# A-Steam Power Stations
Reporting Peak for 13 MARCH 2004 / Report Date - 14 MARCH 2004 A - Steam Power Stations Power Stations Type Fuel No. of Units No. of Operating Units Units Load (MW) Total Load MW Target Load MW Remarks 1 2 3 4 5 6 Dibis Natural Gas 4 1 8 8 24 #2 boiler leakge; #3 prog maint; #4 fuel filters Baiji Fuel Oil 6 3 85 85 90 260 500 #2 & #3 prog maint; #5 forced outage Daura Fuel Oil 4 1 65 65 180 #4 prog maint; #5 & #6 rehab South Baghdad Fuel Oil 6 1 30 30 200 #1 & #2 prog maint; #3 gen earth; #4 synch at 1555; #5 a/h; #6 fwp Mussaibe Crude and Fuel Oil 4 2 105 215 320 860 #1 synch at 1604; #2 prog maint; #4 prog maint Nassirya Crude 4 3 130 130 150 410 600 #2 prog maint Najebia Natural Gas and Crude 2 2 80 85 165 160 Hartha Natural Gas and Crude 4 2 60 90 150 300 Out of Service for Unscheduled Maintanence Total: 1408 2824 Out of Service for Program Maintanence/Rehab No activity Not Performing at Peak Performance
# B- Gas_C-Power Stations
Reporting Peak for 13 MARCH 2004 / Report Date - 14 MARCH 2004 B- Gas Power Stations C -Hydro Power Stations Power Stations No. of Units No. of Operating Units Station Load Target Load Fuel Use Remarks Power Stations No. of Units No. of Operating Units Station Load Target Load Discharge m3/Sec Gas Pressure Baiji 2 1 110 125 Gas Oil #1 heavy oil; #2 lub oil Musil Dam Main 4 4 616 600 Quds 2 2 110 160 Gas Oil 25 trucks Musil Dam reg 4 3 26 60 110 Mosil 12 9 135 150 31 #1 & #9 rotor defect; #11 h.p. Musil Pumping 2 1 110 0 Dibis 3 2 60 30 32 #4 rehab Haditha Dam 6 4 200 160 1000 Old Mulla 12 8 125 128 530 #1 acc gear; #2 servo; #12 needs rehab Samarra 3 3 78 55 800 New Mulla 6 4 135 173 300 #2 prog maint; #6 generator defect Himrin 2 2 50 21 200 Taji 7 55 #3 compressor; #4 stopped at 600 control card N.G. press low; #7 needs rehab Hindia 4 4 5 5 M. Taji 2 18 #2 software Kufa 4 2 2 0 Daura 4 30 #2 prog maint; #3 needs rehab NG press low Total 1087 896 Hilla 4 64 working on b.b. System Generation 77448 MWh Najaf 3 3 135 129 28 Syrian Line Generation 1318 MWh Khor 4 3 120 80 Natural Gas #4 gen prot. Turkey Line Generation 2002 MWh Shuaiba 2 1 5 20 Natural Gas #1 prog maint Total Generation 86195 MWh M. Shuaiba 2 Natural Gas System Peak Load 3674 MW Petro 4 1 10 0 Natural Gas #2 vib Syria Peak Load 56 MW M. Dibis 4 3 9 24 Natural Gas Turkey Peak Load 80 MW Mossil East 5 3 15 0 Gas Oil Fixed Gen Peak Load 266 MW Hmam/Zafranya 7 1 2 Gas Oil Total Peak Load 4076 MW Diesel 45 Gas Oil Baghdad Load 1465 MW Total 1016 1186 Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590).
Edited by Electricity Commission U.S. Advisor Staff.
# Peak Loads
Reporting Peak for 12 MARCH 2004 / Report Date - 13 MARCH 2004 Power transferred from North to Middle 870MW.
Power transferred from South to Middle 200 MW.
GOVERNORATE Peak Load MW MWH Average Load MW Baghdad 1456 29301 1221 Duhok 80 1921 80 Naynawa 355 8811 367 Tamim 120 3556 148 Salah Aldeen 196 5007 209 Anbar 200 4616 192 Dyala 105 2292 96 Babil 135 2505 104 Kirbala 105 2059 86 Najaf 95 2386 99 Kadsya 56 1516 63 Wasit 165 3110 130 Muthana 50 1393 58 Nasirya 115 2686 112 Misan 60 1579 66 Basra 300 6484 270
Home / Essential Services / ESS-d631185f
Essential Services
System Status Mar 14
- Date
- 14 March 2004
- Category
- Essential Services
- Text available
- English
- Files
- 1
Spreadsheet preview
Sheet “A-Steam Power Stations”: 16 rows × 13 columns
| Reporting Peak for 13 MARCH 2004 / Report Date - 14 MARCH 2004 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| A - Steam Power Stations | ||||||||||||
| Power Stations | Type Fuel | No. of Units | No. of Operating Units | Units Load (MW) | Total Load MW | Target Load MW | Remarks | |||||
| 1 | 2 | 3 | 4 | 5 | 6 | |||||||
| Dibis | Natural Gas | 4 | 1 | 8 | 8 | 24 | #2 boiler leakge; #3 prog maint; #4 fuel filters | |||||
| Baiji | Fuel Oil | 6 | 3 | 85 | 85 | 90 | 260 | 500 | #2 & #3 prog maint; #5 forced outage | |||
| Daura | Fuel Oil | 4 | 1 | 65 | 65 | 180 | #4 prog maint; #5 & #6 rehab | |||||
| South Baghdad | Fuel Oil | 6 | 1 | 30 | 30 | 200 | #1 & #2 prog maint; #3 gen earth; #4 synch at 1555; #5 a/h; #6 fwp | |||||
| Mussaibe | Crude and Fuel Oil | 4 | 2 | 105 | 215 | 320 | 860 | #1 synch at 1604; #2 prog maint; #4 prog maint | ||||
| Nassirya | Crude | 4 | 3 | 130 | 130 | 150 | 410 | 600 | #2 prog maint | |||
| Najebia | Natural Gas and Crude | 2 | 2 | 80 | 85 | 165 | 160 | |||||
| Hartha | Natural Gas and Crude | 4 | 2 | 60 | 90 | 150 | 300 | |||||
| Out of Service for Unscheduled Maintanence | Total: | 1,408 | 2,824 | |||||||||
| Out of Service for Program Maintanence/Rehab | ||||||||||||
| No activity | ||||||||||||
| Not Performing at Peak Performance |
Sheet “B- Gas_C-Power Stations”: 26 rows × 13 columns
| Reporting Peak for 13 MARCH 2004 / Report Date - 14 MARCH 2004 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| B- Gas Power Stations | C -Hydro Power Stations | |||||||||||
| Power Stations | No. of Units | No. of Operating Units | Station Load | Target Load | Fuel Use | Remarks | Power Stations | No. of Units | No. of Operating Units | Station Load | Target Load | Discharge m3/Sec |
| Gas Pressure | ||||||||||||
| Baiji | 2 | 1 | 110 | 125 | Gas Oil | #1 heavy oil; #2 lub oil | Musil Dam Main | 4 | 4 | 616 | 600 | |
| Quds | 2 | 2 | 110 | 160 | Gas Oil | 25 trucks | Musil Dam reg | 4 | 3 | 26 | 60 | 110 |
| Mosil | 12 | 9 | 135 | 150 | 31 | #1 & #9 rotor defect; #11 h.p. | Musil Pumping | 2 | 1 | 110 | 0 | |
| Dibis | 3 | 2 | 60 | 30 | 32 | #4 rehab | Haditha Dam | 6 | 4 | 200 | 160 | 1,000 |
| Old Mulla | 12 | 8 | 125 | 128 | 530 | #1 acc gear; #2 servo; #12 needs rehab | Samarra | 3 | 3 | 78 | 55 | 800 |
| New Mulla | 6 | 4 | 135 | 173 | 300 | #2 prog maint; #6 generator defect | Himrin | 2 | 2 | 50 | 21 | 200 |
| Taji | 7 | 55 | #3 compressor; #4 stopped at 600 control card N.G. press low; #7 needs rehab | Hindia | 4 | 4 | 5 | 5 | ||||
| M. Taji | 2 | 18 | #2 software | Kufa | 4 | 2 | 2 | 0 | ||||
| Daura | 4 | 30 | #2 prog maint; #3 needs rehab NG press low | Total | 1,087 | 896 | ||||||
| Hilla | 4 | 64 | working on b.b. | System Generation | 77,448 | MWh | ||||||
| Najaf | 3 | 3 | 135 | 129 | 28 | Syrian Line Generation | 1,318 | MWh | ||||
| Khor | 4 | 3 | 120 | 80 | Natural Gas | #4 gen prot. | Turkey Line Generation | 2,002 | MWh | |||
| Shuaiba | 2 | 1 | 5 | 20 | Natural Gas | #1 prog maint | Total Generation | 86,195 | MWh | |||
| M. Shuaiba | 2 | Natural Gas | System Peak Load | 3,674 | MW | |||||||
| Petro | 4 | 1 | 10 | 0 | Natural Gas | #2 vib | Syria Peak Load | 56 | MW | |||
| M. Dibis | 4 | 3 | 9 | 24 | Natural Gas | Turkey Peak Load | 80 | MW | ||||
| Mossil East | 5 | 3 | 15 | 0 | Gas Oil | Fixed Gen Peak Load | 266 | MW | ||||
| Hmam/Zafranya | 7 | 1 | 2 | Gas Oil | Total Peak Load | 4,076 | MW | |||||
| Diesel | 45 | Gas Oil | Baghdad Load | 1,465 | MW | |||||||
| Total | 1,016 | 1,186 | ||||||||||
| Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590). | ||||||||||||
| Edited by Electricity Commission U.S. Advisor Staff. |
Sheet “Peak Loads”: 24 rows × 11 columns · preview of the first 21 rows; full file from the original button
| Reporting Peak for 12 MARCH 2004 / Report Date - 13 MARCH 2004 | |||
|---|---|---|---|
| Power transferred from North to Middle 870MW. | |||
| Power transferred from South to Middle 200 MW. | |||
| GOVERNORATE | Peak Load MW | MWH | Average Load MW |
| Baghdad | 1,456 | 29,301 | 1,221 |
| Duhok | 80 | 1,921 | 80 |
| Naynawa | 355 | 8,811 | 367 |
| Tamim | 120 | 3,556 | 148 |
| Salah Aldeen | 196 | 5,007 | 209 |
| Anbar | 200 | 4,616 | 192 |
| Dyala | 105 | 2,292 | 96 |
| Babil | 135 | 2,505 | 104 |
| Kirbala | 105 | 2,059 | 86 |
| Najaf | 95 | 2,386 | 99 |
| Kadsya | 56 | 1,516 | 63 |
| Wasit | 165 | 3,110 | 130 |
| Muthana | 50 | 1,393 | 58 |
| Nasirya | 115 | 2,686 | 112 |
| Misan | 60 | 1,579 | 66 |
| Basra | 300 | 6,484 | 270 |