# A-Steam Power Stations
REPORT DATE - 20 JANUARY 2004
A - Steam Power Stations
Power Stations Type No. of Units No. of Operating Units Units Load (MW) Total Load MW Target Load Remarks Fuel 1 2 3 4 5 6 MW Dibis Natural Gas 4 2 7 7 14 24 #2 boiler leakage; #3 prog maint Baiji Fuel Oil 6 3 90 105 100 295 500 #2 prog maint; #5 forced outage; #6 prog maint Daura Fuel Oil 4 1 75 75 180 #4 rotor repair; #5 & #6 rehab South Baghdad Fuel Oil 6 2 30 30 60 200 #2 air heater defect; #3 stopped at 1503 flue gas leake; #4 stopped at 1910 boiler leak; #5 prog maint Mussaibe Crude and Fuel Oil 4 4 210 200 100 210 720 860 Nassirya Crude 4 3 130 140 150 420 600 #4 prog maint. 28 DEC to 28 JAN.
Najebia Natural Gas and Crude 2 2 75 85 160 160 Hartha Natural Gas and Crude 4 1 140 140 300 #4 prog maint Out of Service for Unscheduled Maintanence Total: 1884 2824 Out of Service for Program Maintanence/Rehab No activity Not Performing at Peak Performance
# B- Gas_C-Power Stations
Report Date- 20 January 2004 B- Gas Power Stations C -Hydro Power Stations Power Stations No. of Units No. of Operating Units Station Load Target Load Fuel Use Remarks Power Stations No. of Units No. of Operating Units Station Load Target Load Discharge m3/Sec Gas Pressure Baiji 2 1 130 125 Gas Oil #2 lubricating oil leak from bearing Musil Dam Main 4 3 380 600 Quds 2 1 95 160 Gas Oil Musil Dam reg 4 3 36 60 450 Mosil 12 7 113 150 29 #1 rotor defect; #2 servo + ACC; #3 prog maint; #6 diesel; #9 rotor defect Musil Pumping 2 1 110 0 Dibis 3 1 29 30 29 #4 and #5 rehab Haditha Dam 6 2 130 160 250 Old Mulla 12 7 96 128 450 #1 ACC gear, #2 servo, #3 synch at 1618; #6 synch at 1335 c/b; #10 prog maint; #12 rehab Samarra 3 2 33 55 330 New Mulla 6 3 96 173 3 #4 & #5 prog maint; #6 Generator defect Himrin 2 1 23 21 90 Taji 7 4 61 55 18 #3 Compressor; #4 stopped at 1600 temp dif; #7 Rehab Hindia 4 4 5 5 75 M. Taji 2 1 8 18 18 #2 software. Kufa 4 0 Daura 4 3 70 30 18 #3 Rehab Total 717 896 Hilla 4 4 70 64 21 System Generation 79822 MWh Najaf 3 2 95 129 20 #2 prog maint Syrian Line Generation 1471 MWh Khor 4 80 Natural Gas #1 & #2 tripped gas valve prob; #3 prog maint; #4 Rehab Turkey Line Generation 1954 MWh Shuaiba 2 20 Natural Gas #2 tripped at 410 Total Generation 83247 MWh M. Shuaiba 2 Natural Gas System Peak Load 3666 MW Petro 4 1 6 0 Natural Gas Syria Peak Load 60 MW M. Dibis 4 3 12 24 Natural Gas Turkey Peak Load 82 MW Mossil East 5 2 10 0 Gas Oil Fixed Gen Peak Load 127 MW Hmam/Zafranya 7 2 3 Gas Oil Total Peak Load 3935 MW Diesel 32 Gas Oil Baghdad Load 1450 MW Total 926 1186 Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590).
Edited by Electricity Commission U.S. Advisor Staff.
# Peak Loads
Report Date - 20 January 2004 GOVERNORATE Peak Load MW MWH Average Load MW Power transferred from North to Middle 460 MW.
Power transferred from South to Middle 170 MW.
Baghdad 140 28972 1207
Duhok 82 1907 79
Naynawa 380 8640 360
Tamim 160 3654 152
Salah Aldeen 200 4998 208
Anbar 160 4352 181
Dyala 115 2339 97
Babil 130 2603 108
Kirbala 90 1938 81
Najaf 110 2361 98
Kadsya 45 1432 60
Wasit 95 2010 84
Muthana 60 1409 59
Nasirya 100 2592 108
Misan 65 1567 65
Basra 310 7355 306
الرئيسية / الخدمات الأساسية / ESS-1c6b8d44
الخدمات الأساسية
System Status Jan 20
- التاريخ
- 20 كانون الثاني 2004
- الفئة
- الخدمات الأساسية
- النص متوفر
- الإنكليزية
- عدد الملفات
- 1
معاينة الجدول
الورقة «A-Steam Power Stations»: 16 صفاً × 13 عموداً
| REPORT DATE - 20 JANUARY 2004 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| A - Steam Power Stations | ||||||||||||
| Power Stations | Type | No. of Units | No. of Operating Units | Units Load (MW) | Total Load MW | Target Load | Remarks | |||||
| Fuel | 1 | 2 | 3 | 4 | 5 | 6 | MW | |||||
| Dibis | Natural Gas | 4 | 2 | 7 | 7 | 14 | 24 | #2 boiler leakage; #3 prog maint | ||||
| Baiji | Fuel Oil | 6 | 3 | 90 | 105 | 100 | 295 | 500 | #2 prog maint; #5 forced outage; #6 prog maint | |||
| Daura | Fuel Oil | 4 | 1 | 75 | 75 | 180 | #4 rotor repair; #5 & #6 rehab | |||||
| South Baghdad | Fuel Oil | 6 | 2 | 30 | 30 | 60 | 200 | #2 air heater defect; #3 stopped at 1503 flue gas leake; #4 stopped at 1910 boiler leak; #5 prog maint | ||||
| Mussaibe | Crude and Fuel Oil | 4 | 4 | 210 | 200 | 100 | 210 | 720 | 860 | |||
| Nassirya | Crude | 4 | 3 | 130 | 140 | 150 | 420 | 600 | #4 prog maint. 28 DEC to 28 JAN. | |||
| Najebia | Natural Gas and Crude | 2 | 2 | 75 | 85 | 160 | 160 | |||||
| Hartha | Natural Gas and Crude | 4 | 1 | 140 | 140 | 300 | #4 prog maint | |||||
| Out of Service for Unscheduled Maintanence | Total: | 1,884 | 2,824 | |||||||||
| Out of Service for Program Maintanence/Rehab | ||||||||||||
| No activity | ||||||||||||
| Not Performing at Peak Performance |
الورقة «B- Gas_C-Power Stations»: 26 صفاً × 13 عموداً
| Report Date- 20 January 2004 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| B- Gas Power Stations | C -Hydro Power Stations | |||||||||||
| Power Stations | No. of Units | No. of Operating Units | Station Load | Target Load | Fuel Use | Remarks | Power Stations | No. of Units | No. of Operating Units | Station Load | Target Load | Discharge m3/Sec |
| Gas Pressure | ||||||||||||
| Baiji | 2 | 1 | 130 | 125 | Gas Oil | #2 lubricating oil leak from bearing | Musil Dam Main | 4 | 3 | 380 | 600 | |
| Quds | 2 | 1 | 95 | 160 | Gas Oil | Musil Dam reg | 4 | 3 | 36 | 60 | 450 | |
| Mosil | 12 | 7 | 113 | 150 | 29 | #1 rotor defect; #2 servo + ACC; #3 prog maint; #6 diesel; #9 rotor defect | Musil Pumping | 2 | 1 | 110 | 0 | |
| Dibis | 3 | 1 | 29 | 30 | 29 | #4 and #5 rehab | Haditha Dam | 6 | 2 | 130 | 160 | 250 |
| Old Mulla | 12 | 7 | 96 | 128 | 450 | #1 ACC gear, #2 servo, #3 synch at 1618; #6 synch at 1335 c/b; #10 prog maint; #12 rehab | Samarra | 3 | 2 | 33 | 55 | 330 |
| New Mulla | 6 | 3 | 96 | 173 | 3 | #4 & #5 prog maint; #6 Generator defect | Himrin | 2 | 1 | 23 | 21 | 90 |
| Taji | 7 | 4 | 61 | 55 | 18 | #3 Compressor; #4 stopped at 1600 temp dif; #7 Rehab | Hindia | 4 | 4 | 5 | 5 | 75 |
| M. Taji | 2 | 1 | 8 | 18 | 18 | #2 software. | Kufa | 4 | 0 | |||
| Daura | 4 | 3 | 70 | 30 | 18 | #3 Rehab | Total | 717 | 896 | |||
| Hilla | 4 | 4 | 70 | 64 | 21 | System Generation | 79,822 | MWh | ||||
| Najaf | 3 | 2 | 95 | 129 | 20 | #2 prog maint | Syrian Line Generation | 1,471 | MWh | |||
| Khor | 4 | 80 | Natural Gas | #1 & #2 tripped gas valve prob; #3 prog maint; #4 Rehab | Turkey Line Generation | 1,954 | MWh | |||||
| Shuaiba | 2 | 20 | Natural Gas | #2 tripped at 410 | Total Generation | 83,247 | MWh | |||||
| M. Shuaiba | 2 | Natural Gas | System Peak Load | 3,666 | MW | |||||||
| Petro | 4 | 1 | 6 | 0 | Natural Gas | Syria Peak Load | 60 | MW | ||||
| M. Dibis | 4 | 3 | 12 | 24 | Natural Gas | Turkey Peak Load | 82 | MW | ||||
| Mossil East | 5 | 2 | 10 | 0 | Gas Oil | Fixed Gen Peak Load | 127 | MW | ||||
| Hmam/Zafranya | 7 | 2 | 3 | Gas Oil | Total Peak Load | 3,935 | MW | |||||
| Diesel | 32 | Gas Oil | Baghdad Load | 1,450 | MW | |||||||
| Total | 926 | 1,186 | ||||||||||
| Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590). | ||||||||||||
| Edited by Electricity Commission U.S. Advisor Staff. |
الورقة «Peak Loads»: 24 صفاً × 4 أعمدة · المعاينة لأول 21 صفاً؛ الملف الكامل من زر الأصل
| Report Date - 20 January 2004 | |||
|---|---|---|---|
| GOVERNORATE | Peak Load MW | MWH | Average Load MW |
| Power transferred from North to Middle 460 MW. | |||
| Power transferred from South to Middle 170 MW. | |||
| Baghdad | 140 | 28,972 | 1,207 |
| Duhok | 82 | 1,907 | 79 |
| Naynawa | 380 | 8,640 | 360 |
| Tamim | 160 | 3,654 | 152 |
| Salah Aldeen | 200 | 4,998 | 208 |
| Anbar | 160 | 4,352 | 181 |
| Dyala | 115 | 2,339 | 97 |
| Babil | 130 | 2,603 | 108 |
| Kirbala | 90 | 1,938 | 81 |
| Najaf | 110 | 2,361 | 98 |
| Kadsya | 45 | 1,432 | 60 |
| Wasit | 95 | 2,010 | 84 |
| Muthana | 60 | 1,409 | 59 |
| Nasirya | 100 | 2,592 | 108 |
| Misan | 65 | 1,567 | 65 |
| Basra | 310 | 7,355 | 306 |