Sheet “A-Steam Power Stations”: 16 rows × 13 columns

REPORT DATE - 28 January 2004
A - Steam Power Stations
Power StationsType FuelNo. of UnitsNo. of Operating UnitsUnits Load (MW)Total Load MWTarget Load MWRemarks
123456
DibisNatural Gas418824#1 turbine vib; #3 prog maint; #4 boiler leakage
BaijiFuel Oil63858595265500#2 prog maint; #5 forced outage; #6 testing
DauraFuel Oil417575180#4 rotor repair; #5 & #6 rehab
South BaghdadFuel Oil6330253085200#1synch at 2255; #2 air heater defect; #4 stopped at 2023 DLL; #5 prog maint; #6 synch at 1415
MussaibeCrude and Fuel Oil44200175150220745860#1limited F.W.P; #3 boiler check
NassiryaCrude4413015016065505600#4 synch at 1745
NajebiaNatural Gas and Crude213535160#4 one boiler in operation; #5 stopped at 419 NG sys trouble
HarthaNatural Gas and Crude417575300#1 FDF; #4 prog maint
Out of Service for Unscheduled MaintanenceTotal:1,7932,824
Out of Service for Program Maintanence/Rehab
No activity
Not Performing at Peak Performance
# A-Steam Power Stations REPORT DATE - 28 January 2004 A - Steam Power Stations Power Stations Type Fuel No. of Units No. of Operating Units Units Load (MW) Total Load MW Target Load MW Remarks 1 2 3 4 5 6 Dibis Natural Gas 4 1 8 8 24 #1 turbine vib; #3 prog maint; #4 boiler leakage Baiji Fuel Oil 6 3 85 85 95 265 500 #2 prog maint; #5 forced outage; #6 testing Daura Fuel Oil 4 1 75 75 180 #4 rotor repair; #5 & #6 rehab South Baghdad Fuel Oil 6 3 30 25 30 85 200 #1synch at 2255; #2 air heater defect; #4 stopped at 2023 DLL; #5 prog maint; #6 synch at 1415 Mussaibe Crude and Fuel Oil 4 4 200 175 150 220 745 860 #1limited F.W.P; #3 boiler check Nassirya Crude 4 4 130 150 160 65 505 600 #4 synch at 1745 Najebia Natural Gas and Crude 2 1 35 35 160 #4 one boiler in operation; #5 stopped at 419 NG sys trouble Hartha Natural Gas and Crude 4 1 75 75 300 #1 FDF; #4 prog maint Out of Service for Unscheduled Maintanence Total: 1793 2824 Out of Service for Program Maintanence/Rehab No activity Not Performing at Peak Performance # B- Gas_C-Power Stations Report Date - 28 January 2004 B- Gas Power Stations C -Hydro Power Stations Power Stations No. of Units No. of Operating Units Station Load Target Load Fuel Use Remarks Power Stations No. of Units No. of Operating Units Station Load Target Load Discharge m3/Sec Gas Pressure Baiji 2 1 125 125 Gas Oil #2 lub oil leak from bearing Musil Dam Main 4 4 570 600 #3 synch at 1300 Quds 2 2 175 160 Gas Oil 42 trucks Musil Dam reg 4 4 46 60 750 Mosil 12 9 136 150 28 #1 rotor defec; #2 synch at 305; #3 bleed valve; #6 synch at 1435; #9 rotor defect Musil Pumping 2 1 110 0 Dibis 3 1 29 30 31 #4 & #5 rehab Haditha Dam 6 2 120 160 250 Old Mulla 12 7 95 128 540 #1 ACC great; #2 servo; #5 prog maint; #10 prog main; #12 needs rehab Samarra 3 2 33 55 350 New Mulla 6 3 105 173 3.5 #1 & #4 prog maint; #6 generator defect Himrin 2 1 23 21 130 Taji 7 5 61 55 18 #3 compressor; #4 synch at 1600; #7 needs rehab Hindia 4 4 5 5 140 M. Taji 2 1 8 18 18 #2 software Kufa 4 0 Daura 4 3 72 30 17 #3 needs rehab Total 907 896 Hilla 4 4 70 64 20 System Generation 84006 MWh Najaf 3 2 85 129 19 #2 prog maint Syrian Line Generation 1460 MWh Khor 4 3 120 80 Natural Gas #4 rehab Turkey Line Generation 2028 MWh Shuaiba 2 1 8 20 Natural Gas #2 S/B Total Generation 87494 MWh M. Shuaiba 2 Natural Gas split with the refinery System Peak Load 3835 MW Petro 4 1 10 0 Natural Gas Syria Peak Load 60 MW M. Dibis 4 3 12 24 Natural Gas Turkey Peak Load 82 MW Mossil East 5 2 12 0 Gas Oil Fixed Gen Peak Load 127 MW Hmam/Zafranya 7 2 3 Gas Oil Total Peak Load 4104 MW Diesel 37 Gas Oil Baghdad Load 1550 MW Total 1163 1186 Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590). Edited by Electricity Commission U.S. Advisor Staff. # Peak Loads Report Date - 28 January 2004 GOVERNORATE Peak Load MW MWH Average Load MW Power transferred from North to Middle 770 MW. Power transferred from South to Middle 200 MW. Baghdad 1550 31164 1299 Duhok 82 1894 79 Naynawa 350 8304 346 Tamim 165 3511 146 Salah Aldeen 195 4801 200 Anbar 180 4304 179 Dyala 100 2424 101 Babil 110 2323 97 Kirbala 95 1963 82 Najaf 105 2361 98 Kadsya 60 1576 66 Wasit 95 2071 86 Muthana 65 1425 59 Nasirya 130 2849 119 Misan 85 1418 59 Basra 325 7400 308