الرئيسية / الخدمات الأساسية / ESS-467fd7f4

الخدمات الأساسية

DAILY POWER SYSTEM HIGHLIGHTS FOR APRIL 14, 2004

التاريخ
14 نيسان 2004
الفئة
الخدمات الأساسية
النص متوفر
الإنكليزية
عدد الملفات
1
الأصل الإنكليزي DOCتنزيل النص الإنكليزي
DAILY POWER SYSTEM HIGHLIGHTS FOR APRIL 14, 2004 The CPA Electricity Advisor issues this report to note significant events or conditions of interest in the power sector. The basic daily data on the power system is available on the CPA web site. HIGHLIGHTS: Qadisiyah-Baghdad South 400 Kv Transmission Line is back in service. The Haditha-Baghdad West 400 Kv Transmission line operational now. We will continue to see decreased power as we progress through the spring maintenance period. Generation: Peak Power 3486Mw, 71,682Mw hours, 7-day Avg. 3686Mw Generators Returned to Service: 135 Mw Najebia 4 70 Mw Old Mulla 11 15 Mw Khor Zubayr 4 50 Mw Generators Unscheduled Out of Service (17) 473 Mw PLANT Type SP, CP, RP, HP Fault Mw * Baiji 4 SP High water consumption 70 Dibis 2 SP Boiler Leak 8 South Baghdad 5 SP Boiler Leak 30 Baiji 1 CP Filter Cleaning 85 Baiji Mobile, 1,2,3,4 CP No Fuel 100 Doura 4 CP Natural Gas Pressure low 15 Hilla 5 CP Test 15 Mosil 1 CP Rotor Defect 15 Mosil 3 CP Power Supply problem 15 Mosil 9 CP Rotor Defect 15 Old Mulla 1 CP Acc Gear 15 Old Mulla 6 CP High exhaust temperature 15 Old Mulla 7 CP Generator Vibrations 15 Old Mulla 8 CP Vibrations 15 Taji 3, CP Compressor 15 Taji 5 CP Excitor problem 15 M. Taji 2 CP Software 15 RED – Denotes out of service since last report Generators Scheduled Out of Service (27) 1918 Mw PLANT Type SP/NG Prog. Maintenance(M) / Rehab (R) Maint. Org. Date out-of -service Est. In-service Date Mw Baiji 1 SP M TBD 21 Mar 04 21 May 100 Baiji 3 SP M Bechtel 29 Feb 04 1 May 100 Dibis 4 SP M ME 15 Mar 04 30 Apr 8 Doura 3 CP R GRD/RIE 1 Mar 03 TBD 20 Doura 3 SP M ME 18 Mar 04 18 May 65 Doura 4 SP M ME 2 Feb 04 20 Apr 65 Doura 5 SP R Bechtel Jul 03 20 Jun 100 Doura 6 SP R Bechtel Jul 03 20 Jul 100 Dibis 4 CP R GRD/RIE Sep 03 12 May 30 Hartha 1 SP M ME 22 Mar 04 23 May 100 Khor Zubayr 1 CP M ME 4 Apr 04 TBD 50 Khor Zubayr 2 CP R GRD/RIE 15 Mar 04 15 Jun 50 Mosil 11 CP M ME 2 Apr 04 TBD 15 Mussaibe 2 SP M ME 28 Feb 04 28 Apr 200 Mussaibe 4 SP M ME 7 Feb 04 30 Apr 200 Nassirya 1 SP M ME 30 Mar 04 15 May 130 Nassirya 2 SP M ME 9 Mar 04 15 Apr 150 Nassirya 3 SP M ME 31 Mar 04 15 Apr 130 Nassirya 4 SP M ME 31 Mar 04 15 Apr 130 New Mulla 6 CP R GRD/RIE 28 Mar 04 15 May 30 Old Mulla 12 CP R GRD/RIE 1 Oct 03 15 May 15 Shuaiba 1 CP M ME 14 Feb 04 31 May 20 South Baghdad 1 SP M ME 12 Feb 04 12 Apr 30 South Baghdad 2 SP M ME 12 Feb 04 12 Apr 30 South Baghdad 3 SP R ME 18 Mar 04 18 May 20 Taji 7 CP R GRD/RIE 1 Oct 03 15 May 15 Taji 6 CP M ME 2 Apr 04 TBD 15 LEGEND OF ELECTRICAL SYSTEM POWER SOURCE SP: STEAM POWER – These plants use either fuel oil or crude in burners CP: COMBUSTION POWER RP: RECIPROCATING POWER HP: HYDRO POWER Transmission: LINE Kv Fault Maint. Org. Date out-of -service Est. In-service Date Comments Nassiriya-Khor Zubayr 400 Sabotage Bechtel 26 May 102 towers complete/212req’d Haditha-Baghd West 400 Sabotage GRD/RIE Complete 246 towers complete/246 req’d Hartha-Qut – Wasit 400 Sabotage GRD/RIE Complete MoE completing PLC work Baiji - Baghd West #1 400 Sabotage GRD/RIE Complete In service 13 Apr Baghd E.-Baghd S. #2 400 New Line GRD/RIE Complete 81 towers complete/81req’d Haditha – Qaim 400 Sabotage GRD-RIE TBD No contract awarded Baiji – Haditha 400 Sabotage Bechtel TBD No contract awarded Diyala Connection 400 New Line ME 15 Jun Dibis/Erbil-Qara Qosh 132 New Line GRD/RIE 15 May Contractor mobilized Dibis to Old Kirkuk 132 Reconductor GRD-RIE 15 Jun Bids for work under evaluation Mosul – Mosul East 132 Sabotage ME TBD Shuwaiba-Toba-Hamar 132 Sabotage ME Complete 44 towers complete/44 req’d Samediya – New Baghdad 132 Reconductor GRD-RIE 15 Jun Contract Awarded 24 Mar Jazair to Yarmook 132 Reconductor GRD-RIE 15 Jun Contract Awarded 24 Mar Baghd West – Jamia 132 Sabotage ME TBD Al Amarah-Burzulgan 132 Looting GRD-RIE 15 Jun 26 towers complete /126 req’d Temim- Tuz 132 Sabotage ME TBD Nejibiya – Hartha 132 Sabotage ME TBD Lines Returned to service: Distribution: Power transferred from North to Middle 850 MW. Power transferred from South to Middle -150 MW. GOVERNORATE Peak Load MW MWH Average Load MW Demand Load MW Baghdad 952 21985 916 1472 Duhok 82 1951 81 115 Naynawa 285 6608 275 511 Tamim 122 2818 117 188 Salah Aldeen 212 4479 187 257 Anbar 190 4168 174 246 Dyala 75 1645 69 136 Babil 77 2044 85 139 Kirbala 109 2139 89 100 Najaf 130 2402 100 124 Kadsya 86 1906 79 125 Wasit 59 1257 52 90 Muthana 62 1279 53 85 Nasirya 130 2137 89 129 Misan 70 1354 56 87 Basra 250 5367 224 224 Data compiled and reported by: LTC Tharnell M. Thomas CENTCOM LNO CPA Ministry of Electricity thomast2orha.centcom.mil Page PAGE 1 of NUMPAGES 3