# A-Steam Power Stations
REPORT DATE -5 DECEMBER 2003
A - Steam Power Stations
Power Stations Type No. of Units No. of Operating Units Units Load (MW) Total Load MW Target Load Remarks Fuel 1 2 3 4 5 6 MW Dibis Natural Gas 4 0 0 0 0 0 0 24 No.1 loss of flame. No. 3 boiler leak. No. 2 FWP. No. 4 HET.
Baiji Fuel Oil 6 4 100 80 90 85 0 0 355 500 No. 5 rehab. No. 6 stopped 1130 programmed mnt (5 DEC to 20 JAN).
Dura Fuel Oil 4 1 75 0 0 0 75 180 No. 4: Programmed Maintenance 10 OCT to 25 NOV. Nos. 5 & 6: Rehabilitation.
South Baghdad Fuel Oil 6 3 35 25 0 35 0 0 95 200 No. 6 programmed mnt 11 NOV to 26 DEC. No. 5 boiler leak. No. 3 stopped 0723 A/H.
Mussaibe Crude and Fuel Oil 4 3 200 105 0 200 505 860 No. 3 program mnt 5 NOV to 20 DEC.
Nassirya Crude 4 2 150 0 0 100 250 600 No. 3 programmed mnt 11 NOV to 11 DEC. No. 2 fuel pump.
Najebia Natural Gas and Crude 2 1 0 60 60 160 No. 4 programmed mnt 6 NOV to 21 DEC. No 5 limited to load flow.
Hartha Natural Gas and Crude 4 1 100 0 100 300 No. 4 Programmed Maintenance from 23 OCT to 23 DEC.
Total: 1440 2824
# B- Gas_C-Power Stations
Report Date- 5 DECEMBER 2003 B- Gas Power Stations C -Hydro Power Stations Power Stations No. of Units No. of Operating Units Station Load Target Load Fuel Use Remarks Power Stations No. of Units No. of Operating Units Station Load Target Load Discharge m3/Sec Gas Pressure Baiji 2 1 120 125 Gas Oil No. 2 oil leak. Musil Dam Main 4 2 200 600 Quds 2 2 215 160 Gas Oil 46 trucks. Musil Dam reg 4 3 30 60 450 Mosil 12 8 120 150 N/A No. 1 rotor defect. No. 2 ACC. No. 8 program mnt. No. 3 control cards. Musil Pumping 2 0 0 0 Dibis 3 0 0 60 N/A No. 5 problem turbine rotor. No. 6: Programmed Maintenance. No. 4 rotor defect. Haditha Dam 6 2 80 160 350 Old Mulla 12 8 108 128 N/A No. 1 gas control. No. 2 gen protec. No. 5 Programmed Mnt. No. 12 rehab. Samarra 3 0 0 55 0 New Mulla 6 3 98 173 N/A No. 6 Generator Defective. No. 3 prog. Mnt. No. 1 EF. Himrin 2 1 18 21 75 Taji 7 3 55 55 N/A No. 5 clutch. No.7 Rehabilitation. No. 2 look out gen. No. 4 generator look out. Hindia 4 2 3 5 100 M. Taji 2 0 0 20 N/A NGPL Kufa 4 0 0 1 0 Dura 4 2 28 30 N/A No.3 Rehabilitation. No. 1 control. Total 331 896 Hilla 4 4 65 64 N/A System Generation 73928 MWh Najaf 3 2 95 129 N/A No. 2 program mnt. Syrian Line Generation 1402 MWh Khor 4 3 90 80 Natural Gas No. 4: Rehabilitation. Turkey Line Generation 1848 MWh Shuaiba 2 1 10 20 Natural Gas No. 1 S/B. Total Generation 77178 MWh Petro 4 0 0 0 Natural Gas System Peak Load 3396 MW M. Dibis 4 0 0 24 Natural Gas Syria Peak Load 50 MW Mossil East 5 0 0 15 Gas Oil Turkey Peak Load 80 MW Hmam 2 0 0 Gas Oil Fixed Gen Peak Load 77 MW Total Peak Load 3603 MW Total 1004 1233 Baghdad Load 1300 MW Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590).
Edited by Electricity Commission U.S. Advisor Staff.
# Peak Loads
GOVERNORATE Peak Load MW MWH Average Load MW 5 DECEMBER, 2003 Baghdad N/A N/A 15 N/A Duhok N/A N/A 15 Naynawa N/A N/A 15 N/A Tamim N/A N/A 15 Salah Aldeen N/A N/A 15 Anbar N/A N/A 15 Dyala N/A N/A 15 Babil N/A N/A 15 Kirbala N/A N/A 15 Najaf N/A N/A 15 Kadsya N/A N/A 15 Wasit N/A N/A 15 Muthana N/A N/A 15 Nasirya N/A N/A 15 Misan N/A N/A 15 Basra N/A N/A 15 0 No report received for today.
الرئيسية / الخدمات الأساسية / ESS-48944355
الخدمات الأساسية
power system6dec03
- التاريخ
- 6 كانون الأول 2003
- الفئة
- الخدمات الأساسية
- النص متوفر
- الإنكليزية
- عدد الملفات
- 1
معاينة الجدول
الورقة «A-Steam Power Stations»: 13 صفاً × 13 عموداً
| REPORT DATE -5 DECEMBER 2003 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| A - Steam Power Stations | ||||||||||||
| Power Stations | Type | No. of Units | No. of Operating Units | Units Load (MW) | Total Load MW | Target Load | Remarks | |||||
| Fuel | 1 | 2 | 3 | 4 | 5 | 6 | MW | |||||
| Dibis | Natural Gas | 4 | 0 | 0 | 0 | 0 | 0 | 0 | 24 | No.1 loss of flame. No. 3 boiler leak. No. 2 FWP. No. 4 HET. | ||
| Baiji | Fuel Oil | 6 | 4 | 100 | 80 | 90 | 85 | 0 | 0 | 355 | 500 | No. 5 rehab. No. 6 stopped 1130 programmed mnt (5 DEC to 20 JAN). |
| Dura | Fuel Oil | 4 | 1 | 75 | 0 | 0 | 0 | 75 | 180 | No. 4: Programmed Maintenance 10 OCT to 25 NOV. Nos. 5 & 6: Rehabilitation. | ||
| South Baghdad | Fuel Oil | 6 | 3 | 35 | 25 | 0 | 35 | 0 | 0 | 95 | 200 | No. 6 programmed mnt 11 NOV to 26 DEC. No. 5 boiler leak. No. 3 stopped 0723 A/H. |
| Mussaibe | Crude and Fuel Oil | 4 | 3 | 200 | 105 | 0 | 200 | 505 | 860 | No. 3 program mnt 5 NOV to 20 DEC. | ||
| Nassirya | Crude | 4 | 2 | 150 | 0 | 0 | 100 | 250 | 600 | No. 3 programmed mnt 11 NOV to 11 DEC. No. 2 fuel pump. | ||
| Najebia | Natural Gas and Crude | 2 | 1 | 0 | 60 | 60 | 160 | No. 4 programmed mnt 6 NOV to 21 DEC. No 5 limited to load flow. | ||||
| Hartha | Natural Gas and Crude | 4 | 1 | 100 | 0 | 100 | 300 | No. 4 Programmed Maintenance from 23 OCT to 23 DEC. | ||||
| Total: | 1,440 | 2,824 |
الورقة «B- Gas_C-Power Stations»: 25 صفاً × 13 عموداً
| Report Date- 5 DECEMBER 2003 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| B- Gas Power Stations | C -Hydro Power Stations | |||||||||||
| Power Stations | No. of Units | No. of Operating Units | Station Load | Target Load | Fuel Use | Remarks | Power Stations | No. of Units | No. of Operating Units | Station Load | Target Load | Discharge m3/Sec |
| Gas Pressure | ||||||||||||
| Baiji | 2 | 1 | 120 | 125 | Gas Oil | No. 2 oil leak. | Musil Dam Main | 4 | 2 | 200 | 600 | |
| Quds | 2 | 2 | 215 | 160 | Gas Oil | 46 trucks. | Musil Dam reg | 4 | 3 | 30 | 60 | 450 |
| Mosil | 12 | 8 | 120 | 150 | N/A | No. 1 rotor defect. No. 2 ACC. No. 8 program mnt. No. 3 control cards. | Musil Pumping | 2 | 0 | 0 | 0 | |
| Dibis | 3 | 0 | 0 | 60 | N/A | No. 5 problem turbine rotor. No. 6: Programmed Maintenance. No. 4 rotor defect. | Haditha Dam | 6 | 2 | 80 | 160 | 350 |
| Old Mulla | 12 | 8 | 108 | 128 | N/A | No. 1 gas control. No. 2 gen protec. No. 5 Programmed Mnt. No. 12 rehab. | Samarra | 3 | 0 | 0 | 55 | 0 |
| New Mulla | 6 | 3 | 98 | 173 | N/A | No. 6 Generator Defective. No. 3 prog. Mnt. No. 1 EF. | Himrin | 2 | 1 | 18 | 21 | 75 |
| Taji | 7 | 3 | 55 | 55 | N/A | No. 5 clutch. No.7 Rehabilitation. No. 2 look out gen. No. 4 generator look out. | Hindia | 4 | 2 | 3 | 5 | 100 |
| M. Taji | 2 | 0 | 0 | 20 | N/A | NGPL | Kufa | 4 | 0 | 0 | 1 | 0 |
| Dura | 4 | 2 | 28 | 30 | N/A | No.3 Rehabilitation. No. 1 control. | Total | 331 | 896 | |||
| Hilla | 4 | 4 | 65 | 64 | N/A | System Generation | 73,928 | MWh | ||||
| Najaf | 3 | 2 | 95 | 129 | N/A | No. 2 program mnt. | Syrian Line Generation | 1,402 | MWh | |||
| Khor | 4 | 3 | 90 | 80 | Natural Gas | No. 4: Rehabilitation. | Turkey Line Generation | 1,848 | MWh | |||
| Shuaiba | 2 | 1 | 10 | 20 | Natural Gas | No. 1 S/B. | Total Generation | 77,178 | MWh | |||
| Petro | 4 | 0 | 0 | 0 | Natural Gas | System Peak Load | 3,396 | MW | ||||
| M. Dibis | 4 | 0 | 0 | 24 | Natural Gas | Syria Peak Load | 50 | MW | ||||
| Mossil East | 5 | 0 | 0 | 15 | Gas Oil | Turkey Peak Load | 80 | MW | ||||
| Hmam | 2 | 0 | 0 | Gas Oil | Fixed Gen Peak Load | 77 | MW | |||||
| Total Peak Load | 3,603 | MW | ||||||||||
| Total | 1,004 | 1,233 | Baghdad Load | 1,300 | MW | |||||||
| Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590). | ||||||||||||
| Edited by Electricity Commission U.S. Advisor Staff. |
الورقة «Peak Loads»: 21 صفاً × 5 أعمدة · المعاينة لأول 20 صفاً؛ الملف الكامل من زر الأصل
| GOVERNORATE | Peak Load MW | MWH | Average Load MW | 5 DECEMBER, 2003 |
|---|---|---|---|---|
| Baghdad | N/A | N/A | 15 | N/A |
| Duhok | N/A | N/A | 15 | |
| Naynawa | N/A | N/A | 15 | N/A |
| Tamim | N/A | N/A | 15 | |
| Salah Aldeen | N/A | N/A | 15 | |
| Anbar | N/A | N/A | 15 | |
| Dyala | N/A | N/A | 15 | |
| Babil | N/A | N/A | 15 | |
| Kirbala | N/A | N/A | 15 | |
| Najaf | N/A | N/A | 15 | |
| Kadsya | N/A | N/A | 15 | |
| Wasit | N/A | N/A | 15 | |
| Muthana | N/A | N/A | 15 | |
| Nasirya | N/A | N/A | 15 | |
| Misan | N/A | N/A | 15 | |
| Basra | N/A | N/A | 15 | |
| 0 | ||||
| No report received for today. |
تظليل نتائج البحث عن: