# A-Steam Power Stations
Report Date - 19 FEBRUARY 2004 A - Steam Power Stations Power Stations Type Fuel No. of Units No. of Operating Units Units Load (MW) Total Load MW Target Load MW Remarks 1 2 3 4 5 6 Dibis Natural Gas 4 1 8 8 24 #2 boiler leakage; #3 prog maint; #4 boiler leakage Baiji Fuel Oil 6 4 95 85 75 85 340 500 #2 prog maint; #3 synch at 2144; #5 forced outage; #6 synch at 521 Daura Fuel Oil 4 1 75 75 180 #4 prog maint; #5 & #6 rehab South Baghdad Fuel Oil 6 2 20 30 50 200 #1 & #2 prog maint; #5 stopped at 411 a/h; #6 thrust bearing test Mussaibe Crude and Fuel Oil 4 2 200 200 400 860 #1 synch at 1030, stopped at 2117 e.h.g.; #4 prog maint.
Nassirya Crude 4 3 155 170 150 475 600 #1 cond cleaning Najebia Natural Gas and Crude 2 2 90 90 180 160 Hartha Natural Gas and Crude 4 1 130 130 300 #4 prog maint Out of Service for Unscheduled Maintanence Total: 1658 2824 Out of Service for Program Maintanence/Rehab No activity Not Performing at Peak Performance
# B- Gas_C-Power Stations
Report Date - 19 FEBRUARY 2004 B- Gas Power Stations C -Hydro Power Stations Power Stations No. of Units No. of Operating Units Station Load Target Load Fuel Use Remarks Power Stations No. of Units No. of Operating Units Station Load Target Load Discharge m3/Sec Gas Pressure Baiji 2 1 120 125 Gas Oil #2 lub oil leak from bearing Musil Dam Main 4 4 560 600 Quds 2 2 85 160 Gas Oil 31 trucks Musil Dam reg 4 3 28 60 1000 Mosil 12 9 129 150 18 #1 rotor defect; #3 synch at 710; #4 synch at 1425; #6 synch at 1450; #11 synch at 710 Musil Pumping 2 1 110 0 Dibis 3 2 53 30 27 #4 rehab Haditha Dam 6 2 125 160 350 Old Mulla 12 7 95 128 410 #1 acc. Gear; #2 servo; #5 prog maint; #10 prog maint; #12 needs rehab Samarra 3 2 40 55 440 New Mulla 6 3 105 173 2.7 #1 & #2 prog maint; #6 generator defect Himrin 2 2 42 21 160 Taji 7 4 60 55 19 #3 compressor; #7 needs rehab Hindia 4 4 5 5 100 M. Taji 2 1 8 18 19 #2 software Kufa 4 0 Daura 4 1 20 30 18 #3 needs rehab; #4 g.p.l. Total 910 896 Hilla 4 2 33 64 34 #1 cooling sys prob; #2 servo System Generation 82746 MWh Najaf 3 2 95 129 32 #2 test Syrian Line Generation 1265 MWh Khor 4 2 90 80 Natural Gas #2 oil leak; #4 stopped at 1720 test Turkey Line Generation 2036 MWh Shuaiba 2 1 5 20 Natural Gas #1 prog maint Total Generation 91474 MWh M. Shuaiba 2 Natural Gas split with the refinery System Peak Load 3866 MW Petro 4 1 10 0 Natural Gas Syria Peak Load 60 MW M. Dibis 4 3 9 24 Natural Gas Turkey Peak Load 80 MW Mossil East 5 3 17 0 Gas Oil Fixed Gen Peak Load 266 MW Hmam/Zafranya 7 2 3 Gas Oil Total Peak Load 4272 MW Diesel 51 Gas Oil Baghdad Load 1535 MW Total 988 1186 Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590).
Edited by Electricity Commission U.S. Advisor Staff.
# Peak Loads
Report Date - 19 FEBRUARY 2004 GOVERNORATE Peak Load MW MWH Average Load MW Power transferred from North to Middle 820 MW.
Power transferred from South to Middle 250 MW.
Baghdad 1535 31968 1332
Duhok 80 1954 81
Naynawa 350 7898 329
Tamim 165 3447 144
Salah Aldeen 200 4754 198
Anbar 195 4344 181
Dyala 95 2259 94
Babil 97 2459 102
Kirbala 110 2120 88
Najaf 120 2505 104
Kadsya 78 1428 60
Wasit 107 2011 84
Muthana 65 1293 54
Nasirya 127 2732 114
Misan 77 1426 59
Basra 335 7390 308
الرئيسية / الخدمات الأساسية / ESS-59681130
الخدمات الأساسية
System Status Feb 19
- التاريخ
- 19 شباط 2004
- الفئة
- الخدمات الأساسية
- النص متوفر
- الإنكليزية
- عدد الملفات
- 1
معاينة الجدول
الورقة «A-Steam Power Stations»: 16 صفاً × 13 عموداً
| Report Date - 19 FEBRUARY 2004 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| A - Steam Power Stations | ||||||||||||
| Power Stations | Type Fuel | No. of Units | No. of Operating Units | Units Load (MW) | Total Load MW | Target Load MW | Remarks | |||||
| 1 | 2 | 3 | 4 | 5 | 6 | |||||||
| Dibis | Natural Gas | 4 | 1 | 8 | 8 | 24 | #2 boiler leakage; #3 prog maint; #4 boiler leakage | |||||
| Baiji | Fuel Oil | 6 | 4 | 95 | 85 | 75 | 85 | 340 | 500 | #2 prog maint; #3 synch at 2144; #5 forced outage; #6 synch at 521 | ||
| Daura | Fuel Oil | 4 | 1 | 75 | 75 | 180 | #4 prog maint; #5 & #6 rehab | |||||
| South Baghdad | Fuel Oil | 6 | 2 | 20 | 30 | 50 | 200 | #1 & #2 prog maint; #5 stopped at 411 a/h; #6 thrust bearing test | ||||
| Mussaibe | Crude and Fuel Oil | 4 | 2 | 200 | 200 | 400 | 860 | #1 synch at 1030, stopped at 2117 e.h.g.; #4 prog maint. | ||||
| Nassirya | Crude | 4 | 3 | 155 | 170 | 150 | 475 | 600 | #1 cond cleaning | |||
| Najebia | Natural Gas and Crude | 2 | 2 | 90 | 90 | 180 | 160 | |||||
| Hartha | Natural Gas and Crude | 4 | 1 | 130 | 130 | 300 | #4 prog maint | |||||
| Out of Service for Unscheduled Maintanence | Total: | 1,658 | 2,824 | |||||||||
| Out of Service for Program Maintanence/Rehab | ||||||||||||
| No activity | ||||||||||||
| Not Performing at Peak Performance |
الورقة «B- Gas_C-Power Stations»: 26 صفاً × 13 عموداً
| Report Date - 19 FEBRUARY 2004 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| B- Gas Power Stations | C -Hydro Power Stations | |||||||||||
| Power Stations | No. of Units | No. of Operating Units | Station Load | Target Load | Fuel Use | Remarks | Power Stations | No. of Units | No. of Operating Units | Station Load | Target Load | Discharge m3/Sec |
| Gas Pressure | ||||||||||||
| Baiji | 2 | 1 | 120 | 125 | Gas Oil | #2 lub oil leak from bearing | Musil Dam Main | 4 | 4 | 560 | 600 | |
| Quds | 2 | 2 | 85 | 160 | Gas Oil | 31 trucks | Musil Dam reg | 4 | 3 | 28 | 60 | 1,000 |
| Mosil | 12 | 9 | 129 | 150 | 18 | #1 rotor defect; #3 synch at 710; #4 synch at 1425; #6 synch at 1450; #11 synch at 710 | Musil Pumping | 2 | 1 | 110 | 0 | |
| Dibis | 3 | 2 | 53 | 30 | 27 | #4 rehab | Haditha Dam | 6 | 2 | 125 | 160 | 350 |
| Old Mulla | 12 | 7 | 95 | 128 | 410 | #1 acc. Gear; #2 servo; #5 prog maint; #10 prog maint; #12 needs rehab | Samarra | 3 | 2 | 40 | 55 | 440 |
| New Mulla | 6 | 3 | 105 | 173 | 2.70 | #1 & #2 prog maint; #6 generator defect | Himrin | 2 | 2 | 42 | 21 | 160 |
| Taji | 7 | 4 | 60 | 55 | 19 | #3 compressor; #7 needs rehab | Hindia | 4 | 4 | 5 | 5 | 100 |
| M. Taji | 2 | 1 | 8 | 18 | 19 | #2 software | Kufa | 4 | 0 | |||
| Daura | 4 | 1 | 20 | 30 | 18 | #3 needs rehab; #4 g.p.l. | Total | 910 | 896 | |||
| Hilla | 4 | 2 | 33 | 64 | 34 | #1 cooling sys prob; #2 servo | System Generation | 82,746 | MWh | |||
| Najaf | 3 | 2 | 95 | 129 | 32 | #2 test | Syrian Line Generation | 1,265 | MWh | |||
| Khor | 4 | 2 | 90 | 80 | Natural Gas | #2 oil leak; #4 stopped at 1720 test | Turkey Line Generation | 2,036 | MWh | |||
| Shuaiba | 2 | 1 | 5 | 20 | Natural Gas | #1 prog maint | Total Generation | 91,474 | MWh | |||
| M. Shuaiba | 2 | Natural Gas | split with the refinery | System Peak Load | 3,866 | MW | ||||||
| Petro | 4 | 1 | 10 | 0 | Natural Gas | Syria Peak Load | 60 | MW | ||||
| M. Dibis | 4 | 3 | 9 | 24 | Natural Gas | Turkey Peak Load | 80 | MW | ||||
| Mossil East | 5 | 3 | 17 | 0 | Gas Oil | Fixed Gen Peak Load | 266 | MW | ||||
| Hmam/Zafranya | 7 | 2 | 3 | Gas Oil | Total Peak Load | 4,272 | MW | |||||
| Diesel | 51 | Gas Oil | Baghdad Load | 1,535 | MW | |||||||
| Total | 988 | 1,186 | ||||||||||
| Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590). | ||||||||||||
| Edited by Electricity Commission U.S. Advisor Staff. |
الورقة «Peak Loads»: 24 صفاً × 4 أعمدة · المعاينة لأول 21 صفاً؛ الملف الكامل من زر الأصل
| Report Date - 19 FEBRUARY 2004 | |||
|---|---|---|---|
| GOVERNORATE | Peak Load MW | MWH | Average Load MW |
| Power transferred from North to Middle 820 MW. | |||
| Power transferred from South to Middle 250 MW. | |||
| Baghdad | 1,535 | 31,968 | 1,332 |
| Duhok | 80 | 1,954 | 81 |
| Naynawa | 350 | 7,898 | 329 |
| Tamim | 165 | 3,447 | 144 |
| Salah Aldeen | 200 | 4,754 | 198 |
| Anbar | 195 | 4,344 | 181 |
| Dyala | 95 | 2,259 | 94 |
| Babil | 97 | 2,459 | 102 |
| Kirbala | 110 | 2,120 | 88 |
| Najaf | 120 | 2,505 | 104 |
| Kadsya | 78 | 1,428 | 60 |
| Wasit | 107 | 2,011 | 84 |
| Muthana | 65 | 1,293 | 54 |
| Nasirya | 127 | 2,732 | 114 |
| Misan | 77 | 1,426 | 59 |
| Basra | 335 | 7,390 | 308 |