معاينة الجدول

الورقة «A-Steam Power Stations»: 16 صفاً × 13 عموداً

Reporting Peak for 16 APRIL 2004 / Report Date - 17 APRIL 2004
A - Steam Power Stations
Power StationsType FuelNo. of UnitsNo. of Operating UnitsUnits Load (MW)Total Load MWTarget Load MWRemarks
123456
DibisNatural Gas438882424#4 prog maint
BaijiFuel Oil639085100275500#1, #3 prog maint; #5 forced outage
DauraFuel Oil40180#3, #4 prog maint; #5, #6 rehab
South BaghdadFuel Oil613030200#1, #2, #3 prog maint; #5 stopped at 930 boiler leakage; #6 stopped at 1221 boiler leakage
MussaibeCrude and Fuel Oil42200225425860#2, #4 prog maint
NassiryaCrude40600#1, #2 prog maint - shutdown til 4/15
NajebiaNatural Gas and Crude224085125160#4 one boiler
HarthaNatural Gas and Crude41180180300#1 prog maint
Out of Service for Unscheduled MaintanenceTotal:1,0592,824
Out of Service for Program Maintanence/Rehab
No activity
Not Performing at Peak Performance
# A-Steam Power Stations Reporting Peak for 16 APRIL 2004 / Report Date - 17 APRIL 2004 A - Steam Power Stations Power Stations Type Fuel No. of Units No. of Operating Units Units Load (MW) Total Load MW Target Load MW Remarks 1 2 3 4 5 6 Dibis Natural Gas 4 3 8 8 8 24 24 #4 prog maint Baiji Fuel Oil 6 3 90 85 100 275 500 #1, #3 prog maint; #5 forced outage Daura Fuel Oil 4 0 180 #3, #4 prog maint; #5, #6 rehab South Baghdad Fuel Oil 6 1 30 30 200 #1, #2, #3 prog maint; #5 stopped at 930 boiler leakage; #6 stopped at 1221 boiler leakage Mussaibe Crude and Fuel Oil 4 2 200 225 425 860 #2, #4 prog maint Nassirya Crude 4 0 600 #1, #2 prog maint - shutdown til 4/15 Najebia Natural Gas and Crude 2 2 40 85 125 160 #4 one boiler Hartha Natural Gas and Crude 4 1 180 180 300 #1 prog maint Out of Service for Unscheduled Maintanence Total: 1059 2824 Out of Service for Program Maintanence/Rehab No activity Not Performing at Peak Performance # B- Gas_C-Power Stations Reporting Peak for 16 APRIL 2004 / Report Date - 17 APRIL 2004 B- Gas Power Stations C -Hydro Power Stations Power Stations No. of Units No. of Operating Units Station Load Target Load Fuel Use Remarks Power Stations No. of Units No. of Operating Units Station Load Target Load Discharge m3/Sec Gas Pressure Baiji 2 1 95 125 Gas Oil #1 filter cleaning; #2 synch at 945 on HFO Musil Dam Main 4 4 600 600 M. Baiji 8 Gas Oil Musil Dam reg 4 4 48 60 600 Quds 2 2 145 160 Gas Oil 33 trucks Musil Pumping 2 1 110 0 Mosil 12 8 122 150 #1, #2, #9 TF; #11 stopped at 0157 vib Haditha Dam 6 4 240 160 500 Dibis 3 2 47 30 #4 rehab Samarra 3 3 54 55 630 Old Mulla 12 6 85 128 #1 acc gear; #6 HET; #7 gen vib; #8 vib; #10 vib; #12 needs rehab Himrin 2 2 36 21 150 New Mulla 6 5 158 173 #6 generator defect (prog maint 5/15 Hindia 4 4 6 5 140 Taji 7 4 57 55 #3 compressor; #6 prog maint; #7 needs rehab Kufa 4 2 1 0 30 M. Taji 2 18 #2 software Total 1095 896 Daura 4 1 25 30 #2 stopped at 2050 high gen temp; #3 needs rehab; #4 prog main System Generation 66635 MWh Hilla 4 4 76 64 Syrian Line Generation 1036 MWh Najaf 3 3 80 129 Turkey Line Generation 1918 MWh Khor 4 1 45 80 Natural Gas #1 stopped at 1938 bleed valve prob; #2 prog maint; #4 prim prot Total Generation 75016 MWh Shuaiba 2 20 Natural Gas #2 prog maint System Peak Load 3471 MW M. Shuaiba 2 Natural Gas #1 stopped at 1248 HET; #2 prog maint Syria Peak Load 47 MW Petro 4 1 10 0 Natural Gas Turkey Peak Load 80 MW M. Dibis 4 3 9 24 Natural Gas Fixed Gen Peak Load 266 MW Mossil East 5 4 22 0 Gas Oil Total Peak Load 3610 MW Hmam/Zafranya 7 1 2 Gas Oil Baghdad Load 1130 MW Diesel 57 Gas Oil Total 1035 1186 Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590). Edited by Electricity Commission U.S. Advisor Staff. # Peak Loads Reporting Peak for 16 APRIL 2004 / Report Date - 17 APRIL 2004 Power transferred from North to Middle 1020 MW. Power transferred from South to Middle - 220 MW. GOVERNORATE Peak Load MW MWH Average Load MW Demand Load MW Baghdad 1130 23036 960 1449 Duhok 80 1894 79 112 Naynawa 295 6336 264 514 Tamim 120 2949 123 190 Salah Aldeen 195 4567 190 252 Anbar 220 4272 178 237 Dyala 95 1753 73 139 Babil 105 2112 88 141 Kirbala 115 2235 93 108 Najaf 125 2227 93 121 Kadsya 75 1809 75 131 Wasit 50 1219 51 89 Muthana 55 1360 57 76 Nasirya 80 2347 98 124 Misan 50 1462 61 80 Basra 290 6593 275 282