REPORT DATE - 17 January 2004 A - Steam Power Stations Power Stations Type No. of Units No. of Operating Units Units Load (MW) Total Load MW Target Load Remarks Fuel 1 2 3 4 5 6 MW Dibis Natural Gas 4 1 8 8 24 #1 prog maint; #2 boiler leakeage; #3 prog maint Baiji Fuel Oil 6 3 90 95 100 285 500 #2 prog. maint; #3 synch at 1340; #5 forced outage; #6 prog maint Daura Fuel Oil 4 1 75 75 180 #4 rotor repair; #(5+6) Rehab South Baghdad Fuel Oil 6 1 20 20 200 #1 stopped at 256 boiler leakage; #2 air heater defect; #4 stopped at 1628 boiler leakage; #5 prog maint; #6 stopped at 1115 excit. Fail Mussaibe Crude and Fuel Oil 4 3 210 100 225 535 860 #1 synch at 1613; #3 stopped at 1454 boiler leakage Nassirya Crude 4 3 130 140 150 420 600 #4 prog maint. 28 DEC to 28 JAN.
Najebia Natural Gas and Crude 2 2 30 85 115 160 #4 one boiler in operation Hartha Natural Gas and Crude 4 1 140 140 300 #1 stopped at 1228 air press. Dropped, synch at 1602; #4 prog maint Out of Service for Unscheduled Maintanence Total: 1598 2824 Out of Service for Program Maintanence/Rehab No activity Not Performing at Peak Performance
# B- Gas_C-Power Stations
Report Date- 17 January 2004 B- Gas Power Stations C -Hydro Power Stations Power Stations No. of Units No. of Operating Units Station Load Target Load Fuel Use Remarks Power Stations No. of Units No. of Operating Units Station Load Target Load Discharge m3/Sec Gas Pressure Baiji 2 1 130 125 Gas Oil #1 synch at 1605; #2 lubricating oil leak from bearing Musil Dam Main 4 3 390 600 Quds 2 2 193 160 Gas Oil 35 trucks Musil Dam reg 4 3 36 60 450 Mosil 12 7 114 150 25 #1 rotor defect; #2 servo + ACC; #3 prog maint; #6 diesel; #9 rotor defect Musil Pumping 2 1 110 0 Dibis 3 1 25 30 30 #4 and #5 rehab Haditha Dam 6 2 130 160 300 Old Mulla 12 8 103 128 450 #1 ACC gear; #2 servo; #5 prog maint; #12 rehab Samarra 3 2 32 55 390 New Mulla 6 3 94 173 3 #4 & #5 prog maint; #6 Generator defect Himrin 2 1 22 21 90 Taji 7 4 62 55 16 #3 Compressor; #4 turbine; #7 Rehab Hindia 4 4 5 5 120 M. Taji 2 1 7 18 16 #2 software. Kufa 4 0 0 0 Daura 4 3 59 30 16 #3 Rehab Total 725 896 Hilla 4 4 67 64 20 #2 synch at 1725; #3 synch at 836; #4 synch at 1340 System Generation 74661 MWh Najaf 3 2 87 129 19 #2 prog maint Syrian Line Generation 1428 MWh Khor 4 3 50 80 Natural Gas #4 Rehab Turkey Line Generation 1944 MWh Shuaiba 2 1 7 20 Natural Gas #2 S/B Total Generation 78033 MWh M. Shuaiba 2 Natural Gas System Peak Load 3442 MW Petro 4 1 10 0 Natural Gas Syria Peak Load 60 MW M. Dibis 4 24 Natural Gas Turkey Peak Load 80 MW Mossil East 5 2 12 0 Gas Oil Fixed Gen Peak Load 77 MW Hmam/Zafranya 7 2 3 Gas Oil Total Peak Load 3582 MW Diesel 22 Gas Oil Baghdad Load 1300 MW Total 1045 1186 Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590).
Edited by Electricity Commission U.S. Advisor Staff.
# Peak Loads
DATE :17/ 1 / 2004
N GOV. Average planned load (MW) Average supplied load (MW) Deviation 1 BAGD 1824 1220 604 2 DOHK 112 79 33 3 NYNW 523 290 233 4 TAME 188 123 65 5 SLAH 243 169 74 6 ANBR 219 137 82 7 DYLA 135 62 73 8 BABL 130 72 58 9 KRBL 99 81 18 10 NAJF 126 94 32 11 WAST 132 71 61 12 KADS 85 47 38 13 MUTH 73 46 27 14 THQR 124 108 16 15 MYSN 75 57 18 16 BASR 310 259 51 5
الرئيسية / الخدمات الأساسية / ESS-7e1e1f3e
الخدمات الأساسية
Power System 17 Jan
- التاريخ
- 17 كانون الثاني 2004
- الفئة
- الخدمات الأساسية
- النص متوفر
- الإنكليزية
- عدد الملفات
- 1
معاينة الجدول
الورقة «A-Steam Power Stations»: 16 صفاً × 13 عموداً
| REPORT DATE - 17 January 2004 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| A - Steam Power Stations | ||||||||||||
| Power Stations | Type | No. of Units | No. of Operating Units | Units Load (MW) | Total Load MW | Target Load | Remarks | |||||
| Fuel | 1 | 2 | 3 | 4 | 5 | 6 | MW | |||||
| Dibis | Natural Gas | 4 | 1 | 8 | 8 | 24 | #1 prog maint; #2 boiler leakeage; #3 prog maint | |||||
| Baiji | Fuel Oil | 6 | 3 | 90 | 95 | 100 | 285 | 500 | #2 prog. maint; #3 synch at 1340; #5 forced outage; #6 prog maint | |||
| Daura | Fuel Oil | 4 | 1 | 75 | 75 | 180 | #4 rotor repair; #(5+6) Rehab | |||||
| South Baghdad | Fuel Oil | 6 | 1 | 20 | 20 | 200 | #1 stopped at 256 boiler leakage; #2 air heater defect; #4 stopped at 1628 boiler leakage; #5 prog maint; #6 stopped at 1115 excit. Fail | |||||
| Mussaibe | Crude and Fuel Oil | 4 | 3 | 210 | 100 | 225 | 535 | 860 | #1 synch at 1613; #3 stopped at 1454 boiler leakage | |||
| Nassirya | Crude | 4 | 3 | 130 | 140 | 150 | 420 | 600 | #4 prog maint. 28 DEC to 28 JAN. | |||
| Najebia | Natural Gas and Crude | 2 | 2 | 30 | 85 | 115 | 160 | #4 one boiler in operation | ||||
| Hartha | Natural Gas and Crude | 4 | 1 | 140 | 140 | 300 | #1 stopped at 1228 air press. Dropped, synch at 1602; #4 prog maint | |||||
| Out of Service for Unscheduled Maintanence | Total: | 1,598 | 2,824 | |||||||||
| Out of Service for Program Maintanence/Rehab | ||||||||||||
| No activity | ||||||||||||
| Not Performing at Peak Performance |
الورقة «B- Gas_C-Power Stations»: 26 صفاً × 13 عموداً
| Report Date- 17 January 2004 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| B- Gas Power Stations | C -Hydro Power Stations | |||||||||||
| Power Stations | No. of Units | No. of Operating Units | Station Load | Target Load | Fuel Use | Remarks | Power Stations | No. of Units | No. of Operating Units | Station Load | Target Load | Discharge m3/Sec |
| Gas Pressure | ||||||||||||
| Baiji | 2 | 1 | 130 | 125 | Gas Oil | #1 synch at 1605; #2 lubricating oil leak from bearing | Musil Dam Main | 4 | 3 | 390 | 600 | |
| Quds | 2 | 2 | 193 | 160 | Gas Oil | 35 trucks | Musil Dam reg | 4 | 3 | 36 | 60 | 450 |
| Mosil | 12 | 7 | 114 | 150 | 25 | #1 rotor defect; #2 servo + ACC; #3 prog maint; #6 diesel; #9 rotor defect | Musil Pumping | 2 | 1 | 110 | 0 | |
| Dibis | 3 | 1 | 25 | 30 | 30 | #4 and #5 rehab | Haditha Dam | 6 | 2 | 130 | 160 | 300 |
| Old Mulla | 12 | 8 | 103 | 128 | 450 | #1 ACC gear; #2 servo; #5 prog maint; #12 rehab | Samarra | 3 | 2 | 32 | 55 | 390 |
| New Mulla | 6 | 3 | 94 | 173 | 3 | #4 & #5 prog maint; #6 Generator defect | Himrin | 2 | 1 | 22 | 21 | 90 |
| Taji | 7 | 4 | 62 | 55 | 16 | #3 Compressor; #4 turbine; #7 Rehab | Hindia | 4 | 4 | 5 | 5 | 120 |
| M. Taji | 2 | 1 | 7 | 18 | 16 | #2 software. | Kufa | 4 | 0 | 0 | 0 | |
| Daura | 4 | 3 | 59 | 30 | 16 | #3 Rehab | Total | 725 | 896 | |||
| Hilla | 4 | 4 | 67 | 64 | 20 | #2 synch at 1725; #3 synch at 836; #4 synch at 1340 | System Generation | 74,661 | MWh | |||
| Najaf | 3 | 2 | 87 | 129 | 19 | #2 prog maint | Syrian Line Generation | 1,428 | MWh | |||
| Khor | 4 | 3 | 50 | 80 | Natural Gas | #4 Rehab | Turkey Line Generation | 1,944 | MWh | |||
| Shuaiba | 2 | 1 | 7 | 20 | Natural Gas | #2 S/B | Total Generation | 78,033 | MWh | |||
| M. Shuaiba | 2 | Natural Gas | System Peak Load | 3,442 | MW | |||||||
| Petro | 4 | 1 | 10 | 0 | Natural Gas | Syria Peak Load | 60 | MW | ||||
| M. Dibis | 4 | 24 | Natural Gas | Turkey Peak Load | 80 | MW | ||||||
| Mossil East | 5 | 2 | 12 | 0 | Gas Oil | Fixed Gen Peak Load | 77 | MW | ||||
| Hmam/Zafranya | 7 | 2 | 3 | Gas Oil | Total Peak Load | 3,582 | MW | |||||
| Diesel | 22 | Gas Oil | Baghdad Load | 1,300 | MW | |||||||
| Total | 1,045 | 1,186 | ||||||||||
| Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590). | ||||||||||||
| Edited by Electricity Commission U.S. Advisor Staff. |
الورقة «Peak Loads»: 21 صفاً × 5 أعمدة
| DATE :17/ 1 / 2004 | ||||
|---|---|---|---|---|
| N | GOV. | Average planned load (MW) | Average supplied load (MW) | Deviation |
| 1 | BAGD | 1,824 | 1,220 | 604 |
| 2 | DOHK | 112 | 79 | 33 |
| 3 | NYNW | 523 | 290 | 233 |
| 4 | TAME | 188 | 123 | 65 |
| 5 | SLAH | 243 | 169 | 74 |
| 6 | ANBR | 219 | 137 | 82 |
| 7 | DYLA | 135 | 62 | 73 |
| 8 | BABL | 130 | 72 | 58 |
| 9 | KRBL | 99 | 81 | 18 |
| 10 | NAJF | 126 | 94 | 32 |
| 11 | WAST | 132 | 71 | 61 |
| 12 | KADS | 85 | 47 | 38 |
| 13 | MUTH | 73 | 46 | 27 |
| 14 | THQR | 124 | 108 | 16 |
| 15 | MYSN | 75 | 57 | 18 |
| 16 | BASR | 310 | 259 | 51 |
| 5 |