DAILY POWER SYSTEM HIGHLIGHTS FOR MARCH 15, 2004
The CPA Electricity Advisor issues this report to note significant events or conditions of interest in the power sector. The basic daily data on the power system is available on the CPA web site.
HIGHLIGHTS: Hartha 1 and 4, SP, operating at reduced load due to load flow problems. Hilla 1,2, and 4 CP, offline approx 6 hours for the connection of new mobile.
We will continue to see decreased power as we enter into the spring maintenance period. Sabotage will continue to have unanticipated and detrimental effects on power output.
Generation:
Peak Power 4123Mw, 90,087Mw hours, 7-day Avg. 4064Mw
Generators Returned to Service: 90 Mw South Baghdad 6 30 Mw Hilla, 1,2,4 60 Mw
Generators Unscheduled Out of Service 594 Mw PLANT
Type
SP, CP, RP, HP
Fault
Mw
* Dibis 1
SP
Pilot Light
8
Dibis 2
SP
Boiler Leak
8
Dibis 4
SP
Fuel Filters
8
South Baghdad 3
SP
Generator Differential
30
South Baghdad 5
SP
Air Heater
30
* Mussaibe 1
SP
Burner problems
200
Baiji 2
CP
Heavy Oil commissioning
110
Khor Zubayr 4
CP
Generator Protector
50
Mosil 1
CP
Rotor Defect
15
Mosil 9
CP
Rotor Defect
15
Mosil 11
CP
Hydraulic Pressure
15
Old Mulla 1
CP
Acc Gear
15
Old Mulla 2
CP
Servo
15
New Mulla 6
CP
Generator Defect
30
Taji 3,
CP
Compressor
15
Taji 4
CP
Control card
15
Taji Mobile, 2
CP
Software problem
15
* RED – Denotes out of service since last report
Generators Scheduled Out of Service 1256 Mw PLANT
Type
SP/NG
Prog. Maintenance(M) / Rehab (R) Maint.
Org.
Date out-of -service
Est. In-service Date
Mw
Baiji 2
SP
M
Bechtel
2 Jan 04
22 Mar
100
Baiji 3
SP
M
Bechtel
29 Feb 04
1 May
100
Doura 2
CP
M
ME
21 Feb 04
15 May
20
Doura 3
CP
R
GRD/RIE
1 Mar 03
15 May
20
Doura 4
SP
M
ME
2 Feb 04
20 Apr
65
Doura 5
SP
R
Bechtel
Jul 03
30 Apr
100
Doura 6
SP
R
Bechtel
Jul 03
31May
100
Dibis 3
SP
M
ME
30Dec 03
31 May
8
Dibis 4
CP
R
GRD/RIE
Sep 03
1 May
18
Hilla 3
CP
M
ME
9 Mar 04
TBD
20
Mussaibe 2
SP
M
ME
28 Feb 04
28 Apr
200
Mussaibe 4
SP
M
ME
7 Feb 04
15 May
200
Nassirya 2
SP
M
ME
9 Mar 04
15 Apr
150
New Mulla 2
CP
M
ME
17 Feb04
TBD
30
Old Mulla 8
CP
M
GRD/RIE
28 Feb 04
15 May
15
Old Mulla 12
CP
R
GRD/RIE
1 Oct 03
15 May
15
Taji 7
CP
R
GRD/RIE
1 Oct 03
15 May
15
Shuaiba 1
CP
M
ME
14 Feb 04
31 May
20
South Baghdad 1
SP
M
ME
12 Feb 04
12 Apr
30
South Baghdad 2
SP
M
ME
12 Feb 04
12 Apr
30
LEGEND OF ELECTRICAL SYSTEM POWER SOURCE
SP: STEAM POWER – These plants use either fuel oil or crude in burners CP: COMBUSTION POWER RP: RECIPROCATING POWER HP: HYDRO POWER
Transmission:
LINE
Kv
Fault
Maint.
Org.
Date out-of -service
Est. In-service Date
Comments
Nassiriya-Khor Zubayr
400
Sabotage
Bechtel
26 May
102 towers complete/212req’d Haditha-Baghd West 400 Sabotage GRD/RIE
15 Apr
216 towers complete/246 req’d Hartha-Qut – Wasit 400 Sabotage GRD/RIE
Complete
297 towers complete/297 req’d Baiji - Baghd West #1 400 Sabotage GRD/RIE
31 Mar
68 towers complete/68 req’d Baghd E.-Baghd S. #2 400 New Line GRD/RIE
Complete
81 towers complete/81req’d Haditha – Qaim 400 Sabotage ME
TBD
No contract awarded
Baiji – Haditha
400
Sabotage
Bechtel
TBD
No contract awarded
Diyala Connection
400
New Line
ME
30 May
Dibis/Irbil-Quarqush
132
New Line
GRD/RIE
15 May
Notice to proceed issued 12 Mar Mosul – Mosul East 132 Sabotage ME
TBD
Shuwaiba-Toba-Hamar
132
Sabotage
ME
Complete
44 towers complete/44 req’d Baghd West – Jamia 132 Sabotage ME
TBD
Omara-Burzegan
132
Looting
ME
1 May
26 towers complete/126 req’d Temim- Tuz 132 Sabotage ME
TBD
Nejibiya – Hartha
132
Sabotage
ME
TBD
Lines Returned to service:
None reported today
Distribution:
Report Date -15 MARCH 2004 Power transferred from North to Middle 870 MW.
Power transferred from South to Middle 205 MW.
GOVERNORATE
Peak Load MW
MWH
Average Load MW
Baghdad
1425
30024
1251
Duhok
85
1912
80
Naynawa
340
8669
361
Tamim
125
3420
143
Salah Aldeen
220
5161
215
Anbar
210
4728
197
Dyala
112
2521
105
Babil
104
2647
110
Kirbala
85
1944
81
Najaf
95
2351
98
Kadsya
100
2082
87
Wasit
108
2342
98
Muthana
68
1508
63
Nasirya
132
2783
116
Misan
70
1544
64
Basra
325
6335
264
Data compiled and reported by:
LTC Tharnell M. Thomas
CENTCOM LNO CPA Ministry of Electricity thomast2orha.centcom.mil Page PAGE 1 of NUMPAGES 3
Home / Essential Services / ESS-928b4b91
Essential Services
DAILY POWER SYSTEM HIGHLIGHTS FOR MARCH 15, 2004
- Date
- 15 March 2004
- Category
- Essential Services
- Text available
- English
- Files
- 1
Highlighting search results for: