# A-Steam Power Stations
REPORT DATE - 28 January 2004 A - Steam Power Stations Power Stations Type Fuel No. of Units No. of Operating Units Units Load (MW) Total Load MW Target Load MW Remarks 1 2 3 4 5 6 Dibis Natural Gas 4 1 8 8 24 #1 turbine vib; #3 prog maint; #4 boiler leakage Baiji Fuel Oil 6 3 85 85 95 265 500 #2 prog maint; #5 forced outage; #6 testing Daura Fuel Oil 4 1 75 75 180 #4 rotor repair; #5 & #6 rehab South Baghdad Fuel Oil 6 3 30 25 30 85 200 #1synch at 2255; #2 air heater defect; #4 stopped at 2023 DLL; #5 prog maint; #6 synch at 1415 Mussaibe Crude and Fuel Oil 4 4 200 175 150 220 745 860 #1limited F.W.P; #3 boiler check Nassirya Crude 4 4 130 150 160 65 505 600 #4 synch at 1745 Najebia Natural Gas and Crude 2 1 35 35 160 #4 one boiler in operation; #5 stopped at 419 NG sys trouble Hartha Natural Gas and Crude 4 1 75 75 300 #1 FDF; #4 prog maint Out of Service for Unscheduled Maintanence Total: 1793 2824 Out of Service for Program Maintanence/Rehab No activity Not Performing at Peak Performance
# B- Gas_C-Power Stations
Report Date - 28 January 2004 B- Gas Power Stations C -Hydro Power Stations Power Stations No. of Units No. of Operating Units Station Load Target Load Fuel Use Remarks Power Stations No. of Units No. of Operating Units Station Load Target Load Discharge m3/Sec Gas Pressure Baiji 2 1 125 125 Gas Oil #2 lub oil leak from bearing Musil Dam Main 4 4 570 600 #3 synch at 1300 Quds 2 2 175 160 Gas Oil 42 trucks Musil Dam reg 4 4 46 60 750 Mosil 12 9 136 150 28 #1 rotor defec; #2 synch at 305; #3 bleed valve; #6 synch at 1435; #9 rotor defect Musil Pumping 2 1 110 0 Dibis 3 1 29 30 31 #4 & #5 rehab Haditha Dam 6 2 120 160 250 Old Mulla 12 7 95 128 540 #1 ACC great; #2 servo; #5 prog maint; #10 prog main; #12 needs rehab Samarra 3 2 33 55 350 New Mulla 6 3 105 173 3.5 #1 & #4 prog maint; #6 generator defect Himrin 2 1 23 21 130 Taji 7 5 61 55 18 #3 compressor; #4 synch at 1600; #7 needs rehab Hindia 4 4 5 5 140 M. Taji 2 1 8 18 18 #2 software Kufa 4 0 Daura 4 3 72 30 17 #3 needs rehab Total 907 896 Hilla 4 4 70 64 20 System Generation 84006 MWh Najaf 3 2 85 129 19 #2 prog maint Syrian Line Generation 1460 MWh Khor 4 3 120 80 Natural Gas #4 rehab Turkey Line Generation 2028 MWh Shuaiba 2 1 8 20 Natural Gas #2 S/B Total Generation 87494 MWh M. Shuaiba 2 Natural Gas split with the refinery System Peak Load 3835 MW Petro 4 1 10 0 Natural Gas Syria Peak Load 60 MW M. Dibis 4 3 12 24 Natural Gas Turkey Peak Load 82 MW Mossil East 5 2 12 0 Gas Oil Fixed Gen Peak Load 127 MW Hmam/Zafranya 7 2 3 Gas Oil Total Peak Load 4104 MW Diesel 37 Gas Oil Baghdad Load 1550 MW Total 1163 1186 Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590).
Edited by Electricity Commission U.S. Advisor Staff.
# Peak Loads
Report Date - 28 January 2004 GOVERNORATE Peak Load MW MWH Average Load MW Power transferred from North to Middle 770 MW.
Power transferred from South to Middle 200 MW.
Baghdad 1550 31164 1299
Duhok 82 1894 79
Naynawa 350 8304 346
Tamim 165 3511 146
Salah Aldeen 195 4801 200
Anbar 180 4304 179
Dyala 100 2424 101
Babil 110 2323 97
Kirbala 95 1963 82
Najaf 105 2361 98
Kadsya 60 1576 66
Wasit 95 2071 86
Muthana 65 1425 59
Nasirya 130 2849 119
Misan 85 1418 59
Basra 325 7400 308
Home / Essential Services / ESS-ad50fbe9
Essential Services
System Status Jan 28
- Date
- 28 January 2004
- Category
- Essential Services
- Text available
- English
- Files
- 1
Spreadsheet preview
Sheet “A-Steam Power Stations”: 16 rows × 13 columns
| REPORT DATE - 28 January 2004 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| A - Steam Power Stations | ||||||||||||
| Power Stations | Type Fuel | No. of Units | No. of Operating Units | Units Load (MW) | Total Load MW | Target Load MW | Remarks | |||||
| 1 | 2 | 3 | 4 | 5 | 6 | |||||||
| Dibis | Natural Gas | 4 | 1 | 8 | 8 | 24 | #1 turbine vib; #3 prog maint; #4 boiler leakage | |||||
| Baiji | Fuel Oil | 6 | 3 | 85 | 85 | 95 | 265 | 500 | #2 prog maint; #5 forced outage; #6 testing | |||
| Daura | Fuel Oil | 4 | 1 | 75 | 75 | 180 | #4 rotor repair; #5 & #6 rehab | |||||
| South Baghdad | Fuel Oil | 6 | 3 | 30 | 25 | 30 | 85 | 200 | #1synch at 2255; #2 air heater defect; #4 stopped at 2023 DLL; #5 prog maint; #6 synch at 1415 | |||
| Mussaibe | Crude and Fuel Oil | 4 | 4 | 200 | 175 | 150 | 220 | 745 | 860 | #1limited F.W.P; #3 boiler check | ||
| Nassirya | Crude | 4 | 4 | 130 | 150 | 160 | 65 | 505 | 600 | #4 synch at 1745 | ||
| Najebia | Natural Gas and Crude | 2 | 1 | 35 | 35 | 160 | #4 one boiler in operation; #5 stopped at 419 NG sys trouble | |||||
| Hartha | Natural Gas and Crude | 4 | 1 | 75 | 75 | 300 | #1 FDF; #4 prog maint | |||||
| Out of Service for Unscheduled Maintanence | Total: | 1,793 | 2,824 | |||||||||
| Out of Service for Program Maintanence/Rehab | ||||||||||||
| No activity | ||||||||||||
| Not Performing at Peak Performance |
Sheet “B- Gas_C-Power Stations”: 26 rows × 13 columns
| Report Date - 28 January 2004 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| B- Gas Power Stations | C -Hydro Power Stations | |||||||||||
| Power Stations | No. of Units | No. of Operating Units | Station Load | Target Load | Fuel Use | Remarks | Power Stations | No. of Units | No. of Operating Units | Station Load | Target Load | Discharge m3/Sec |
| Gas Pressure | ||||||||||||
| Baiji | 2 | 1 | 125 | 125 | Gas Oil | #2 lub oil leak from bearing | Musil Dam Main | 4 | 4 | 570 | 600 | #3 synch at 1300 |
| Quds | 2 | 2 | 175 | 160 | Gas Oil | 42 trucks | Musil Dam reg | 4 | 4 | 46 | 60 | 750 |
| Mosil | 12 | 9 | 136 | 150 | 28 | #1 rotor defec; #2 synch at 305; #3 bleed valve; #6 synch at 1435; #9 rotor defect | Musil Pumping | 2 | 1 | 110 | 0 | |
| Dibis | 3 | 1 | 29 | 30 | 31 | #4 & #5 rehab | Haditha Dam | 6 | 2 | 120 | 160 | 250 |
| Old Mulla | 12 | 7 | 95 | 128 | 540 | #1 ACC great; #2 servo; #5 prog maint; #10 prog main; #12 needs rehab | Samarra | 3 | 2 | 33 | 55 | 350 |
| New Mulla | 6 | 3 | 105 | 173 | 3.50 | #1 & #4 prog maint; #6 generator defect | Himrin | 2 | 1 | 23 | 21 | 130 |
| Taji | 7 | 5 | 61 | 55 | 18 | #3 compressor; #4 synch at 1600; #7 needs rehab | Hindia | 4 | 4 | 5 | 5 | 140 |
| M. Taji | 2 | 1 | 8 | 18 | 18 | #2 software | Kufa | 4 | 0 | |||
| Daura | 4 | 3 | 72 | 30 | 17 | #3 needs rehab | Total | 907 | 896 | |||
| Hilla | 4 | 4 | 70 | 64 | 20 | System Generation | 84,006 | MWh | ||||
| Najaf | 3 | 2 | 85 | 129 | 19 | #2 prog maint | Syrian Line Generation | 1,460 | MWh | |||
| Khor | 4 | 3 | 120 | 80 | Natural Gas | #4 rehab | Turkey Line Generation | 2,028 | MWh | |||
| Shuaiba | 2 | 1 | 8 | 20 | Natural Gas | #2 S/B | Total Generation | 87,494 | MWh | |||
| M. Shuaiba | 2 | Natural Gas | split with the refinery | System Peak Load | 3,835 | MW | ||||||
| Petro | 4 | 1 | 10 | 0 | Natural Gas | Syria Peak Load | 60 | MW | ||||
| M. Dibis | 4 | 3 | 12 | 24 | Natural Gas | Turkey Peak Load | 82 | MW | ||||
| Mossil East | 5 | 2 | 12 | 0 | Gas Oil | Fixed Gen Peak Load | 127 | MW | ||||
| Hmam/Zafranya | 7 | 2 | 3 | Gas Oil | Total Peak Load | 4,104 | MW | |||||
| Diesel | 37 | Gas Oil | Baghdad Load | 1,550 | MW | |||||||
| Total | 1,163 | 1,186 | ||||||||||
| Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590). | ||||||||||||
| Edited by Electricity Commission U.S. Advisor Staff. |
Sheet “Peak Loads”: 24 rows × 4 columns · preview of the first 21 rows; full file from the original button
| Report Date - 28 January 2004 | |||
|---|---|---|---|
| GOVERNORATE | Peak Load MW | MWH | Average Load MW |
| Power transferred from North to Middle 770 MW. | |||
| Power transferred from South to Middle 200 MW. | |||
| Baghdad | 1,550 | 31,164 | 1,299 |
| Duhok | 82 | 1,894 | 79 |
| Naynawa | 350 | 8,304 | 346 |
| Tamim | 165 | 3,511 | 146 |
| Salah Aldeen | 195 | 4,801 | 200 |
| Anbar | 180 | 4,304 | 179 |
| Dyala | 100 | 2,424 | 101 |
| Babil | 110 | 2,323 | 97 |
| Kirbala | 95 | 1,963 | 82 |
| Najaf | 105 | 2,361 | 98 |
| Kadsya | 60 | 1,576 | 66 |
| Wasit | 95 | 2,071 | 86 |
| Muthana | 65 | 1,425 | 59 |
| Nasirya | 130 | 2,849 | 119 |
| Misan | 85 | 1,418 | 59 |
| Basra | 325 | 7,400 | 308 |