الورقة «A-Steam Power Stations»: 16 صفاً × 13 عموداً

Reporting Peak for 24 APRIL 2004 / Report Date - 25 APRIL 2004
A - Steam Power Stations
Power StationsType FuelNo. of UnitsNo. of Operating UnitsUnits Load (MW)Total Load MWTarget Load MWRemarks
123456
DibisNatural Gas418824#2 stopped at 1259 speed gov; #3 gen earth; #4 prog maint
BaijiFuel Oil639090100280500#1, 3 prog maint; #5 forced outage
DauraFuel Oil40180#3, #4 prog maint; #5, #6 rehab
South BaghdadFuel Oil62303060200#1, #2, #3 prog maint; #5 stopped at 247 BL; #6 synch at 1010
MussaibeCrude and Fuel Oil43200200180580860#2 prog maint
NassiryaCrude41100100600#1 prog maint; #2 stopped at 1805 station shut down; #3 synch at 0047; #4 stopped at 1855 gen damage
NajebiaNatural Gas and Crude217070160#5 starting
HarthaNatural Gas and Crude419090300#1 prog maint
Out of Service for Unscheduled MaintanenceTotal:1,1882,824
Out of Service for Program Maintanence/Rehab
No activity
Not Performing at Peak Performance
# A-Steam Power Stations Reporting Peak for 24 APRIL 2004 / Report Date - 25 APRIL 2004 A - Steam Power Stations Power Stations Type Fuel No. of Units No. of Operating Units Units Load (MW) Total Load MW Target Load MW Remarks 1 2 3 4 5 6 Dibis Natural Gas 4 1 8 8 24 #2 stopped at 1259 speed gov; #3 gen earth; #4 prog maint Baiji Fuel Oil 6 3 90 90 100 280 500 #1, 3 prog maint; #5 forced outage Daura Fuel Oil 4 0 180 #3, #4 prog maint; #5, #6 rehab South Baghdad Fuel Oil 6 2 30 30 60 200 #1, #2, #3 prog maint; #5 stopped at 247 BL; #6 synch at 1010 Mussaibe Crude and Fuel Oil 4 3 200 200 180 580 860 #2 prog maint Nassirya Crude 4 1 100 100 600 #1 prog maint; #2 stopped at 1805 station shut down; #3 synch at 0047; #4 stopped at 1855 gen damage Najebia Natural Gas and Crude 2 1 70 70 160 #5 starting Hartha Natural Gas and Crude 4 1 90 90 300 #1 prog maint Out of Service for Unscheduled Maintanence Total: 1188 2824 Out of Service for Program Maintanence/Rehab No activity Not Performing at Peak Performance # B- Gas_C-Power Stations Reporting Peak for 24 APRIL 2004 / Report Date - 25 APRIL 2004 B- Gas Power Stations C -Hydro Power Stations Power Stations No. of Units No. of Operating Units Station Load Target Load Fuel Use Remarks Power Stations No. of Units No. of Operating Units Station Load Target Load Discharge m3/Sec Gas Pressure Baiji 2 1 95 125 Gas Oil #2 C Ch test Musil Dam Main 4 4 600 600 M. Baiji 8 3 70 Gas Oil Musil Dam reg 4 3 35 60 350 Quds 2 1 100 160 Gas Oil 29 trucks - #2 stopped at 1800 bearing prob Musil Pumping 2 1 110 0 Mosil 12 7 115 150 31 #1, #2 TF No. Excit; #7 prog maint; #8 synch at 1625; #9 TF No Excit Haditha Dam 6 4 240 160 500 Dibis 3 2 45 30 30 #4 TF Samarra 3 3 55 55 560 Old Mulla 12 6 95 128 480 #1, #2 TF; #8 prog maint; #9 stopped at 2044 Aut vol reg Himrin 2 2 35 21 135 New Mulla 6 4 130 173 3.2 #4 oil sys prob; #6 TF Hindia 4 4 5 5 135 Taji 7 55 7 #1, #2 NGPL; #3 TF; #4 NGPL; #5 HET; #6 prog maint Kufa 4 2 1 0 60 M. Taji 2 18 Gas Oil #2 software Total 1081 896 Daura 4 30 6 #1, #2 NGPL; #3 needs rehab; #4 prog maint System Generation 67227 MWh Hilla 4 4 68 64 23 #5 synch at 1400 til 2200 Syrian Line Generation 1100 MWh Najaf 3 3 125 129 22 Turkey Line Generation 1929 MWh Khor 4 2 65 80 Natural Gas #2 prog maint; #4 starting Total Generation 75693 MWh Shuaiba 2 20 Natural Gas #1 starting; #2 vib System Peak Load 3076 MW M. Shuaiba 2 1 10 Natural Gas Syria Peak Load 60 MW Petro 4 3 9 0 Natural Gas #2 synch at 1145 Turkey Peak Load 80 MW M. Dibis 4 3 16 24 Natural Gas Fixed Gen Peak Load 266 MW Mossil East 5 1 2 0 Gas Oil Total Peak Load 3482 MW Hmam/Zafranya 7 50 Gas Oil Baghdad Load 1280 MW Diesel Gas Oil Total 995 1186 Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590). Edited by Electricity Commission U.S. Advisor Staff. # Peak Loads Reporting Peak for 24 APRIL 2004 / Report Date - 25 APRIL 2004 Power transferred from North to Middle 820 MW. Power transferred from South to Middle 50 MW. GOVERNORATE Peak Load MW MWH Average Load MW Demand Load MW Baghdad 1280 26350 1098 1355 Duhok 80 1890 79 115 Naynawa 325 7519 313 503 Tamim 145 3111 130 196 Salah Aldeen 210 4527 189 246 Anbar 186 4194 175 238 Dyala 80 2041 85 135 Babil 80 2269 95 141 Kirbala 75 1988 83 112 Najaf 89 2264 94 129 Kadsya 40 1299 54 86 Wasit 70 2093 87 116 Muthana 40 1347 56 77 Nasirya 25 1777 74 126 Misan 30 1335 56 84 Basra 265 5728 239 245