# A-Steam Power Stations
REPORT DATE -8 DECEMBER 2003
A - Steam Power Stations
Power Stations Type No. of Units No. of Operating Units Units Load (MW) Total Load MW Target Load Remarks Fuel 1 2 3 4 5 6 MW Dibis Natural Gas 4 1 0 0 0 8 8 24 No.1 loss of protection. No. 3 boiler leak. No. 2 FWP.
Baiji Fuel Oil 6 3 100 80 90 0 0 0 270 500 No. 5 rehab. No. 6 mnt 5 DEC to 19 JAN. No. 4 starting.
Dura Fuel Oil 4 1 70 0 0 0 70 180 No. 4 Mnt 10 OCT to 12 DEC. Nos. 5 & 6: Rehabilitation. No. 3 synch 2350.
South Baghdad Fuel Oil 6 4 35 25 30 35 0 0 125 200 No. 6 mnt 11 NOV to 26 DEC. No. 5 mnt 1 DEC to 15 JAN. No. 3 synch 0320.
Mussaibe Crude and Fuel Oil 4 3 210 150 0 200 560 860 No. 3 program mnt 3 NOV to 18 DEC.
Nassirya Crude 4 3 150 150 0 100 400 600 No. 3 mnt 11 NOV to 11 DEC. No. 4 limited to vacuum.
Najebia Natural Gas and Crude 2 1 0 80 80 160 No. 4 mnt 4 NOV to 22 DEC.
Hartha Natural Gas and Crude 4 1 150 0 150 300 No. 4 Mnt from 23 OCT to 23 DEC.
Total: 1663 2824
# B- Gas_C-Power Stations
Report Date- 8 DECEMBER 2003 B- Gas Power Stations C -Hydro Power Stations Power Stations No. of Units No. of Operating Units Station Load Target Load Fuel Use Remarks Power Stations No. of Units No. of Operating Units Station Load Target Load Discharge m3/Sec Gas Pressure Baiji 2 1 120 125 Gas Oil No. 2 lube oil leak. Musil Dam Main 4 2 250 600 Quds 2 1 110 160 Gas Oil 49 trucks. No. 1 synch 1220. Musil Dam reg 4 3 25 60 450 Mosil 12 8 130 150 27 No. 1 rotor defect. No. 2 ACC. No. 8 program mnt. No. 3 control cards. Musil Pumping 2 0 0 0 Dibis 3 0 0 60 27 No. 4, 5& 6 rehab. Haditha Dam 6 2 100 160 350 Old Mulla 12 7 106 128 24 No. 1 gas control. No. 2 servo and C/B. No. 5 Programmed Mnt. No. 12 rehab. No. 6 tripped at 1920 HET. Samarra 3 2 40 55 0 New Mulla 6 4 125 173 29 No. 6 Generator Defective. No. 3 Mnt. Himrin 2 1 18 21 75 Taji 7 2 38 55 20 No. 5 clutch. No.7 Rehabilitation. No. 2 mnt. No. 4 generator look out. No. 3 tripped 2300 servo valve. Hindia 4 4 5 5 100 M. Taji 2 0 0 20 N/A No. 1 and 2 software. Kufa 4 0 0 1 0 Dura 4 3 75 30 16 No.3 Rehabilitation. Total 438 896 Hilla 4 4 65 64 23 System Generation 71279 MWh Najaf 3 2 95 129 22 No. 2 program mnt. Syrian Line Generation 1309 MWh Khor 4 3 95 80 Natural Gas No. 4: Rehabilitation. Turkey Line Generation 0 MWh Shuaiba 2 1 10 20 Natural Gas No. 1 S/B. Total Generation 72588 MWh Petro 4 0 0 0 Natural Gas System Peak Load 3403 MW M. Dibis 4 0 0 24 Natural Gas Syria Peak Load 60 MW Mossil East 5 0 0 15 Gas Oil Turkey Peak Load 0 MW Hmam 2 0 0 Gas Oil Fixed Gen Peak Load 77 MW Total Peak Load 3540 MW Total 969 1233 Baghdad Load 1200 MW Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590).
Edited by Electricity Commission U.S. Advisor Staff.
# Peak Loads
GOVERNORATE Peak Load MW MWH Average Load MW 8 DECEMBER, 2003 Baghdad 1200 25404 1058.5 Power transferred from North to Middle 730 MW.
Duhok 60 664 27.6667
Naynawa 280 6859 285.7917 Power transferred from South to Middle 200 MW.
Tamim 120 3086 128.5833
Salah Aldeen 200 4498 187.4167 Anbar 70 3821 159.2083 Dyala 85 1589 66.2083 Babil 95 2103 87.625 Kirbala 65 1569 65.375 Najaf 100 1707 71.125 Kadsya 60 1253 52.2083 Wasit 85 1877 78.2083 Muthana 60 1327 55.2917 Nasirya 125 2633 109.7083 Misan 60 1325 55.2083 Basra 290 6551 272.9583 2955
الرئيسية / الخدمات الأساسية / ESS-1b640585
الخدمات الأساسية
Power System 9 dec
- التاريخ
- 9 كانون الأول 2003
- الفئة
- الخدمات الأساسية
- النص متوفر
- الإنكليزية
- عدد الملفات
- 1
معاينة الجدول
الورقة «A-Steam Power Stations»: 13 صفاً × 13 عموداً
| REPORT DATE -8 DECEMBER 2003 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| A - Steam Power Stations | ||||||||||||
| Power Stations | Type | No. of Units | No. of Operating Units | Units Load (MW) | Total Load MW | Target Load | Remarks | |||||
| Fuel | 1 | 2 | 3 | 4 | 5 | 6 | MW | |||||
| Dibis | Natural Gas | 4 | 1 | 0 | 0 | 0 | 8 | 8 | 24 | No.1 loss of protection. No. 3 boiler leak. No. 2 FWP. | ||
| Baiji | Fuel Oil | 6 | 3 | 100 | 80 | 90 | 0 | 0 | 0 | 270 | 500 | No. 5 rehab. No. 6 mnt 5 DEC to 19 JAN. No. 4 starting. |
| Dura | Fuel Oil | 4 | 1 | 70 | 0 | 0 | 0 | 70 | 180 | No. 4 Mnt 10 OCT to 12 DEC. Nos. 5 & 6: Rehabilitation. No. 3 synch 2350. | ||
| South Baghdad | Fuel Oil | 6 | 4 | 35 | 25 | 30 | 35 | 0 | 0 | 125 | 200 | No. 6 mnt 11 NOV to 26 DEC. No. 5 mnt 1 DEC to 15 JAN. No. 3 synch 0320. |
| Mussaibe | Crude and Fuel Oil | 4 | 3 | 210 | 150 | 0 | 200 | 560 | 860 | No. 3 program mnt 3 NOV to 18 DEC. | ||
| Nassirya | Crude | 4 | 3 | 150 | 150 | 0 | 100 | 400 | 600 | No. 3 mnt 11 NOV to 11 DEC. No. 4 limited to vacuum. | ||
| Najebia | Natural Gas and Crude | 2 | 1 | 0 | 80 | 80 | 160 | No. 4 mnt 4 NOV to 22 DEC. | ||||
| Hartha | Natural Gas and Crude | 4 | 1 | 150 | 0 | 150 | 300 | No. 4 Mnt from 23 OCT to 23 DEC. | ||||
| Total: | 1,663 | 2,824 |
الورقة «B- Gas_C-Power Stations»: 25 صفاً × 13 عموداً
| Report Date- 8 DECEMBER 2003 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| B- Gas Power Stations | C -Hydro Power Stations | |||||||||||
| Power Stations | No. of Units | No. of Operating Units | Station Load | Target Load | Fuel Use | Remarks | Power Stations | No. of Units | No. of Operating Units | Station Load | Target Load | Discharge m3/Sec |
| Gas Pressure | ||||||||||||
| Baiji | 2 | 1 | 120 | 125 | Gas Oil | No. 2 lube oil leak. | Musil Dam Main | 4 | 2 | 250 | 600 | |
| Quds | 2 | 1 | 110 | 160 | Gas Oil | 49 trucks. No. 1 synch 1220. | Musil Dam reg | 4 | 3 | 25 | 60 | 450 |
| Mosil | 12 | 8 | 130 | 150 | 27 | No. 1 rotor defect. No. 2 ACC. No. 8 program mnt. No. 3 control cards. | Musil Pumping | 2 | 0 | 0 | 0 | |
| Dibis | 3 | 0 | 0 | 60 | 27 | No. 4, 5& 6 rehab. | Haditha Dam | 6 | 2 | 100 | 160 | 350 |
| Old Mulla | 12 | 7 | 106 | 128 | 24 | No. 1 gas control. No. 2 servo and C/B. No. 5 Programmed Mnt. No. 12 rehab. No. 6 tripped at 1920 HET. | Samarra | 3 | 2 | 40 | 55 | 0 |
| New Mulla | 6 | 4 | 125 | 173 | 29 | No. 6 Generator Defective. No. 3 Mnt. | Himrin | 2 | 1 | 18 | 21 | 75 |
| Taji | 7 | 2 | 38 | 55 | 20 | No. 5 clutch. No.7 Rehabilitation. No. 2 mnt. No. 4 generator look out. No. 3 tripped 2300 servo valve. | Hindia | 4 | 4 | 5 | 5 | 100 |
| M. Taji | 2 | 0 | 0 | 20 | N/A | No. 1 and 2 software. | Kufa | 4 | 0 | 0 | 1 | 0 |
| Dura | 4 | 3 | 75 | 30 | 16 | No.3 Rehabilitation. | Total | 438 | 896 | |||
| Hilla | 4 | 4 | 65 | 64 | 23 | System Generation | 71,279 | MWh | ||||
| Najaf | 3 | 2 | 95 | 129 | 22 | No. 2 program mnt. | Syrian Line Generation | 1,309 | MWh | |||
| Khor | 4 | 3 | 95 | 80 | Natural Gas | No. 4: Rehabilitation. | Turkey Line Generation | 0 | MWh | |||
| Shuaiba | 2 | 1 | 10 | 20 | Natural Gas | No. 1 S/B. | Total Generation | 72,588 | MWh | |||
| Petro | 4 | 0 | 0 | 0 | Natural Gas | System Peak Load | 3,403 | MW | ||||
| M. Dibis | 4 | 0 | 0 | 24 | Natural Gas | Syria Peak Load | 60 | MW | ||||
| Mossil East | 5 | 0 | 0 | 15 | Gas Oil | Turkey Peak Load | 0 | MW | ||||
| Hmam | 2 | 0 | 0 | Gas Oil | Fixed Gen Peak Load | 77 | MW | |||||
| Total Peak Load | 3,540 | MW | ||||||||||
| Total | 969 | 1,233 | Baghdad Load | 1,200 | MW | |||||||
| Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590). | ||||||||||||
| Edited by Electricity Commission U.S. Advisor Staff. |
الورقة «Peak Loads»: 21 صفاً × 5 أعمدة · المعاينة لأول 19 صفاً؛ الملف الكامل من زر الأصل
| GOVERNORATE | Peak Load MW | MWH | Average Load MW | 8 DECEMBER, 2003 |
|---|---|---|---|---|
| Baghdad | 1,200 | 25,404 | 1,058.50 | Power transferred from North to Middle 730 MW. |
| Duhok | 60 | 664 | 27.67 | |
| Naynawa | 280 | 6,859 | 285.79 | Power transferred from South to Middle 200 MW. |
| Tamim | 120 | 3,086 | 128.58 | |
| Salah Aldeen | 200 | 4,498 | 187.42 | |
| Anbar | 70 | 3,821 | 159.21 | |
| Dyala | 85 | 1,589 | 66.21 | |
| Babil | 95 | 2,103 | 87.62 | |
| Kirbala | 65 | 1,569 | 65.38 | |
| Najaf | 100 | 1,707 | 71.12 | |
| Kadsya | 60 | 1,253 | 52.21 | |
| Wasit | 85 | 1,877 | 78.21 | |
| Muthana | 60 | 1,327 | 55.29 | |
| Nasirya | 125 | 2,633 | 109.71 | |
| Misan | 60 | 1,325 | 55.21 | |
| Basra | 290 | 6,551 | 272.96 | |
| 2,955 |
تظليل نتائج البحث عن: