# A-Steam Power Stations
Reporting Peak for 10 MAY 2004 / Report Date - 12 MAY 2004 A - Steam Power Stations Power Stations Type Fuel No. of Units No. of Operating Units Units Load (MW) Total Load MW Target Load MW Remarks 1 2 3 4 5 6 Dibis Natural Gas 4 1 8 8 24 #1 stopped at 0036 boiler leak; #2 synch at 1440; #3 gen earth fault; #4 prog maint Baiji Fuel Oil 6 4 125 80 100 305 500 #1 prog maint; #3 1952 GRF Daura Fuel Oil 4 0 180 #3, #4 prog maint; #5, #6 rehab South Baghdad Fuel Oil 6 2 25 30 55 200 #1, #2, #3 prog maint; #5 A/H Mussaibe Crude and Fuel Oil 4 2 245 200 95 540 860 #2 prog maint; #4 oil leak Nassirya Crude 4 3 150 165 120 435 600 #1 prog maint Najebia Natural Gas and Crude 2 1 80 80 160 #5 thrust bearing prob Hartha Natural Gas and Crude 4 1 180 180 300 #1 prog maint Out of Service for Unscheduled Maintanence Total: 1603 2824 Out of Service for Program Maintanence/Rehab No activity Not Performing at Peak Performance
# B- Gas_C-Power Stations
Reporting Peak for 10 MAY 2004 / Report Date - 12 MAY 2004 B- Gas Power Stations C -Hydro Power Stations Power Stations No. of Units No. of Operating Units Station Load Target Load Fuel Use Remarks Power Stations No. of Units No. of Operating Units Station Load Target Load Discharge m3/Sec Gas Pressure Baiji 2 1 85 125 GO+1+FO #2 0102 tripp UIE Musil Dam Main 4 3 500 600 M. Baiji 8 3 60 Gas Oil Musil Dam reg 4 2 27 60 300 Quds 2 2 150 160 CO & GO Musil Pumping 2 0 Mosil 12 6 100 150 27 #1, #2 TF; #6 reverse power; #7 prog maint; #8 TF Haditha Dam 6 4 210 160 400 Dibis 3 2 45 30 28 #4 TF Samarra 3 3 46 55 400 Old Mulla 12 7 80 128 460 #1, #2 TF; #4 engine unbalance; #8 prog maint; #12 TF Himrin 2 2 36 21 135 New Mulla 6 5 130 173 300 #6 TF Hindia 4 4 5 5 140 Taji 7 55 #1, #2 NGPL; #3, #4 TF; #5 TF; #6 prog maint; #7 TF Kufa 4 0 M. Taji 2 18 Gas Oil #1, #2 TF Total 824 896 Daura 4 30 #1, #2 NGPL; #3 needs rehab; #4 prog maint System Generation 72735 MWh Hilla 4 4 60 64 22 #5 running during peak load Syrian Line Generation 1439 MWh Najaf 3 3 110 129 20 Turkey Line Generation 1901 MWh Khor 4 3 140 80 Natural Gas #2 prog maint; #4 synch at 1527 Total Generation 81502 MWh Shuaiba 2 2 7 20 Natural Gas #2 S/B System Peak Load 3501 MW M. Shuaiba 2 Natural Gas Syria Peak Load 60 MW Petro 4 0 Natural Gas Turkey Peak Load 81 MW M. Dibis 4 3 9 24 Natural Gas Fixed Gen Peak Load 266 MW Mossil East 5 2 10 0 Gas Oil Total Peak Load 3908 MW Hmam/Zafranya 7 1 2 Gas Oil Baghdad Load 1320 MW Diesel 76 Gas Oil Total 1064 1186 Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590).
Edited by Electricity Commission U.S. Advisor Staff.
# Peak Loads
Reporting Peak for 10 MAY 2004 / Report Date - 12 MAY 2004 Power transferred from North to Middle 950 MW.
Power transferred from South to Middle 200 MW.
GOVERNORATE Peak Load MW MWH Average Load MW Demand Load MW Baghdad 1320 25960 1082 1539 Duhok 82 1904 79 116 Naynawa 320 6616 276 509 Tamim 140 2876 120 195 Salah Aldeen 190 4529 189 254 Anbar 182 4075 170 232 Dyala 95 1831 76 143 Babil 95 7077 87 146 Kirbala 85 1719 72 116 Najaf 98 2024 84 141 Kadsya 50 1322 55 100 Wasit 90 1835 76 132 Muthana 55 1267 53 78 Nasirya 101 2512 105 124 Misan 65 1491 62 83 Basra 290 7015 292 343
الرئيسية / الخدمات الأساسية / ESS-3a73cc30
الخدمات الأساسية
System Status May 11
- التاريخ
- 11 أيار 2004
- الفئة
- الخدمات الأساسية
- النص متوفر
- الإنكليزية
- عدد الملفات
- 1
معاينة الجدول
الورقة «A-Steam Power Stations»: 16 صفاً × 13 عموداً
| Reporting Peak for 10 MAY 2004 / Report Date - 12 MAY 2004 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| A - Steam Power Stations | ||||||||||||
| Power Stations | Type Fuel | No. of Units | No. of Operating Units | Units Load (MW) | Total Load MW | Target Load MW | Remarks | |||||
| 1 | 2 | 3 | 4 | 5 | 6 | |||||||
| Dibis | Natural Gas | 4 | 1 | 8 | 8 | 24 | #1 stopped at 0036 boiler leak; #2 synch at 1440; #3 gen earth fault; #4 prog maint | |||||
| Baiji | Fuel Oil | 6 | 4 | 125 | 80 | 100 | 305 | 500 | #1 prog maint; #3 1952 GRF | |||
| Daura | Fuel Oil | 4 | 0 | 180 | #3, #4 prog maint; #5, #6 rehab | |||||||
| South Baghdad | Fuel Oil | 6 | 2 | 25 | 30 | 55 | 200 | #1, #2, #3 prog maint; #5 A/H | ||||
| Mussaibe | Crude and Fuel Oil | 4 | 2 | 245 | 200 | 95 | 540 | 860 | #2 prog maint; #4 oil leak | |||
| Nassirya | Crude | 4 | 3 | 150 | 165 | 120 | 435 | 600 | #1 prog maint | |||
| Najebia | Natural Gas and Crude | 2 | 1 | 80 | 80 | 160 | #5 thrust bearing prob | |||||
| Hartha | Natural Gas and Crude | 4 | 1 | 180 | 180 | 300 | #1 prog maint | |||||
| Out of Service for Unscheduled Maintanence | Total: | 1,603 | 2,824 | |||||||||
| Out of Service for Program Maintanence/Rehab | ||||||||||||
| No activity | ||||||||||||
| Not Performing at Peak Performance |
الورقة «B- Gas_C-Power Stations»: 27 صفاً × 13 عموداً
| Reporting Peak for 10 MAY 2004 / Report Date - 12 MAY 2004 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| B- Gas Power Stations | C -Hydro Power Stations | |||||||||||
| Power Stations | No. of Units | No. of Operating Units | Station Load | Target Load | Fuel Use | Remarks | Power Stations | No. of Units | No. of Operating Units | Station Load | Target Load | Discharge m3/Sec |
| Gas Pressure | ||||||||||||
| Baiji | 2 | 1 | 85 | 125 | GO+1+FO | #2 0102 tripp UIE | Musil Dam Main | 4 | 3 | 500 | 600 | |
| M. Baiji | 8 | 3 | 60 | Gas Oil | Musil Dam reg | 4 | 2 | 27 | 60 | 300 | ||
| Quds | 2 | 2 | 150 | 160 | CO & GO | Musil Pumping | 2 | 0 | ||||
| Mosil | 12 | 6 | 100 | 150 | 27 | #1, #2 TF; #6 reverse power; #7 prog maint; #8 TF | Haditha Dam | 6 | 4 | 210 | 160 | 400 |
| Dibis | 3 | 2 | 45 | 30 | 28 | #4 TF | Samarra | 3 | 3 | 46 | 55 | 400 |
| Old Mulla | 12 | 7 | 80 | 128 | 460 | #1, #2 TF; #4 engine unbalance; #8 prog maint; #12 TF | Himrin | 2 | 2 | 36 | 21 | 135 |
| New Mulla | 6 | 5 | 130 | 173 | 300 | #6 TF | Hindia | 4 | 4 | 5 | 5 | 140 |
| Taji | 7 | 55 | #1, #2 NGPL; #3, #4 TF; #5 TF; #6 prog maint; #7 TF | Kufa | 4 | 0 | ||||||
| M. Taji | 2 | 18 | Gas Oil | #1, #2 TF | Total | 824 | 896 | |||||
| Daura | 4 | 30 | #1, #2 NGPL; #3 needs rehab; #4 prog maint | System Generation | 72,735 | MWh | ||||||
| Hilla | 4 | 4 | 60 | 64 | 22 | #5 running during peak load | Syrian Line Generation | 1,439 | MWh | |||
| Najaf | 3 | 3 | 110 | 129 | 20 | Turkey Line Generation | 1,901 | MWh | ||||
| Khor | 4 | 3 | 140 | 80 | Natural Gas | #2 prog maint; #4 synch at 1527 | Total Generation | 81,502 | MWh | |||
| Shuaiba | 2 | 2 | 7 | 20 | Natural Gas | #2 S/B | System Peak Load | 3,501 | MW | |||
| M. Shuaiba | 2 | Natural Gas | Syria Peak Load | 60 | MW | |||||||
| Petro | 4 | 0 | Natural Gas | Turkey Peak Load | 81 | MW | ||||||
| M. Dibis | 4 | 3 | 9 | 24 | Natural Gas | Fixed Gen Peak Load | 266 | MW | ||||
| Mossil East | 5 | 2 | 10 | 0 | Gas Oil | Total Peak Load | 3,908 | MW | ||||
| Hmam/Zafranya | 7 | 1 | 2 | Gas Oil | Baghdad Load | 1,320 | MW | |||||
| Diesel | 76 | Gas Oil | ||||||||||
| Total | 1,064 | 1,186 | ||||||||||
| Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590). | ||||||||||||
| Edited by Electricity Commission U.S. Advisor Staff. |
الورقة «Peak Loads»: 24 صفاً × 5 أعمدة · المعاينة لأول 21 صفاً؛ الملف الكامل من زر الأصل
| Reporting Peak for 10 MAY 2004 / Report Date - 12 MAY 2004 | ||||
|---|---|---|---|---|
| Power transferred from North to Middle 950 MW. | ||||
| Power transferred from South to Middle 200 MW. | ||||
| GOVERNORATE | Peak Load MW | MWH | Average Load MW | Demand Load MW |
| Baghdad | 1,320 | 25,960 | 1,082 | 1,539 |
| Duhok | 82 | 1,904 | 79 | 116 |
| Naynawa | 320 | 6,616 | 276 | 509 |
| Tamim | 140 | 2,876 | 120 | 195 |
| Salah Aldeen | 190 | 4,529 | 189 | 254 |
| Anbar | 182 | 4,075 | 170 | 232 |
| Dyala | 95 | 1,831 | 76 | 143 |
| Babil | 95 | 7,077 | 87 | 146 |
| Kirbala | 85 | 1,719 | 72 | 116 |
| Najaf | 98 | 2,024 | 84 | 141 |
| Kadsya | 50 | 1,322 | 55 | 100 |
| Wasit | 90 | 1,835 | 76 | 132 |
| Muthana | 55 | 1,267 | 53 | 78 |
| Nasirya | 101 | 2,512 | 105 | 124 |
| Misan | 65 | 1,491 | 62 | 83 |
| Basra | 290 | 7,015 | 292 | 343 |