REPORT DATE -30 NOVEMBER 2003
A - Steam Power Stations
Power StationsTypeNo. of UnitsNo. of Operating UnitsUnits Load (MW)Total Load MWTarget LoadRemarks
Fuel123456MW
DibisNatural Gas4208081624No.1 loss of flame. No. 3 tripped at 1614 boiler leak.
BaijiFuel Oil63090900085265500No. 5 rehab. No. 1 and 4 boiler leak.
DuraFuel Oil417500075180No. 4: Programmed Maintenance 10 OCT to 25 NOV. Nos. 5 & 6: Rehabilitation.
South BaghdadFuel Oil643525303500125200No. 6 programmed mnt 11 NOV to 26 DEC. No. 4 synch 1410. No. 5 stopped boiler leak.
MussaibeCrude and Fuel Oil41000200200860No. 2 synch at 2110 and tripped at 0758 DLL. No. 3 program mnt 5 NOV to 20 DEC. No. 1 boiler leak.
NassiryaCrude431501500100400600No. 3 programmed mnt 11 NOV to 11 DEC.
NajebiaNatural Gas and Crude2104040160No. 4 programmed mnt 6 NOV to 21 DEC. No. 5 synch at 0019 with boiler No.6.
HarthaNatural Gas and Crude411550155300No. 4 Programmed Maintenance from 23 OCT to 23 DEC.
Total:1,2762,824
# A-Steam Power Stations REPORT DATE -30 NOVEMBER 2003 A - Steam Power Stations Power Stations Type No. of Units No. of Operating Units Units Load (MW) Total Load MW Target Load Remarks Fuel 1 2 3 4 5 6 MW Dibis Natural Gas 4 2 0 8 0 8 16 24 No.1 loss of flame. No. 3 tripped at 1614 boiler leak. Baiji Fuel Oil 6 3 0 90 90 0 0 85 265 500 No. 5 rehab. No. 1 and 4 boiler leak. Dura Fuel Oil 4 1 75 0 0 0 75 180 No. 4: Programmed Maintenance 10 OCT to 25 NOV. Nos. 5 & 6: Rehabilitation. South Baghdad Fuel Oil 6 4 35 25 30 35 0 0 125 200 No. 6 programmed mnt 11 NOV to 26 DEC. No. 4 synch 1410. No. 5 stopped boiler leak. Mussaibe Crude and Fuel Oil 4 1 0 0 0 200 200 860 No. 2 synch at 2110 and tripped at 0758 DLL. No. 3 program mnt 5 NOV to 20 DEC. No. 1 boiler leak. Nassirya Crude 4 3 150 150 0 100 400 600 No. 3 programmed mnt 11 NOV to 11 DEC. Najebia Natural Gas and Crude 2 1 0 40 40 160 No. 4 programmed mnt 6 NOV to 21 DEC. No. 5 synch at 0019 with boiler No.6. Hartha Natural Gas and Crude 4 1 155 0 155 300 No. 4 Programmed Maintenance from 23 OCT to 23 DEC. Total: 1276 2824 # B- Gas_C-Power Stations Report Date- 30 NOVEMBER 2003 B- Gas Power Stations C -Hydro Power Stations Power Stations No. of Units No. of Operating Units Station Load Target Load Fuel Use Remarks Power Stations No. of Units No. of Operating Units Station Load Target Load Discharge m3/Sec Gas Pressure Baiji 2 1 115 125 Gas Oil No. 1 s/b. Musil Dam Main 4 2 250 600 Quds 2 2 80 160 Gas Oil 32 trucks. Musil Dam reg 4 3 30 60 450 Mosil 12 8 112 150 14 No. 1 rotor defect. No. 2 ACC. No. 8 program mnt. No. 3 control cards. Musil Pumping 2 0 0 0 Dibis 3 0 0 60 18 No. 5 problem turbine rotor. No. 6: Programmed Maintenance. No. 4 rotor defect. Haditha Dam 6 2 105 160 300 Old Mulla 12 8 86 128 19 No. 1 gas control. No. 2 gen protec. No. 5 Programmed Mnt. No. 12 rehab. Samarra 3 3 53 55 550 New Mulla 6 3 100 173 21 No. 6 Generator Defective. No. 3 prog. Mnt. No. 1 tripped at 1150 EF. Himrin 2 1 18 21 80 Taji 7 5 85 55 15 No. 5 Diesel. No.7 Rehabilitation. Hindia 4 4 5 5 60 M. Taji 2 0 0 20 0 NGPL Kufa 4 0 0 1 Dura 4 0 0 30 14 No.3 Rehabilitation. No. 1 control. No.2 and 4 NGPL. Total 461 896 Hilla 4 4 65 64 24 System Generation 64844 MWh Najaf 3 3 120 129 20 Syrian Line Generation 632 MWh Khor 4 3 100 80 Natural Gas No. 4: Rehabilitation. Turkey Line Generation 1889 MWh Shuaiba 2 1 10 20 Natural Gas No. 1 programmed mnt. Total Generation 67365 MWh Petro 4 0 0 0 Natural Gas System Peak Load 3083 MW M. Dibis 4 0 0 24 Natural Gas Syria Peak Load 57 MW Mossil East 5 0 0 15 Gas Oil Turkey Peak Load 64 MW Hmam 2 0 0 Gas Oil Fixed Gen Peak Load 77 MW Total Peak Load 3281 MW Total 873 1233 Baghdad Load 1210 MW Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590). Edited by Electricity Commission U.S. Advisor Staff. # Peak Loads GOVERNORATE Peak Load MW MWH Average Load MW 30 NOVEMBER, 2003 Baghdad 1210 22861 952.5417 Power transferred from North to Middle 745 MW Duhok 64 1844 76.8333 Naynawa 300 7079 294.9583 Power transferred from South to Middle 210 MW Tamim 107 3217 134.0417 Salah Aldeen 180 4161 173.375 Anbar 165 3863 160.9583 Dyala 60 1383 57.625 Babil 70 1917 79.875 Kirbala 70 1533 63.875 Najaf 90 2215 92.2917 Kadsya 45 1257 52.375 Wasit 60 1257 52.375 Muthana 35 1282 53.4167 Nasirya 120 1649 68.7083 Misan 60 1343 55.9583 Basra 230 5390 224.5833 2866