DAILY POWER SYSTEM HIGHLIGHTS FOR MARCH 13, 2004

Date
13 March 2004
Category
Essential Services
Text available
English
Files
1
English original DOCDownload English text
DAILY POWER SYSTEM HIGHLIGHTS FOR MARCH 13, 2004 The CPA Electricity Advisor issues this report to note significant events or conditions of interest in the power sector. The basic daily data on the power system is available on the CPA web site. HIGHLIGHTS: We will continue to see decreased power as we enter into the spring maintenance period. Sabotage will continue to have unanticipated and detrimental effects on power output. Generation: Peak Power 4144Mw, 90,670Mw hours, 7-day Avg. 4012Mw Generators Returned to Service: 375 Mw Nassirya 3 125 Mw Hartha 4 90 Mw Baiji 1, CP 110 Mw Najaf 2 50 Mw Generators Unscheduled Out of Service 646 Mw PLANT Type SP, CP, RP, HP Fault Mw * Dibis 2 SP Boiler Leak 8 Dibis 4 SP Fuel Filters 8 South Baghdad 3 SP Generator Differential 30 * South Baghdad 4 SP Servo 30 South Baghdad 5 SP Air Heater 30 South Baghdad 6 SP Feed Water Pump 30 * Mussaibe 1 SP Fire in Exciter 200 * Baiji 2 CP Heavy Oil commissioning 110 Khor Zubayr 4 CP Generator Protector 50 Mosil 1 CP Rotor Defect 15 Mosil 9 CP Rotor Defect 15 Mosil 11 CP Hydraulic Pressure 15 Old Mulla 1 CP Acc Gear 15 Old Mulla 2 CP Servo 15 New Mulla 6 CP Generator Defect 30 Taji 3, CP Compressor 15 Taji 4 CP Control card 15 Taji Mobile, 2 CP Software problem 15 * RED – Denotes out of service since last report Generators Scheduled Out of Service 1256 Mw PLANT Type SP/NG Prog. Maintenance(M) / Rehab (R) Maint. Org. Date out-of -service Est. In-service Date Mw Baiji 2 SP M Bechtel 2 Jan 04 12 Mar 100 Baiji 3 SP M GRD/RIE 29 Feb 04 1 May 100 Doura 2 CP M ME 21 Feb 04 TBD 20 Doura 3 CP R GRD/RIE 1 Mar 03 15 May 20 Doura 4 SP M ME 2 Feb 04 20 Apr 65 Doura 5 SP R Bechtel Jul 03 30 Apr 100 Doura 6 SP R Bechtel Jul 03 31May 100 Dibis 3 SP M ME 30Dec 03 31 May 8 Dibis 4 CP R GRD/RIE Sep 03 1 May 18 Hilla 3 CP M ME 9 Mar 04 TBD 20 Mussaibe 2 SP M ME 28 Feb 04 28 Apr 200 Mussaibe 4 SP M ME 7 Feb 04 12 Mar 200 Nassirya 2 SP M ME 9 Mar 04 TBD 150 New Mulla 2 CP M ME 17 Feb04 TBD 30 Old Mulla 8 CP M GRD/RIE 28 Feb 04 15 May 15 Old Mulla 12 CP R GRD/RIE 1 Oct 03 15 May 15 Taji 7 CP R GRD/RIE 1 Oct 03 15 May 15 Shuaiba 1 CP M ME 14 Feb 04 31 May 20 South Baghdad 1 SP M ME 12 Feb 04 12 Apr 30 South Baghdad 2 SP M ME 12 Feb 04 12 Apr 30 LEGEND OF ELECTRICAL SYSTEM POWER SOURCE SP: STEAM POWER – These plants use either fuel oil or crude in burners CP: COMBUSTION POWER RP: RECIPROCATING POWER HP: HYDRO POWER Transmission: LINE Kv Fault Maint. Org. Date out-of -service Est. In-service Date Comments Nassiriya-Khor Zubayr 400 Sabotage Bechtel 26 May 102 towers complete/212req’d Haditha-Baghd West 400 Sabotage GRD/RIE 20 Apr 183 towers complete/236 req’d Hartha-Qut – Wasit 400 Sabotage GRD/RIE 12 Mar 297 towers complete/297 req’d Baiji - Baghd West #1 400 Sabotage GRD/RIE 31 Mar 68 towers complete/68 req’d Baghd E.-Baghd S. #2 400 New Line GRD/RIE 11 Mar 81 towers complete/81req’d Haditha – Qaim 400 Sabotage ME TBD No contract awarded Baiji – Haditha 400 Sabotage Bechtel TBD No contract awarded Diyala Connection 400 New Line ME 30 May Dibis/Irbil-Quarqush 132 New Line GRD/RIE 15 May Contractor on-site 20 Feb Mosul – Mosul East 132 Sabotage ME TBD Shuwaiba-Toba-Hamar 132 Sabotage ME Complete 44 towers complete/44 req’d Baghd West – Jamia 132 Sabotage ME TBD Omara-Burzegan 132 Looting ME 1 May 26 towers complete/126 req’d Temim- Tuz 132 Sabotage ME TBD Nejibiya – Hartha 132 Sabotage ME TBD Lines Returned to service: None reported today Distribution: Report Date -13 MARCH 2004 Power transferred from North to Middle 850 MW. Power transferred from South to Middle 200 MW. GOVERNORATE Peak Load MW MWH Average Load MW Baghdad 1405 29547 1231 Duhok 82 1984 83 Naynawa 395 9592 417 Tamim 160 4014 167 Salah Aldeen 240 5838 243 Anbar 195 4638 193 Dyala 135 2821 118 Babil 120 2657 111 Kirbala 95 2170 90 Najaf 128 2622 109 Kadsya 65 1631 68 Wasit 95 2202 92 Muthana 60 1406 59 Nasirya 120 2688 112 Misan 80 1636 68 Basra 270 6697 279 Data compiled and reported by: LTC Tharnell M. Thomas CENTCOM LNO CPA Ministry of Electricity thomast2orha.centcom.mil Page PAGE 1 of NUMPAGES 3