معاينة الجدول

الورقة «A-Steam Power Stations»: 16 صفاً × 13 عموداً

Report Date - 20 FEBRUARY 2004
A - Steam Power Stations
Power StationsType FuelNo. of UnitsNo. of Operating UnitsUnits Load (MW)Total Load MWTarget Load MWRemarks
123456
DibisNatural Gas42881624
BaijiFuel Oil63909090270500
DauraFuel Oil41252550180
South BaghdadFuel Oil627070200
MussaibeCrude and Fuel Oil42195195390860
NassiryaCrude43160160165485600
NajebiaNatural Gas and Crude22130130160
HarthaNatural Gas and Crude419090180300
Out of Service for Unscheduled MaintanenceTotal:1,5912,824
Out of Service for Program Maintanence/Rehab
No activity
Not Performing at Peak Performance
# A-Steam Power Stations Report Date - 20 FEBRUARY 2004 A - Steam Power Stations Power Stations Type Fuel No. of Units No. of Operating Units Units Load (MW) Total Load MW Target Load MW Remarks 1 2 3 4 5 6 Dibis Natural Gas 4 2 8 8 16 24 Baiji Fuel Oil 6 3 90 90 90 270 500 Daura Fuel Oil 4 1 25 25 50 180 South Baghdad Fuel Oil 6 2 70 70 200 Mussaibe Crude and Fuel Oil 4 2 195 195 390 860 Nassirya Crude 4 3 160 160 165 485 600 Najebia Natural Gas and Crude 2 2 130 130 160 Hartha Natural Gas and Crude 4 1 90 90 180 300 Out of Service for Unscheduled Maintanence Total: 1591 2824 Out of Service for Program Maintanence/Rehab No activity Not Performing at Peak Performance # B- Gas_C-Power Stations Report Date - 20 FEBRUARY 2004 B- Gas Power Stations C -Hydro Power Stations Power Stations No. of Units No. of Operating Units Station Load Target Load Fuel Use Remarks Power Stations No. of Units No. of Operating Units Station Load Target Load Discharge m3/Sec Gas Pressure Baiji 2 1 125 Gas Oil Musil Dam Main 4 4 555 600 Quds 2 2 220 160 Gas Oil Musil Dam reg 4 3 26 60 Mosil 12 9 137 150 Musil Pumping 2 0 Dibis 3 2 55 60 Haditha Dam 6 160 Old Mulla 12 7 100 128 Samarra 3 3 42 55 New Mulla 6 3 103 173 Himrin 2 2 42 21 Taji 7 4 66 55 Hindia 4 4 5 5 M. Taji 2 1 7 20 Kufa 4 0 Daura 4 2 40 30 Total 670 896 Hilla 4 2 35 64 System Generation MWh Najaf 3 2 95 129 Syrian Line Generation MWh Khor 4 3 120 80 Natural Gas Turkey Line Generation MWh Shuaiba 2 1 5 20 Natural Gas Total Generation 89959 MWh M. Shuaiba 2 Natural Gas System Peak Load 3871 MW Petro 4 1 10 0 Natural Gas Syria Peak Load 60 MW M. Dibis 4 2 6 24 Natural Gas Turkey Peak Load 85 MW Mossil East 5 4 16 15 Gas Oil Fixed Gen Peak Load 266 MW Hmam/Zafranya 7 3 46 Gas Oil Total Peak Load 4282 MW Diesel Gas Oil Baghdad Load 1555 MW Total 1061 1233 Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590). Edited by Electricity Commission U.S. Advisor Staff. # Peak Loads Report Date - 20 FEBRUARY 2004 GOVERNORATE Peak Load MW MWH Average Load MW Baghdad 1400 Duhok 84 Naynawa 310 Tamim 140 Salah Aldeen 190 Anbar 180 Dyala 100 Babil 100 Kirbala 140 Najaf 125 Kadsya 50 Wasit 70 Muthana 65 Nasirya 135 Misan 60 Basra 320