | 2 | 1 | 7 | 18 | 17 | #2 software. | Kufa | 4 | 0 | 0 | 0 | |
| Daura | 4 | 3 | 65 | 30 | 16 | #3 Rehab | Total | 713 | 896 | |||
| Hilla | 4 | 4 | 72 | 64 | 21 | System Generation | 75,368 | MWh | ||||
| Najaf | 3 | 2 | 90 | 129 | 19 | #2 prog maint | Syrian Line Generation | 1,431 | MWh | |||
| Khor | 4 | 2 | 80 | 80 | Natural Gas | #3 prog maint; #4 Rehab | Turkey Line Generation | 1,908 | MWh | |||
| Shuaiba | 2 | 1 | 5 | 20 | Natural Gas | #2 S/B | Total Generation | 78,787 | MWh | |||
| M. Shuaiba | 2 | Natural Gas | System Peak Load | 3,630 | MW | |||||||
| Petro | 4 | 1 | 10 | 0 | Natural Gas | Syria Peak Load | 60 | MW | ||||
| M. Dibis | 4 | 3 | 9 | 24 | Natural Gas | Turkey Peak Load | 80 | MW | ||||
| Mossil East | 5 | 2 | 12 | 0 | Gas Oil | Fixed Gen Peak Load | 77 | MW | ||||
| Hmam/Zafranya | 7 | 2 | 3 | Gas Oil | Total Peak Load | 3,847 | MW | |||||
| Diesel | 23 | Gas Oil | Baghdad Load | 1,375 | MW | |||||||
| Total | 992 | 1,186 | ||||||||||
| Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590). | ||||||||||||
| Edited by Electricity Commission U.S. Advisor Staff. |
الورقة «Peak Loads»: 24 صفاً × 4 أعمدة · المعاينة لأول 21 صفاً؛ الملف الكامل من زر الأصل
| Report Date - 19 January 2004 | |||
|---|---|---|---|
| GOVERNORATE | Peak Load MW | MWH | Average Load MW |
| Power transferred from North to Middle 480 MW. | |||
| Power transferred from South to Middle 165 MW. | |||
| Baghdad | 1,375 | 29,501 | 1,229 |
| Duhok | 80 | 1,892 | 79 |
| Naynawa | 335 | 7,148 | 298 |
| Tamim | 128 | 3,270 | 136 |
| Salah Aldeen | 195 | 4,411 | 184 |
| Anbar | 195 | 3,748 | 156 |
| Dyala | 85 | 1,958 | 82 |
| Babil | 85 | 2,069 | 86 |
| Kirbala | 85 | 1,934 | 81 |
| Najaf | 110 | 2,438 | 102 |
| Kadsya | 75 | 1,460 | 61 |
| Wasit | 85 | 1,995 | 83 |
| Muthana | 59 | 1,313 | 55 |
| Nasirya | 125 | 2,699 | 112 |
| Misan | 56 | 1,382 | 58 |
| Basra | 310 | 6,942 | 289 |