الرئيسية / الخدمات الأساسية / ESS-7eeac23a

الخدمات الأساسية

Power System Highlights for December 31, 2003

التاريخ
31 كانون الأول 2003
الفئة
الخدمات الأساسية
النص متوفر
الإنكليزية
عدد الملفات
1
الأصل الإنكليزي DOCتنزيل النص الإنكليزي
Power System Highlights for December 31, 2003 The CPA Electricity Advisor issues this report to note significant events or conditions of interest in the power sector. The basic daily data on the power system is available on the CPA web site. HIGHLIGHTS: Nassirya 3 returned to service 33 days ahead of schedule, producing 70 Mw Generation: Daily System peak on 30 Dec – 3,612Mw. Daily system Demand on 30 Dec – 5,545 Mw (Estimated) (3612, Actual Generation + 1650, Load Shed + 283, Corrected Frequency = 5545) Total generation – 72,531Mwh Imported power - Power from Syria (40Mw) and Turkey (80Mw) included in System Peak Generators Returned to Service 270 Mw Baiji 2 90 Mw Old Mulla 9 15 Mw Nassirya 3 130 Mw Najebia 5 35 Mw Generators Unscheduled Out of Service as of 30 DEC 03 748 Mw Dibis 3 SP, tripped due to feed water pump problem -------------------- 8 Mw * Baiji 1, Boiler Leak ----------------------------------------------------------- 100 Mw * Baiji 4, Stopped, Unknown Reason at report time ------------------ 100 Mw *South Baghdad # 3, 12/30 valve trip ---------------------------------------- 35 Mw Mussaibe2, SP, Limited to 80 Mw, cold water pressure ---------------120 Mw Daura 4, SP, Boiler Leak, 12/28 --------------------------------------------- 80 Mw Old Mulla 1,NG, Acc Gear -------------------------------------------------------15 Mw Old Mulla 2, NG, Servo and Circuit breaker problem --------------------15 Mw Old Mulla 4, NG, Vibration trip ------------------------------------------------- 15 Mw Old Mulla 6, NG, Accessory Gear ---------------------------------------------15 Mw New Mulla 6, NG, Generator Defect ---------------------------------------- 30 Mw Taji 3, NG, Compressor ----------------------------------------------------------15 Mw Taji 4, NG, Turbine problem -----------------------------------------------------15 Mw Taji 5, NG, Pilot Problem ---------------------------------------------------------15 Mw Taji 6, NG,Auxillary -----------------------------------------------------------------15 Mw Taji Mobile, 2, NG, Software problem -----------------------------------------10 Mw Mosil 1, NG, Rotor Defect ------------------------------------------------------- 15 Mw Mosil 2, NG, Servo problem -----------------------------------------------------15 Mw Mosil 9, NG, Rotor Defect ------------------------------------------------------- 15 Mw Shuaiba 1, NG, S/B ----------------------------------------------------------------10 Mw Najebia 4, SP, Boiler Leak ------------------------------------------------------- 90 Mw , * RED – Denotes out of service since last report Generators Scheduled Out of Service as of 30 DEC 03 1071 Mw 2 Thermal units off-line for rehabilitation --------------------------------- 200 Mw Daura 5 and 6 – 200 Mw – ECD May 2004 6 Thermal units in programmed maintenance -------------------------- 623 Mw Dibis 1 – 8 Mw – ECD Jan 25 Baiji 6 -100 Mw – ECD Jan 19 South Baghdad 5 35 Mw – ECD Jan 15 Mussaibe 3 200 Mw – ECD TBD (Not Complete yet-expect soon) Nassirya 4 130 Mw – ECD Feb 15 Hartha 4 150 Mw – ECD slipped to 23 Jan 6 Gas Turbine units off-line for rehabilitation ------------------------------123 Mw Dibis 4, 5, 18 Mw Old Mulla 12 15 Mw Taji 7 15 Mw Daura 3 20 Mw Khor Zubayr 4 55 Mw 5 Gas Turbine units in programmed maintenance------------------------125 Mw Mosil 3 15 Mw Old Mulla 5,7 30 Mw New Mulla 5 30 Mw Najaf 2 50 Mw Transmission: Countrywide, Iraq’s electrical output continues to be constrained by damaged transmission and distribution lines. The lines have come down due to sabotage and bad weather. Downed transmission lines increase the probability for complete nationwide blackout by reducing system contingency and causing mechanical damage at power plants. This may cause further temporary blackouts, which have already directly resulted in 1) impacted refineries causing reduced fuel flow to power plants and a subsequent reduction in power supply, and 2) damages in the power plants due to undercurrent causing units to come off-line for unscheduled maintenance. Transmission Lines out of service: 400KV Hartha to Khor Zubar – Increased load shedding in Basra region. No ECD Haditha-Baghdad West –ECD slipped from Jan 24 to Feb 29 Haditha-Qarna – Wasit – ECD slipped from Jan 12 to Jan 24 Baghdad South – Qadisseya – ECD Jan 20 Baiji - Baghdad West #1 – ECD Jan 20 New line - Baghdad East-Baghdad South #2 – ECD Jan 23 Babil-Qadisiyah (collapsed towers/stolen conductors ECD 20 JAN) Haditha – Qaim – no funding Baiji – Haditha – no funding/no contractor 132KV Mosul – Mosul East is sabotaged Musalla – Rumala 132 Kv line still being sabotaged – 4 more towers down – now total of 7. This line ties the South generation to the North Muthena GPS – Dour - ECD Dec 28 ( No confirmation) Shuwaiba-Toba-Hamar– ECD Dec 30, delay due to material shortage Baghdad West – Faluja, tripped No ECD Omara-Burzegan – Sabotaged. ECD March 2004 Lines Returned to service: None reported today LEGEND OF ELECTRICAL SYSTEM POWER SOURCE NG: NATURAL GAS SP: STEAM POWER – These plants use either fuel oil or crude in burners HYDRO: WATER POWER Page PAGE 3 of NUMPAGES 3