# A-Steam Power Stations
Report Date - 16 FEBRUARY 2004 A - Steam Power Stations Power Stations Type Fuel No. of Units No. of Operating Units Units Load (MW) Total Load MW Target Load MW Remarks 1 2 3 4 5 6 Dibis Natural Gas 4 1 8 8 24 #2 boiler leakage; #3 prog maint; #4 boiler leakage Baiji Fuel Oil 6 3 90 75 95 260 500 #2 prog maint; #4 boiler leakage; #5 forced outage Daura Fuel Oil 4 1 70 70 180 #4 prog maint; #5 & #6 rehab South Baghdad Fuel Oil 6 3 20 30 30 80 200 #1 & #2 prog maint; #3 synch at 1880; #5 a/h Mussaibe Crude and Fuel Oil 4 2 195 195 390 860 #2 stopped at 523 ehg; #4 prog maint Nassirya Crude 4 3 165 165 145 475 600 #1 cond cleaning Najebia Natural Gas and Crude 2 2 35 85 120 160 #4 one boiler in operation Hartha Natural Gas and Crude 4 1 134 134 300 #3 prog maint Out of Service for Unscheduled Maintanence Total: 1537 2824 Out of Service for Program Maintanence/Rehab No activity Not Performing at Peak Performance
# B- Gas_C-Power Stations
Report Date - 16 FEBRUARY 2004 B- Gas Power Stations C -Hydro Power Stations Power Stations No. of Units No. of Operating Units Station Load Target Load Fuel Use Remarks Power Stations No. of Units No. of Operating Units Station Load Target Load Discharge m3/Sec Gas Pressure Baiji 2 125 Gas Oil #1 synch at 1802 - stopped at 705 tran line trip; #2 lub oil leak from bearing Musil Dam Main 4 4 555 600 Quds 2 2 150 160 Gas Oil 30 trucks Musil Dam reg 4 4 39 60 800 Mosil 12 7 55 150 14 #1 rotor defec; #3 & #4 stopped at 515 g.p.l.; #8 stopped at 935 g.p.l.; #9 rotor defect Musil Pumping 2 1 100 0 Dibis 3 2 35 30 19 #4 rehab Haditha Dam 6 2 125 160 350 Old Mulla 12 7 97 128 350 #1 acc gear; #2 servo; #3 synch at 1030; #5 prog maint; #10 prog maint; #12 needs rehab Samarra 3 2 40 55 440 New Mulla 6 4 145 173 3.2 #1 prog maint; #6 generator defect Himrin 2 2 42 21 160 Taji 7 5 70 55 13 #3 compressor; #7 needs rehab Hindia 4 4 5 5 180 M. Taji 2 18 #2 software Kufa 4 0 Daura 4 1 10 30 13 #3 needs rehab; #4 stopped at 703 g.p.l. Total 906 896 Hilla 4 2 35 64 35 #1 cooling sys prob; #2 servo System Generation 78781 MWh Najaf 3 2 90 129 32 #2 prog maint Syrian Line Generation 1398 MWh Khor 4 3 120 80 Natural Gas #4 rehab Turkey Line Generation 1963 MWh Shuaiba 2 1 6 20 Natural Gas #1 prog maint Total Generation 87570 MWh M. Shuaiba 2 Natural Gas split with the refinery System Peak Load 3913 MW Petro 4 1 10 0 Natural Gas Syria Peak Load 60 MW M. Dibis 4 3 9 24 Natural Gas Turkey Peak Load 85 MW Mossil East 5 3 17 0 Gas Oil Fixed Gen Peak Load 266 MW Hmam/Zafranya 7 2 8 Gas Oil Total Peak Load 4324 MW Diesel 46 Gas Oil Baghdad Load 1620 MW Total 903 1186 Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590).
Edited by Electricity Commission U.S. Advisor Staff.
# Peak Loads
Report Date - 16 FEBRUARY 2004 GOVERNORATE Peak Load MW MWH Average Load MW Power transferred from North to Middle 815 MW.
Power transferred from South to Middle 225 MW.
Baghdad 1620 28870 1203
Duhok 85 1920 80
Naynawa 365 11304 471
Tamim 135 4103 171
Salah Aldeen 215 5442 227
Anbar 195 4402 183
Dyala 104 2062 86
Babil 105 2203 92
Kirbala 85 1791 75
Najaf 105 2178 91
Kadsya 70 1472 61
Wasit 95 2058 86
Muthana 60 1374 57
Nasirya 125 2713 113
Misan 67 1474 61
Basra 320 6934 289
الرئيسية / الخدمات الأساسية / ESS-5002c25b
الخدمات الأساسية
System Status Feb 16
- التاريخ
- 16 شباط 2004
- الفئة
- الخدمات الأساسية
- النص متوفر
- الإنكليزية
- عدد الملفات
- 1
معاينة الجدول
الورقة «A-Steam Power Stations»: 16 صفاً × 13 عموداً
| Report Date - 16 FEBRUARY 2004 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| A - Steam Power Stations | ||||||||||||
| Power Stations | Type Fuel | No. of Units | No. of Operating Units | Units Load (MW) | Total Load MW | Target Load MW | Remarks | |||||
| 1 | 2 | 3 | 4 | 5 | 6 | |||||||
| Dibis | Natural Gas | 4 | 1 | 8 | 8 | 24 | #2 boiler leakage; #3 prog maint; #4 boiler leakage | |||||
| Baiji | Fuel Oil | 6 | 3 | 90 | 75 | 95 | 260 | 500 | #2 prog maint; #4 boiler leakage; #5 forced outage | |||
| Daura | Fuel Oil | 4 | 1 | 70 | 70 | 180 | #4 prog maint; #5 & #6 rehab | |||||
| South Baghdad | Fuel Oil | 6 | 3 | 20 | 30 | 30 | 80 | 200 | #1 & #2 prog maint; #3 synch at 1880; #5 a/h | |||
| Mussaibe | Crude and Fuel Oil | 4 | 2 | 195 | 195 | 390 | 860 | #2 stopped at 523 ehg; #4 prog maint | ||||
| Nassirya | Crude | 4 | 3 | 165 | 165 | 145 | 475 | 600 | #1 cond cleaning | |||
| Najebia | Natural Gas and Crude | 2 | 2 | 35 | 85 | 120 | 160 | #4 one boiler in operation | ||||
| Hartha | Natural Gas and Crude | 4 | 1 | 134 | 134 | 300 | #3 prog maint | |||||
| Out of Service for Unscheduled Maintanence | Total: | 1,537 | 2,824 | |||||||||
| Out of Service for Program Maintanence/Rehab | ||||||||||||
| No activity | ||||||||||||
| Not Performing at Peak Performance |
الورقة «B- Gas_C-Power Stations»: 26 صفاً × 13 عموداً
| Report Date - 16 FEBRUARY 2004 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| B- Gas Power Stations | C -Hydro Power Stations | |||||||||||
| Power Stations | No. of Units | No. of Operating Units | Station Load | Target Load | Fuel Use | Remarks | Power Stations | No. of Units | No. of Operating Units | Station Load | Target Load | Discharge m3/Sec |
| Gas Pressure | ||||||||||||
| Baiji | 2 | 125 | Gas Oil | #1 synch at 1802 - stopped at 705 tran line trip; #2 lub oil leak from bearing | Musil Dam Main | 4 | 4 | 555 | 600 | |||
| Quds | 2 | 2 | 150 | 160 | Gas Oil | 30 trucks | Musil Dam reg | 4 | 4 | 39 | 60 | 800 |
| Mosil | 12 | 7 | 55 | 150 | 14 | #1 rotor defec; #3 & #4 stopped at 515 g.p.l.; #8 stopped at 935 g.p.l.; #9 rotor defect | Musil Pumping | 2 | 1 | 100 | 0 | |
| Dibis | 3 | 2 | 35 | 30 | 19 | #4 rehab | Haditha Dam | 6 | 2 | 125 | 160 | 350 |
| Old Mulla | 12 | 7 | 97 | 128 | 350 | #1 acc gear; #2 servo; #3 synch at 1030; #5 prog maint; #10 prog maint; #12 needs rehab | Samarra | 3 | 2 | 40 | 55 | 440 |
| New Mulla | 6 | 4 | 145 | 173 | 3.20 | #1 prog maint; #6 generator defect | Himrin | 2 | 2 | 42 | 21 | 160 |
| Taji | 7 | 5 | 70 | 55 | 13 | #3 compressor; #7 needs rehab | Hindia | 4 | 4 | 5 | 5 | 180 |
| M. Taji | 2 | 18 | #2 software | Kufa | 4 | 0 | ||||||
| Daura | 4 | 1 | 10 | 30 | 13 | #3 needs rehab; #4 stopped at 703 g.p.l. | Total | 906 | 896 | |||
| Hilla | 4 | 2 | 35 | 64 | 35 | #1 cooling sys prob; #2 servo | System Generation | 78,781 | MWh | |||
| Najaf | 3 | 2 | 90 | 129 | 32 | #2 prog maint | Syrian Line Generation | 1,398 | MWh | |||
| Khor | 4 | 3 | 120 | 80 | Natural Gas | #4 rehab | Turkey Line Generation | 1,963 | MWh | |||
| Shuaiba | 2 | 1 | 6 | 20 | Natural Gas | #1 prog maint | Total Generation | 87,570 | MWh | |||
| M. Shuaiba | 2 | Natural Gas | split with the refinery | System Peak Load | 3,913 | MW | ||||||
| Petro | 4 | 1 | 10 | 0 | Natural Gas | Syria Peak Load | 60 | MW | ||||
| M. Dibis | 4 | 3 | 9 | 24 | Natural Gas | Turkey Peak Load | 85 | MW | ||||
| Mossil East | 5 | 3 | 17 | 0 | Gas Oil | Fixed Gen Peak Load | 266 | MW | ||||
| Hmam/Zafranya | 7 | 2 | 8 | Gas Oil | Total Peak Load | 4,324 | MW | |||||
| Diesel | 46 | Gas Oil | Baghdad Load | 1,620 | MW | |||||||
| Total | 903 | 1,186 | ||||||||||
| Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590). | ||||||||||||
| Edited by Electricity Commission U.S. Advisor Staff. |
الورقة «Peak Loads»: 24 صفاً × 4 أعمدة · المعاينة لأول 21 صفاً؛ الملف الكامل من زر الأصل
| Report Date - 16 FEBRUARY 2004 | |||
|---|---|---|---|
| GOVERNORATE | Peak Load MW | MWH | Average Load MW |
| Power transferred from North to Middle 815 MW. | |||
| Power transferred from South to Middle 225 MW. | |||
| Baghdad | 1,620 | 28,870 | 1,203 |
| Duhok | 85 | 1,920 | 80 |
| Naynawa | 365 | 11,304 | 471 |
| Tamim | 135 | 4,103 | 171 |
| Salah Aldeen | 215 | 5,442 | 227 |
| Anbar | 195 | 4,402 | 183 |
| Dyala | 104 | 2,062 | 86 |
| Babil | 105 | 2,203 | 92 |
| Kirbala | 85 | 1,791 | 75 |
| Najaf | 105 | 2,178 | 91 |
| Kadsya | 70 | 1,472 | 61 |
| Wasit | 95 | 2,058 | 86 |
| Muthana | 60 | 1,374 | 57 |
| Nasirya | 125 | 2,713 | 113 |
| Misan | 67 | 1,474 | 61 |
| Basra | 320 | 6,934 | 289 |