DAILY POWER SYSTEM HIGHLIGHTS FOR MAY 10, 2004 The CPA Electricity Advisor issues this report to note significant events or conditions of interest in the power sector. The basic daily data on the power system is available on the CPA web site. HIGHLIGHTS: Generation: Peak Power 3789Mw, 80,030Mw hours, 7-day Avg. 3719Mw Generators Returned to Service: (3) 118 Mw Dibis 1, SP 8 Mw Baiji 4, SP 85 Mw South Baghdad 6 25 Mw Generators Unscheduled Out of Service (17) 588 Mw PLANT Type SP, CP, RP, HP Fault Mw Dibis 2 SP Drum Level low 8 Najebia 5 SP Thrust bearing problem 80 Mussaibe 4 SP Oil Leak 230 South Baghdad 5 SP Air Heater 30 Baiji Mobile, 4 CP Fuel Filters 25 Doura 1,2 CP No gas pressure 40 Khor Zubayr 4 CP Oil Leak 40 Mosil 1 CP Rotor Defect 15 Mosil 2 CP Reverse Power 15 Mosil 9 CP Reverse Power 15 Old Mulla 7 CP High exhaust temp 15 Taji 1,2 CP No gas pressure 30 Taji 5 CP High Exhaust Temp 15 M. Taji 1 CP Planned Outage 15 M. Taji 2 CP Software 15 RED – Denotes out of service since last report Generators Scheduled Out of Service (28) 1256 Mw PLANT Type SP/NG Prog. Maintenance(M) / Rehab (R) Maint. Org. Date out-of -service Est. In-service Date Mw Baiji 1 SP M Bechtel 21 Mar 04 21 May 100 Dibis 3 SP M ME 26 Apr 04 TBD 8 Dibis 4 SP M ME 15 Mar 04 TBD 8 Doura 4 CP M ME 14 Apr 04 31 May 20 Doura 3 CP R ME 1 Mar 03 TBD 20 Doura 3 SP M ME 18 Mar 04 18 May 65 Doura 4 SP M ME 2 Feb 04 TBD 65 Doura 5 SP R Bechtel Jul 03 20 Jun 100 Doura 6 SP R Bechtel Jul 03 20 Jul 100 Dibis 4 CP R GRD/RIE Sep 03 12 May 30 Hartha 1 SP M ME 22 Mar 04 23 May 100 Khor Zubayr 2 CP R GRD/RIE 15 Mar 04 3 Jul 50 Mosil 7 CP M ME 24 Apr 04 18 May 15 Mosil 8 CP R GRD/RIE 6 Feb 04 4 Jun 15 Mussaibe 2 SP M (Additional work) ME 28 Feb 04 20 May 200 Nassirya 1 SP M ME 30 Mar 04 21 May 130 New Mulla 6 CP R GRD/RIE 28 Mar 04 15 May 30 Old Mulla 1 CP M ME 17 Apr 04 15 May 15 Old Mulla 2 CP M ME 17 Apr 04 15 May 15 Old Mulla 8 CP M ME 17 Apr 04 12 May 15 Old Mulla 12 CP R GRD/RIE 1 Oct 03 15 May 15 South Baghdad 1 SP M (Awaiting parts) ME 12 Feb 04 21 May 30 South Baghdad 2 SP M (Awaiting Parts) ME 12 Feb 04 20 May 30 South Baghdad 3 SP R ME 18 Mar 04 6 Jun 20 Taji 3 CP R GRD/RIE 6 Feb 04 23 Jul 15 Taji 4 CP M GRD/RIE 21 Apr 04 15 JUL 15 Taji 7 CP R GRD/RIE 1 Oct 03 15 JUL 15 Taji 6 CP M ME 2 Apr 04 26 May 15 New In-service date LEGEND OF ELECTRICAL SYSTEM POWER SOURCE SP: STEAM POWER – These plants use either fuel oil or crude in burners CP: COMBUSTION POWER RP: RECIPROCATING POWER HP: HYDRO POWER Transmission: LINE Kv Fault Maint. Org. Date out-of -service Est. In-service Date Comments Nassiriya-Khor Zubayr 400 Sabotage Bechtel 26 May 159 towers complete/216req’d Haditha-Baghd West 400 Sabotage GRD/RIE Complete 246 towers complete/246 req’d Hartha-Qut Wasit 400 Sabotage GRD/RIE Complete 23 Apr Operational Baiji - Baghd West #1 400 Sabotage GRD/RIE Complete Operational Baghd E.-Baghd S. #2 400 New Line GRD/RIE Complete 81 towers complete/81req’d Haditha – Qaim 400 Sabotage GRD-RIE 28 Feb 05 Start date 21 May 04 Baiji – Haditha 400 Sabotage Bechtel TBD No contract awarded Diyala Connection 400 New Line ME 15 Jun Foundations under construction Dibis/Erbil-Qara Qosh 132 New Line GRD/RIE 22 May Construction ongoing Dibis to Old Kirkuk 132 Reconductor GRD-RIE 31 Jul Bids for work under evaluation Mosul – Mosul East 132 Sabotage ME TBD Shuwaiba-Toba-Hamar 132 Sabotage ME Complete 44 towers complete/44 req’d Samediya – New Baghdad 132 Reconductor GRD-RIE 5 Jul Assessment underway Jazair to Yarmook 132 Reconductor GRD-RIE 5 Jul Assessment underway Baghd West – Jamia 132 Sabotage ME TBD Old Amarah-Burzulgan 132 Looting GRD-RIE 25 Jun Assessment underway Temim- Tuz 132 Sabotage ME TBD Nejibiya – Hartha 132 Sabotage ME TBD Lines Returned to service: Distribution: No report today Power transferred from North to Middle 850 MW. Power transferred from South to Middle 185 MW. GOVERNORATE Peak Load MW MWH Average Load MW Demand Load MW Baghdad 1300 27360 1140 1563 Duhok 83 1921 80 111 Naynawa 270 6440 268 284 Tamim 118 2985 124 177 Salah Aldeen 185 4371 182 237 Anbar 185 4098 171 233 Dyala 75 1610 67 131 Babil 75 1956 82 134 Kirbala 70 1563 65 113 Najaf 90 2034 85 135 Kadsya 50 1261 53 94 Wasit 70 1750 73 123 Muthana 45 1120 47 81 Nasirya 127 2846 119 140 Misan 60 1402 58 86 Basra 300 6755 281 348 Data compiled and reported by: LTC Tharnell M. Thomas CENTCOM LNO CPA Ministry of Electricity thomast2orha.centcom.mil Page PAGE 1 of NUMPAGES 3