# A-Steam Power Stations
Report Date - 11 FEBRUARY 2004 A - Steam Power Stations Power Stations Type Fuel No. of Units No. of Operating Units Units Load (MW) Total Load MW Target Load MW Remarks 1 2 3 4 5 6 Dibis Natural Gas 4 2 8 8 16 24 #2 boiler leakage; #3 prog maint Baiji Fuel Oil 6 3 85 90 100 275 500 #1 boiler leakage; #2 prog maint; #5 forced outage; #6 synch at 1030 Daura Fuel Oil 4 0 180 #3 boiler leakage#4 rotor repair; #5 & #6 rehab South Baghdad Fuel Oil 6 3 20 30 30 80 200 #1 h.o.leakage; #2 air heater defect; #5 synch at 1810; #6 boiler leakage Mussaibe Crude and Fuel Oil 4 3 200 200 200 600 860 #4 prog maint Nassirya Crude 4 4 130 160 170 150 610 600 Najebia Natural Gas and Crude 2 2 75 90 165 160 Hartha Natural Gas and Crude 4 1 140 140 300 #4 prog maint Out of Service for Unscheduled Maintanence Total: 1886 2824 Out of Service for Program Maintanence/Rehab No activity Not Performing at Peak Performance
# B- Gas_C-Power Stations
Report Date - 11 FEBRUARY 2004 B- Gas Power Stations C -Hydro Power Stations Power Stations No. of Units No. of Operating Units Station Load Target Load Fuel Use Remarks Power Stations No. of Units No. of Operating Units Station Load Target Load Discharge m3/Sec Gas Pressure Baiji 2 1 125 125 Gas Oil #2 lub oil leak from bearing Musil Dam Main 4 4 570 600 Quds 2 2 100 160 Gas Oil 25 trucks Musil Dam reg 4 4 36 60 1000 Mosil 12 9 140 150 16 #1 rotor defec; #3 stopped 615 test; #9 rotor defect Musil Pumping 2 1 110 0 Dibis 3 2 58 30 28 #4 rehab Haditha Dam 6 2 130 160 250 Old Mulla 12 7 95 128 450 #1 acc. Gear; #2 servo; #5 prog maint; #10 prog maint; #12 needs rehab Samarra 3 2 42 55 420 New Mulla 6 3 100 173 2.9 #1 prog maint; #4 servo; #6 generator defect Himrin 2 2 35 21 130 Taji 7 5 70 55 16 #3 compressor; #7 needs rehab Hindia 4 4 6 5 110 M. Taji 2 1 7 18 16 #2 software Kufa 4 3 1 0 30 Daura 4 3 65 30 15 #3 needs rehab Total 930 896 Hilla 4 64 35 All untis stopped to install new trans. System Generation 85033 MWh Najaf 3 2 95 129 33 #2 prog maint Syrian Line Generation 1441 MWh Khor 4 3 120 80 Natural Gas #4 rehab Turkey Line Generation 2015 MWh Shuaiba 2 1 5 20 Natural Gas #2 s/b Total Generation 93916 MWh M. Shuaiba 2 Natural Gas split with the refinery System Peak Load 3824 MW Petro 4 0 Natural Gas Syria Peak Load 60 MW M. Dibis 4 3 9 24 Natural Gas Turkey Peak Load 80 MW Mossil East 5 3 16 0 Gas Oil Fixed Gen Peak Load 266 MW Hmam/Zafranya 7 2 6 Gas Oil Total Peak Load 4230 MW Diesel 33 Gas Oil Baghdad Load 1500 MW Total 1044 1186 Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590).
Edited by Electricity Commission U.S. Advisor Staff.
# Peak Loads
Report Date - 11 FEBRUARY 2004 GOVERNORATE Peak Load MW MWH Average Load MW Power transferred from North to Middle 750 MW.
Power transferred from South to Middle 220 MW.
Baghdad 1500 32117 1338
Duhok 80 1935 81
Naynawa 375 9018 376
Tamim 165 3816 159
Salah Aldeen 190 4901 204
Anbar 155 4292 179
Dyala 92 2409 100
Babil 110 2574 107
Kirbala 127 2809 117
Najaf 135 3208 134
Kadsya 50 1449 60
Wasit 105 2423 101
Muthana 55 1356 57
Nasirya 135 2827 118
Misan 60 1303 54
Basra 335 7800 325
Home / Essential Services / ESS-ea376bfc
Essential Services
System Status Feb 11
- Date
- 11 February 2004
- Category
- Essential Services
- Text available
- English
- Files
- 1
Spreadsheet preview
Sheet “A-Steam Power Stations”: 16 rows × 13 columns
| Report Date - 11 FEBRUARY 2004 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| A - Steam Power Stations | ||||||||||||
| Power Stations | Type Fuel | No. of Units | No. of Operating Units | Units Load (MW) | Total Load MW | Target Load MW | Remarks | |||||
| 1 | 2 | 3 | 4 | 5 | 6 | |||||||
| Dibis | Natural Gas | 4 | 2 | 8 | 8 | 16 | 24 | #2 boiler leakage; #3 prog maint | ||||
| Baiji | Fuel Oil | 6 | 3 | 85 | 90 | 100 | 275 | 500 | #1 boiler leakage; #2 prog maint; #5 forced outage; #6 synch at 1030 | |||
| Daura | Fuel Oil | 4 | 0 | 180 | #3 boiler leakage#4 rotor repair; #5 & #6 rehab | |||||||
| South Baghdad | Fuel Oil | 6 | 3 | 20 | 30 | 30 | 80 | 200 | #1 h.o.leakage; #2 air heater defect; #5 synch at 1810; #6 boiler leakage | |||
| Mussaibe | Crude and Fuel Oil | 4 | 3 | 200 | 200 | 200 | 600 | 860 | #4 prog maint | |||
| Nassirya | Crude | 4 | 4 | 130 | 160 | 170 | 150 | 610 | 600 | |||
| Najebia | Natural Gas and Crude | 2 | 2 | 75 | 90 | 165 | 160 | |||||
| Hartha | Natural Gas and Crude | 4 | 1 | 140 | 140 | 300 | #4 prog maint | |||||
| Out of Service for Unscheduled Maintanence | Total: | 1,886 | 2,824 | |||||||||
| Out of Service for Program Maintanence/Rehab | ||||||||||||
| No activity | ||||||||||||
| Not Performing at Peak Performance |
Sheet “B- Gas_C-Power Stations”: 26 rows × 13 columns
| Report Date - 11 FEBRUARY 2004 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| B- Gas Power Stations | C -Hydro Power Stations | |||||||||||
| Power Stations | No. of Units | No. of Operating Units | Station Load | Target Load | Fuel Use | Remarks | Power Stations | No. of Units | No. of Operating Units | Station Load | Target Load | Discharge m3/Sec |
| Gas Pressure | ||||||||||||
| Baiji | 2 | 1 | 125 | 125 | Gas Oil | #2 lub oil leak from bearing | Musil Dam Main | 4 | 4 | 570 | 600 | |
| Quds | 2 | 2 | 100 | 160 | Gas Oil | 25 trucks | Musil Dam reg | 4 | 4 | 36 | 60 | 1,000 |
| Mosil | 12 | 9 | 140 | 150 | 16 | #1 rotor defec; #3 stopped 615 test; #9 rotor defect | Musil Pumping | 2 | 1 | 110 | 0 | |
| Dibis | 3 | 2 | 58 | 30 | 28 | #4 rehab | Haditha Dam | 6 | 2 | 130 | 160 | 250 |
| Old Mulla | 12 | 7 | 95 | 128 | 450 | #1 acc. Gear; #2 servo; #5 prog maint; #10 prog maint; #12 needs rehab | Samarra | 3 | 2 | 42 | 55 | 420 |
| New Mulla | 6 | 3 | 100 | 173 | 2.90 | #1 prog maint; #4 servo; #6 generator defect | Himrin | 2 | 2 | 35 | 21 | 130 |
| Taji | 7 | 5 | 70 | 55 | 16 | #3 compressor; #7 needs rehab | Hindia | 4 | 4 | 6 | 5 | 110 |
| M. Taji | 2 | 1 | 7 | 18 | 16 | #2 software | Kufa | 4 | 3 | 1 | 0 | 30 |
| Daura | 4 | 3 | 65 | 30 | 15 | #3 needs rehab | Total | 930 | 896 | |||
| Hilla | 4 | 64 | 35 | All untis stopped to install new trans. | System Generation | 85,033 | MWh | |||||
| Najaf | 3 | 2 | 95 | 129 | 33 | #2 prog maint | Syrian Line Generation | 1,441 | MWh | |||
| Khor | 4 | 3 | 120 | 80 | Natural Gas | #4 rehab | Turkey Line Generation | 2,015 | MWh | |||
| Shuaiba | 2 | 1 | 5 | 20 | Natural Gas | #2 s/b | Total Generation | 93,916 | MWh | |||
| M. Shuaiba | 2 | Natural Gas | split with the refinery | System Peak Load | 3,824 | MW | ||||||
| Petro | 4 | 0 | Natural Gas | Syria Peak Load | 60 | MW | ||||||
| M. Dibis | 4 | 3 | 9 | 24 | Natural Gas | Turkey Peak Load | 80 | MW | ||||
| Mossil East | 5 | 3 | 16 | 0 | Gas Oil | Fixed Gen Peak Load | 266 | MW | ||||
| Hmam/Zafranya | 7 | 2 | 6 | Gas Oil | Total Peak Load | 4,230 | MW | |||||
| Diesel | 33 | Gas Oil | Baghdad Load | 1,500 | MW | |||||||
| Total | 1,044 | 1,186 | ||||||||||
| Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590). | ||||||||||||
| Edited by Electricity Commission U.S. Advisor Staff. |
Sheet “Peak Loads”: 24 rows × 4 columns · preview of the first 21 rows; full file from the original button
| Report Date - 11 FEBRUARY 2004 | |||
|---|---|---|---|
| GOVERNORATE | Peak Load MW | MWH | Average Load MW |
| Power transferred from North to Middle 750 MW. | |||
| Power transferred from South to Middle 220 MW. | |||
| Baghdad | 1,500 | 32,117 | 1,338 |
| Duhok | 80 | 1,935 | 81 |
| Naynawa | 375 | 9,018 | 376 |
| Tamim | 165 | 3,816 | 159 |
| Salah Aldeen | 190 | 4,901 | 204 |
| Anbar | 155 | 4,292 | 179 |
| Dyala | 92 | 2,409 | 100 |
| Babil | 110 | 2,574 | 107 |
| Kirbala | 127 | 2,809 | 117 |
| Najaf | 135 | 3,208 | 134 |
| Kadsya | 50 | 1,449 | 60 |
| Wasit | 105 | 2,423 | 101 |
| Muthana | 55 | 1,356 | 57 |
| Nasirya | 135 | 2,827 | 118 |
| Misan | 60 | 1,303 | 54 |
| Basra | 335 | 7,800 | 325 |