Item
Description
Quantities
Unit
Unit Rate
($US)
Total
Mobilization/Demobilization 1 L.S.
Installation of 3.3KV switchgear 2 Ea
Installation of 3.3 KV MCCs 2 Ea
Installation of 400VMCCs
25
Ea
Installation of 400V Power. Dist. Panels.
8
Ea
Installation of MIMIC panels 2 Ea
Installation of 3.3KV cable 1000 L.M.
Terminate 3.3KV cable
100
Ea
Installation of 400V power/control cable 30000 L.M.
Terminate 400V power/control cable 10000 Ea
Supply conduit for power/control/lighting/receptacles 10000 L.M.
Install conduit for power/control/lighting/receptacles 10000 L.M.
Supply remote control stations 225 Ea
Install remote control stations 225 Ea
Supply remote starters (including electrolyte starters) 55 Ea
Install remote starters (including electrolyte starters) 55 Ea
Install grounding/bonding/lightning cable 1500 L.M.
Terminate grounding/bonding/lightning cable 2500 Ea
Install cable trench
2000
L.M.
Supply 400V lighting panels 16 Ea
Install 400V lighting panels 16 Ea
Supply interior building lights 765 Ea
Install interior building lights 765 Ea
Supply lighting cable/receptacle cable (including street lighting) 35000 L.M.
Install lighting/receptacle cable (including street lighting) 35000 L.M.
Supply electrosonic water level control system 11 Ea
Terminate and test ultrasonic water level control system 11 Ea
Supply cable, internal wires, fuses, lighting fixture of (250) watt mercury lamps 100
Ea
Remove existing install and test (10 m.) external street lighting poles, the work shall include installing cable, internal wires, fuses, lighting fixture of (250) watt mercury lamps and painting.
100
Ea
Supply 10 meter light poles 100 Ea.
Supply projector lighting fittings (1000 w) sodium type with movable base for above towers (16 No. for each tower) 192 Ea
Install, connect and test projector lighting fittings (1000 w) sodium type with movable base for above towers (16 No. for each tower) 192 Ea
Supply street light control units (box, photo eye, contactor, HOA switch) 20 Ea
Install street light control units (box, photo eye, contactor, HOA switch) 20 Ea
Supply one floor mounted 25 ton AC unit for Administration Building/Power House, including outdoor concrete pad 1 Ea.
Install one (1) floor mounted 25 ton AC unit for Administration Building/Power House including outdoor concrete pad 1 Ea
الرئيسية / العقود والمناقصات / BUS-714ae8db
العقود والمناقصات
Installation of 3.3KV switchgear
- التاريخ
- غير معروف
- الفئة
- العقود والمناقصات
- النص متوفر
- الإنكليزية
- عدد الملفات
- 2
تظليل نتائج البحث عن: