# A-Steam Power Stations
Reporting Peak for 10 MARCH 2004 / Report Date - 11 MARCH 2004 A - Steam Power Stations Power Stations Type Fuel No. of Units No. of Operating Units Units Load (MW) Total Load MW Target Load MW Remarks 1 2 3 4 5 6 Dibis Natural Gas 4 1 8 8 24 #3 prog maint; #4 6.35 vacuum Baiji Fuel Oil 6 3 85 85 90 260 500 #2 & #3 prog maint; #5 forced outage Daura Fuel Oil 4 1 70 70 180 #4 prog maint; #5 & #6 rehab South Baghdad Fuel Oil 6 2 30 30 60 200 #1 & #2 prog maint; #3 gen diff; #4 19-24 synch; #5 stopped at 2300 boiler leakage Mussaibe Crude and Fuel Oil 4 2 205 215 420 860 #2 prog maint; #4 prog maint Nassirya Crude 4 2 130 130 260 600 #2 prog maint; #3 02.55 vacuum Najebia Natural Gas and Crude 2 2 80 80 160 160 #4 valve leak Hartha Natural Gas and Crude 4 1 95 95 300 #4 boiler leak Out of Service for Unscheduled Maintanence Total: 1333 2824 Out of Service for Program Maintanence/Rehab No activity Not Performing at Peak Performance
# B- Gas_C-Power Stations
Reporting Peak for 10 MARCH 2004 / Report Date - 11 MARCH 2004 B- Gas Power Stations C -Hydro Power Stations Power Stations No. of Units No. of Operating Units Station Load Target Load Fuel Use Remarks Power Stations No. of Units No. of Operating Units Station Load Target Load Discharge m3/Sec Gas Pressure Baiji 2 1 100 125 Gas Oil #1 gas oil; #2 lub oil system Musil Dam Main 4 4 610 600 Quds 2 2 200 160 Gas Oil 21 trucks Musil Dam reg 4 3 24 60 1000 Mosil 12 9 135 150 32 #1 & #9 rotor defect; #11 H.P. Musil Pumping 2 2 110 0 Dibis 3 2 60 30 30 #4 rehab Haditha Dam 6 3 195 160 600 Old Mulla 12 8 120 128 570 #1 acc gear; #2 servo; #5 & #6 synch; #12 needs rehab Samarra 3 3 67 55 670 New Mulla 6 4 135 173 310 #2 prog maint; #6 generator defect Himrin 2 2 50 21 250 Taji 7 55 #3 compressor; #4 stopped at 600 control card N.G. press low; #7 needs rehab Hindia 4 4 6 5 M. Taji 2 18 #2 software Kufa 4 3 2 0 Daura 4 30 #2 prog maint; #3 needs rehab NG press low Total 1064 896 Hilla 4 3 44 64 25 #2 synch at 1640; #3 turbine blades, prog maint System Generation 78527 MWh Najaf 3 3 100 129 21 #2 vib Syrian Line Generation 1357 MWh Khor 4 3 90 80 Natural Gas #4 gen prot #2 Turkey Line Generation 1582 MWh Shuaiba 2 1 5 20 Natural Gas #1 prog maint Total Generation 86893 MWh M. Shuaiba 2 Natural Gas System Peak Load 3655 MW Petro 4 1 10 0 Natural Gas #2 vib Syria Peak Load 60 MW M. Dibis 4 3 9 24 Natural Gas Turkey Peak Load 85 MW Mossil East 5 2 10 0 Gas Oil Fixed Gen Peak Load 266 MW Hmam/Zafranya 7 1 2 Gas Oil Total Peak Load 4066 MW Diesel 54 Gas Oil Baghdad Load 1380 MW Total 1074 1186 Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590).
Edited by Electricity Commission U.S. Advisor Staff.
# Peak Loads
Reporting Peak for 10 MARCH 2004 / Report Date - 11 MARCH 2004 Power transferred from North to Middle 835 MW.
Power transferred from South to Middle 185 MW.
GOVERNORATE Peak Load MW MWH Average Load MW Baghdad 1380 29250 1219 Duhok 85 1948 81 Naynawa 319 9501 396 Tamim 255 5177 216 Salah Aldeen 201 5110 213 Anbar 210 4405 184 Dyala 90 2411 100 Babil 95 2394 100 Kirbala 80 1991 83 Najaf 97 2469 103 Kadsya 60 1447 60 Wasit 95 2176 91 Muthana 60 1370 57 Nasirya 125 2683 112 Misan 60 1430 60 Basra 300 6190 258
الرئيسية / الخدمات الأساسية / ESS-63721b6d
الخدمات الأساسية
System Status Mar 11
- التاريخ
- 11 آذار 2004
- الفئة
- الخدمات الأساسية
- النص متوفر
- الإنكليزية
- عدد الملفات
- 1
معاينة الجدول
الورقة «A-Steam Power Stations»: 16 صفاً × 13 عموداً
| Reporting Peak for 10 MARCH 2004 / Report Date - 11 MARCH 2004 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| A - Steam Power Stations | ||||||||||||
| Power Stations | Type Fuel | No. of Units | No. of Operating Units | Units Load (MW) | Total Load MW | Target Load MW | Remarks | |||||
| 1 | 2 | 3 | 4 | 5 | 6 | |||||||
| Dibis | Natural Gas | 4 | 1 | 8 | 8 | 24 | #3 prog maint; #4 6.35 vacuum | |||||
| Baiji | Fuel Oil | 6 | 3 | 85 | 85 | 90 | 260 | 500 | #2 & #3 prog maint; #5 forced outage | |||
| Daura | Fuel Oil | 4 | 1 | 70 | 70 | 180 | #4 prog maint; #5 & #6 rehab | |||||
| South Baghdad | Fuel Oil | 6 | 2 | 30 | 30 | 60 | 200 | #1 & #2 prog maint; #3 gen diff; #4 19-24 synch; #5 stopped at 2300 boiler leakage | ||||
| Mussaibe | Crude and Fuel Oil | 4 | 2 | 205 | 215 | 420 | 860 | #2 prog maint; #4 prog maint | ||||
| Nassirya | Crude | 4 | 2 | 130 | 130 | 260 | 600 | #2 prog maint; #3 02.55 vacuum | ||||
| Najebia | Natural Gas and Crude | 2 | 2 | 80 | 80 | 160 | 160 | #4 valve leak | ||||
| Hartha | Natural Gas and Crude | 4 | 1 | 95 | 95 | 300 | #4 boiler leak | |||||
| Out of Service for Unscheduled Maintanence | Total: | 1,333 | 2,824 | |||||||||
| Out of Service for Program Maintanence/Rehab | ||||||||||||
| No activity | ||||||||||||
| Not Performing at Peak Performance |
الورقة «B- Gas_C-Power Stations»: 26 صفاً × 13 عموداً
| Reporting Peak for 10 MARCH 2004 / Report Date - 11 MARCH 2004 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| B- Gas Power Stations | C -Hydro Power Stations | |||||||||||
| Power Stations | No. of Units | No. of Operating Units | Station Load | Target Load | Fuel Use | Remarks | Power Stations | No. of Units | No. of Operating Units | Station Load | Target Load | Discharge m3/Sec |
| Gas Pressure | ||||||||||||
| Baiji | 2 | 1 | 100 | 125 | Gas Oil | #1 gas oil; #2 lub oil system | Musil Dam Main | 4 | 4 | 610 | 600 | |
| Quds | 2 | 2 | 200 | 160 | Gas Oil | 21 trucks | Musil Dam reg | 4 | 3 | 24 | 60 | 1,000 |
| Mosil | 12 | 9 | 135 | 150 | 32 | #1 & #9 rotor defect; #11 H.P. | Musil Pumping | 2 | 2 | 110 | 0 | |
| Dibis | 3 | 2 | 60 | 30 | 30 | #4 rehab | Haditha Dam | 6 | 3 | 195 | 160 | 600 |
| Old Mulla | 12 | 8 | 120 | 128 | 570 | #1 acc gear; #2 servo; #5 & #6 synch; #12 needs rehab | Samarra | 3 | 3 | 67 | 55 | 670 |
| New Mulla | 6 | 4 | 135 | 173 | 310 | #2 prog maint; #6 generator defect | Himrin | 2 | 2 | 50 | 21 | 250 |
| Taji | 7 | 55 | #3 compressor; #4 stopped at 600 control card N.G. press low; #7 needs rehab | Hindia | 4 | 4 | 6 | 5 | ||||
| M. Taji | 2 | 18 | #2 software | Kufa | 4 | 3 | 2 | 0 | ||||
| Daura | 4 | 30 | #2 prog maint; #3 needs rehab NG press low | Total | 1,064 | 896 | ||||||
| Hilla | 4 | 3 | 44 | 64 | 25 | #2 synch at 1640; #3 turbine blades, prog maint | System Generation | 78,527 | MWh | |||
| Najaf | 3 | 3 | 100 | 129 | 21 | #2 vib | Syrian Line Generation | 1,357 | MWh | |||
| Khor | 4 | 3 | 90 | 80 | Natural Gas | #4 gen prot #2 | Turkey Line Generation | 1,582 | MWh | |||
| Shuaiba | 2 | 1 | 5 | 20 | Natural Gas | #1 prog maint | Total Generation | 86,893 | MWh | |||
| M. Shuaiba | 2 | Natural Gas | System Peak Load | 3,655 | MW | |||||||
| Petro | 4 | 1 | 10 | 0 | Natural Gas | #2 vib | Syria Peak Load | 60 | MW | |||
| M. Dibis | 4 | 3 | 9 | 24 | Natural Gas | Turkey Peak Load | 85 | MW | ||||
| Mossil East | 5 | 2 | 10 | 0 | Gas Oil | Fixed Gen Peak Load | 266 | MW | ||||
| Hmam/Zafranya | 7 | 1 | 2 | Gas Oil | Total Peak Load | 4,066 | MW | |||||
| Diesel | 54 | Gas Oil | Baghdad Load | 1,380 | MW | |||||||
| Total | 1,074 | 1,186 | ||||||||||
| Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590). | ||||||||||||
| Edited by Electricity Commission U.S. Advisor Staff. |
الورقة «Peak Loads»: 24 صفاً × 4 أعمدة · المعاينة لأول 21 صفاً؛ الملف الكامل من زر الأصل
| Reporting Peak for 10 MARCH 2004 / Report Date - 11 MARCH 2004 | |||
|---|---|---|---|
| Power transferred from North to Middle 835 MW. | |||
| Power transferred from South to Middle 185 MW. | |||
| GOVERNORATE | Peak Load MW | MWH | Average Load MW |
| Baghdad | 1,380 | 29,250 | 1,219 |
| Duhok | 85 | 1,948 | 81 |
| Naynawa | 319 | 9,501 | 396 |
| Tamim | 255 | 5,177 | 216 |
| Salah Aldeen | 201 | 5,110 | 213 |
| Anbar | 210 | 4,405 | 184 |
| Dyala | 90 | 2,411 | 100 |
| Babil | 95 | 2,394 | 100 |
| Kirbala | 80 | 1,991 | 83 |
| Najaf | 97 | 2,469 | 103 |
| Kadsya | 60 | 1,447 | 60 |
| Wasit | 95 | 2,176 | 91 |
| Muthana | 60 | 1,370 | 57 |
| Nasirya | 125 | 2,683 | 112 |
| Misan | 60 | 1,430 | 60 |
| Basra | 300 | 6,190 | 258 |