DAILY POWER SYSTEM HIGHLIGHTS FOR APRIL 25, 2004
The CPA Electricity Advisor issues this report to note significant events or conditions of interest in the power sector. The basic daily data on the power system is available on the CPA web site.
HIGHLIGHTS: 400 Kv Transmission lines at Qadisiyah and Kut tripped due to inclement weather causing the Nassirya Power Plant shut down. Unit 3 is operational now.
Generation:
Peak Power 3482Mw, 75,693Mw hours, 7-day Avg. 3827Mw Generators Returned to Service: (2) 45 Mw South Baghdad 6 30 Mw Mosil 8 15 Mw Generators Unscheduled Out of Service (26) 841 Mw PLANT
Type
SP, CP, RP, HP
Fault
Mw
* Dibis 2
SP
Governor speed problem
8
Dibis 3
SP
Tripped-Ground/ Differential 8
* South Baghdad 5
SP
Boiler Leak
30
Najebia 5
SP
Under Frequency
80
* Nassirya 2
SP
Station Shut down
80
* Nassirya 4
SP
Generator protection
100
Baiji 1
CP
Filter
85
Baiji Mobile, 4
CP
No Fuel Filters
25
Doura 1,2
CP
No gas pressure
40
* Hilla 5
CP
Testing
15
Khor Zubayr 4
CP
Under Frequency
50
Mosil 1
CP
Rotor Defect
15
Mosil 2
CP
Load Gear Oil leak
15
Mosil 3
CP
Excitor Problem
15
Mosil 9
CP
Rotor Defect
15
Old Mulla 9
CP
Load gear problems
15
New Mulla 4
CP
Oil system problem
30
* Qudas 2
CP
Bearing problem
95
Shuaiba 1
CP
Under Frequency
15
Shuaiba 2
CP
Vibrations
15
Taji 1,2
CP
No gas pressure
45
Taji 3,
CP
Compressor
15
Taji 5
CP
High Exhaust Temp
15
M. Taji 2
CP
Software
15
RED – Denotes out of service since last report Generators Scheduled Out of Service (26) 1318 Mw PLANT
Type
SP/NG
Prog. Maintenance(M) / Rehab (R) Maint.
Org.
Date out-of -service
Est. In-service Date
Mw
Baiji 1
SP
M
TBD
21 Mar 04
21 May
100
Baiji 3
SP
M
Bechtel
29 Feb 04
1 May
100
Dibis 4
SP
M
ME
15 Mar 04
30 Apr
8
Doura 4
CP
M
ME
14 Apr 04
31 May
20
Doura 3
CP
R
GRD/RIE
1 Mar 03
15 May
20
Doura 3
SP
M
ME
18 Mar 04
18 May
65
Doura 4
SP
M
ME
2 Feb 04
30 Apr
65
Doura 5
SP
R
Bechtel
Jul 03
20 Jun
100
Doura 6
SP
R
Bechtel
Jul 03
20 Jul
100
Dibis 4
CP
R
GRD/RIE
Sep 03
12 May
30
Hartha 1
SP
M
ME
22 Mar 04
24 May
100
Khor Zubayr 2
CP
R
GRD/RIE
15 Mar 04
3 Jul
50
Mosil 7
CP
M
ME
24 Apr 04
TBD
15
Mussaibe 2
SP
M
ME
28 Feb 04
28 Apr
200
Nassirya 1
SP
M
ME
30 Mar 04
15 May
130
New Mulla 6
CP
R
GRD/RIE
28 Mar 04
15 May
30
Old Mulla 1
CP
M
ME
17 Apr 04
15 May
15
Old Mulla 2
CP
M
ME
17 Apr 04
15 May
15
Old Mulla 8
CP
M
ME
17 Apr 04
23 Apr
15
Old Mulla 12
CP
R
GRD/RIE
1 Oct 03
15 May
15
South Baghdad 1
SP
M (Awaiting parts)
ME
12 Feb 04
TBD
30
South Baghdad 2
SP
M (Awaiting Parts)
ME
12 Feb 04
TBD
30
South Baghdad 3
SP
R
ME
18 Mar 04
18 May
20
Taji 4
CP
M
ME
21 Apr 04
15 JUL
15
Taji 7
CP
R
GRD/RIE
1 Oct 03
15 JUL
15
Taji 6
CP
M
ME
2 Apr 04
26 May
15
LEGEND OF ELECTRICAL SYSTEM POWER SOURCE
SP: STEAM POWER – These plants use either fuel oil or crude in burners CP: COMBUSTION POWER RP: RECIPROCATING POWER HP: HYDRO POWER
Transmission:
LINE
Kv
Fault
Maint.
Org.
Date out-of -service
Est. In-service Date
Comments
Nassiriya-Khor Zubayr
400
Sabotage
Bechtel
26 May
129 towers complete/216req’d Haditha-Baghd West 400 Sabotage GRD/RIE
Loading
246 towers complete/246 req’d Hartha-Qut – Wasit 400 Sabotage GRD/RIE
Complete
23 Apr Operational
Baiji - Baghd West #1
400
Sabotage
GRD/RIE
Complete
Operational
Baghd E.-Baghd S. #2
400
New Line
GRD/RIE
Complete
81 towers complete/81req’d Haditha – Qaim 400 Sabotage GRD-RIE
TBD
No contract awarded
Baiji – Haditha
400
Sabotage
Bechtel
TBD
No contract awarded
Diyala Connection
400
New Line
ME
15 Jun
Dibis/Erbil-Qara Qosh
132
New Line
GRD/RIE
15 May
Contractor mobilized
Dibis to Old Kirkuk
132
Reconductor
GRD-RIE
30 Jun
Bids for work under evaluation Mosul – Mosul East 132 Sabotage ME
TBD
Shuwaiba-Toba-Hamar
132
Sabotage
ME
Complete
44 towers complete/44 req’d Samediya – New Baghdad 132 Reconductor GRD-RIE
15 Jun
Contract Awarded 24 Mar
Jazair to Yarmook
132
Reconductor
GRD-RIE
15 Jun
Contract Awarded 24 Mar
Baghd West – Jamia
132
Sabotage
ME
TBD
Al Amarah-Burzulgan
132
Looting
GRD-RIE
25 Jun
26 towers complete /126 req’d Temim- Tuz 132 Sabotage ME
TBD
Nejibiya – Hartha
132
Sabotage
ME
TBD
Lines Returned to service:
Distribution:
Power transferred from North to Middle 820 MW.
Power transferred from South to Middle -50 MW.
GOVERNORATE
Peak Load MW
MWH
Average Load MW
Demand Load MW
Baghdad
1280
26350
1098
1355
Duhok
80
1890
79
115
Naynawa
325
7519
313
503
Tamim
145
3111
130
196
Salah Aldeen
210
4527
189
246
Anbar
186
4194
175
238
Dyala
80
2041
85
135
Babil
80
2269
95
141
Kirbala
75
1988
83
112
Najaf
89
2264
94
129
Kadsya
40
1299
54
86
Wasit
70
2093
87
116
Muthana
40
1347
56
77
Nasirya
25
1777
74
126
Misan
30
1335
56
84
Basra
265
5728
239
245
Data compiled and reported by:
LTC Tharnell M. Thomas
CENTCOM LNO CPA Ministry of Electricity thomast2orha.centcom.mil Page PAGE 3 of NUMPAGES 3
الرئيسية / الخدمات الأساسية / ESS-23706a16
الخدمات الأساسية
DAILY POWER SYSTEM HIGHLIGHTS FOR APRIL 25, 2004
- التاريخ
- 25 نيسان 2004
- الفئة
- الخدمات الأساسية
- النص متوفر
- الإنكليزية
- عدد الملفات
- 1
تظليل نتائج البحث عن: