DAILY POWER SYSTEM HIGHLIGHTS FOR FEBRUARY 12, 2004
The CPA Electricity Advisor issues this report to note significant events or conditions of interest in the power sector. The basic daily data on the power system is available on the CPA web site.
HIGHLIGHTS:
Generation:
Peak Power 4316Mw, 92,540Mw hours, 7-day Avg. 4034Mw
Generators Returned to Service 175 Mw Baiji 1, SP 90 Mw South Baghdad 6, SP 30 Mw Mosil 3, CP 15 Mw Hilla 3, CP 20 Mw Hilla 4, CP 20 Mw
Generators Unscheduled Out of Service 468 Mw PLANT
Type
SP, CP, RP, HP
Fault
Mw
Dibis 2
SP
Boiler leak
8
Daura 3
SP
Boiler Leak
65
* South Baghdad 5
SP
Circulating water pump
30
Baiji 2,
CP
Lubricating oil leak
110
Hilla 2
CP
Servo
15
Mosil 1
CP
Rotor Defect
15
Mosil 9
CP
Rotor Defect
15
Old Mulla 1
CP
Acc Gear
15
Old Mulla 2
CP
Servo and Circuit breaker
15
New Mulla 6
CP
Generator Defect
30
Taji 3,
CP
Compressor
15
Taji Mobile, 2
CP
Software problem
15
Hilla, 1,2
CP
Stopped to install trans line 40 Shuaiba 2, CP Stand By 80
* RED – Denotes out of service since last report
Generators Scheduled Out of Service 1026 Mw PLANT
Type
SP/NG
Prog. Maintenance(M) / Rehab (R) Maint.
Org.
Date out-of -service
Est. In-service Date
Mw
Baiji 2
SP
M
Bechtel
2 Jan 04
4 Mar
100
Daura 3
CP
R
GRD/RIE
1 Mar 03
1 Jun
20
Daura 4
SP
M
ME
2 Feb 04
20 Apr
65
Daura 5
SP
R
Bechtel
Jul 03
30 Apr
100
Daura 6
SP
R
Bechtel
Jul 03
31May
100
Dibis 3
SP
M
ME
30Dec 03
15 Feb
8
Dibis 4
CP
R
GRD/RIE
Sep 03
30 Mar
18
Hartha 4
SP
M
ME/Bechtel
23Oct 03
14 Feb
150
Khor Zubayr 4
CP
R
GRD/RIE
20Dec03
14 Feb
55
Mussaibe 4
SP
M
ME
7 Feb 04
7 Mar
180
Najaf 2
CP
M
GRD/RIE
5 Dec 03
30 Apr
50
New Mulla 1
CP
M
GRD/RIE
13 Jan 04
1 Jun
30
New Mulla 4
CP
M
GRD/RIE
3 Jan 04
1 Jun
30
Old Mulla 5
CP
M
GRD/RIE
1 Nov 03
1 Jun
15
Old Mulla 10
CP
M
GRD/RIE
6 Jan 04
1 Jun
15
Old Mulla 12
CP
R
GRD/RIE
1 Oct 03
1 Jun
15
Taji 7
CP
R
GRD/RIE
1 Oct 03
TBD
15
South Baghdad 1
SP
M
ME
12 Feb 04
4 Apr
30
South Baghdad 2
SP
M
ME
12 Feb 04
4 Apr
30
LEGEND OF ELECTRICAL SYSTEM POWER SOURCE
SP: STEAM POWER – These plants use either fuel oil or crude in burners CP: COMBUSTION POWER RP: RECIPROCATING POWER HP: HYDRO POWER
Transmission:
LINE
Kv
Fault
Maint.
Org.
Date out-of -service
Est. In-service Date
Comments
Nassiriya-Khor Zubayr
400
Sabotage
Bechtel
1 May
Haditha-Baghd West
400
Sabotage
GRD/RIE
15 Mar
41 towers complete/236 req’d Hartha-Qut – Wasit 400 Sabotage GRD/RIE
29 Feb
229 towers complete/293 req’d Baiji - Baghd West #1 400 Sabotage GRD/RIE
2 Mar
60 towers complete/66 req’d Baghd E.-Baghd S. #2 400 New Line GRD/RIE
2 Mar
81 towers complete/81 req’d Haditha – Qaim 400 Sabotage ME
TBD
No contract awarded
Baiji – Haditha
400
Sabotage
ME
TBD
No contract awarded
Diyala Connection
400
Sabotage
ME
30 Apr
Mosul – Mosul East
132
Sabotage
ME
TBD
Dibis/Irbil-Azadi/Quarqush 132 New Line GRD/RIE
1 Jun
Shuwaiba-Toba-Hamar
132
Sabotage
ME
15 Feb
Baghd West – Jamia
132
Sabotage
ME
TBD
Omara-Burzegan
132
Looting
ME
1 Mar
Temim- Tuz
132
Sabotage
ME
TBD
Nejibiya – Hartha
132
Sabotage
ME
TBD
Lines Returned to service:
None reported today
Distribution:
Report Date - 12 FEBRUARY 2004 GOVERNORATE Peak Load MW MWH Average Load MW Power transferred from North to Middle 820 MW.
Power transferred from South to Middle 180 MW.
Baghdad
1600
34116
1424
Duhok
80
1929
80
Naynawa
385
9269
386
Tamim
151
3616
151
Salah Aldeen
195
4805
200
Anbar
190
4223
176
Dyala
92
2203
92
Babil
95
2439
102
Kirbala
100
2521
105
Najaf
105
2569
107
Kadsya
65
1531
64
Wasit
85
2356
98
Muthana
60
1375
57
Nasirya
120
2771
115
Misan
61
1461
61
Basra
335
7470
311
Data compiled and reported by:
LTC Tharnell M. Thomas
CENTCOM LNO CPA Ministry of Electricity thomast2orha.centcom.mil Page PAGE 1 of NUMPAGES 3
Home / Essential Services / ESS-4366c102
Essential Services
DAILY POWER SYSTEM HIGHLIGHTS FOR FEBRUARY 12, 2004
- Date
- 12 February 2004
- Category
- Essential Services
- Text available
- English
- Files
- 1
Highlighting search results for: