DAILY POWER SYSTEM HIGHLIGHTS FOR APRIL 29, 2004
The CPA Electricity Advisor issues this report to note significant events or conditions of interest in the power sector. The basic daily data on the power system is available on the CPA web site.
HIGHLIGHTS: Starting to see the increase in generation as units return from maintenance.
Generation:
Peak Power 4282Mw, 82,678Mw hours, 7-day Avg. 4037Mw Generators Returned to Service: (2) 45 Mw Dibis 5, CP 30 Mw Shuaiba 2 15 Mw
Generators Unscheduled Out of Service (12) 200 Mw PLANT
Type
SP, CP, RP, HP
Fault
Mw
Baiji Mobile, 4
CP
Fuel Filters
25
Doura 1,2
CP
No gas pressure
40
Mosil 1
CP
Rotor Defect
15
Mosil 2
CP
Load Gear Oil leak
15
Mosil 9
CP
Rotor Defect
15
Old Mulla 7
CP
High exhaust temp
15
Taji 1,2
CP
No gas pressure
30
Taji 3,
CP
Compressor
15
Taji 5
CP
High Exhaust Temp
15
M. Taji 2
CP
Software
15
RED – Denotes out of service since last report
Generators Scheduled Out of Service (30) 1437 Mw PLANT
Type
SP/NG
Prog. Maintenance(M) / Rehab (R) Maint.
Org.
Date out-of -service
Est. In-service Date
Mw
Baiji 1
SP
M
ME
21 Mar 04
21 May
100
Baiji 2
SP
M
ME
26 Apr 04
30 Apr
95
Baiji 3
SP
M
Bechtel
29 Feb 04
1 May
100
Dibis 1
SP
M
ME
26 Apr 04
1 May
8
Dibis 2
SP
M
ME
26 Apr 04
1 May
8
Dibis 3
SP
M
ME
26 Apr 04
1 May
8
Dibis 4
SP
M
ME
15 Mar 04
30 Apr
8
Doura 4
CP
M
ME
14 Apr 04
31 May
20
Doura 3
CP
R
ME
1 Mar 03
TBD
20
Doura 3
SP
M
ME
18 Mar 04
18 May
65
Doura 4
SP
M
ME
2 Feb 04
30 Apr
65
Doura 5
SP
R
Bechtel
Jul 03
20 Jun
100
Doura 6
SP
R
Bechtel
Jul 03
20 Jul
100
Dibis 4
CP
R
GRD/RIE
Sep 03
12 May
30
Hartha 1
SP
M
ME
22 Mar 04
23 May
100
Khor Zubayr 2
CP
R
GRD/RIE
15 Mar 04
3 Jul
50
Mosil 7
CP
M
ME
24 Apr 04
TBD
15
Mussaibe 2
SP
M (additional work)
ME
28 Feb 04
15 May
200
Nassirya 1
SP
M
ME
30 Mar 04
15 May
130
New Mulla 6
CP
R
GRD/RIE
28 Mar 04
15 May
30
Old Mulla 1
CP
M
ME
17 Apr 04
15 May
15
Old Mulla 2
CP
M
ME
17 Apr 04
15 May
15
Old Mulla 8
CP
M
ME
17 Apr 04
TBD
15
Old Mulla 12
CP
R
GRD/RIE
1 Oct 03
15 May
15
South Baghdad 1
SP
M (Awaiting parts)
ME
12 Feb 04
TBD
30
South Baghdad 2
SP
M (Awaiting Parts)
ME
12 Feb 04
TBD
30
South Baghdad 3
SP
R
ME
18 Mar 04
18 May
20
Taji 4
CP
M
ME
21 Apr 04
15 JUL
15
Taji 7
CP
R
GRD/RIE
1 Oct 03
15 JUL
15
Taji 6
CP
M
ME
2 Apr 04
26 May
15
New In-service date
LEGEND OF ELECTRICAL SYSTEM POWER SOURCE
SP: STEAM POWER – These plants use either fuel oil or crude in burners CP: COMBUSTION POWER RP: RECIPROCATING POWER HP: HYDRO POWER
Transmission:
LINE
Kv
Fault
Maint.
Org.
Date out-of -service
Est. In-service Date
Comments
Nassiriya-Khor Zubayr
400
Sabotage
Bechtel
26 May
129 towers complete/216req’d Haditha-Baghd West 400 Sabotage GRD/RIE
Complete
246 towers complete/246 req’d Hartha-Qut – Wasit 400 Sabotage GRD/RIE
Complete
23 Apr Operational
Baiji - Baghd West #1
400
Sabotage
GRD/RIE
Complete
Operational
Baghd E.-Baghd S. #2
400
New Line
GRD/RIE
Complete
81 towers complete/81req’d Haditha – Qaim 400 Sabotage GRD-RIE
TBD
No contract awarded
Baiji – Haditha
400
Sabotage
Bechtel
TBD
No contract awarded
Diyala Connection
400
New Line
ME
15 Jun
Dibis/Erbil-Qara Qosh
132
New Line
GRD/RIE
15 May
Construction ongoing
Dibis to Old Kirkuk
132
Reconductor
GRD-RIE
30 Jun
Bids for work under evaluation Mosul – Mosul East 132 Sabotage ME
TBD
Shuwaiba-Toba-Hamar
132
Sabotage
ME
Complete
44 towers complete/44 req’d Samediya – New Baghdad 132 Reconductor GRD-RIE
5 Jul
Assessment underway
Jazair to Yarmook
132
Reconductor
GRD-RIE
1 Jul
Assessment underway
Baghd West – Jamia
132
Sabotage
ME
TBD
Old Amarah-Burzulgan
132
Looting
GRD-RIE
25 Jun
Assessment underway
Temim- Tuz
132
Sabotage
ME
TBD
Nejibiya – Hartha
132
Sabotage
ME
TBD
Lines Returned to service:
Distribution:
Power transferred from North to Middle 940 MW.
Power transferred from South to Middle 250 MW.
GOVERNORATE
Peak Load MW
MWH
Average Load MW
Demand Load MW
Baghdad
1500
29363
1223
1409
Duhok
80
1937
81
107
Naynawa
350
7709
321
491
Tamim
145
3091
129
179
Salah Aldeen
224
4868
203
248
Anbar
225
4433
185
227
Dyala
110
2292
96
133
Babil
125
2545
106
136
Kirbala
95
2078
87
107
Najaf
120
2440
102
126
Kadsya
65
2110
88
117
Wasit
100
2451
60
82
Muthana
70
1425
59
74
Nasirya
125
2636
110
124
Misan
70
1483
62
76
Basra
300
6979
291
296
Data compiled and reported by:
LTC Tharnell M. Thomas
CENTCOM LNO CPA Ministry of Electricity thomast2orha.centcom.mil Page PAGE 1 of NUMPAGES 3
الرئيسية / الخدمات الأساسية / ESS-1a31a802
الخدمات الأساسية
DAILY POWER SYSTEM HIGHLIGHTS FOR APRIL 29, 2004
- التاريخ
- 29 نيسان 2004
- الفئة
- الخدمات الأساسية
- النص متوفر
- الإنكليزية
- عدد الملفات
- 1
تظليل نتائج البحث عن: