DAILY POWER SYSTEM HIGHLIGHTS FOR JANUARY 29, 2004
The CPA Electricity Advisor issues this report to note significant events or conditions of interest in the power sector. The basic daily data on the power system is available on the CPA web site.
HIGHLIGHTS: Hilla, 1,2,3,4 and Najaf 1,3 were all out of service due to natural gas pipeline leak. This leak resulted in a 170 mw loss.
Generation:
Peak Power 4112Mw, 87,486 Mw hours, 7-day Avg. 3977 Mw
Generators Returned to Service 108 Mw Dibis 4 8 Mw Najebia 5 100 Mw
Generators Unscheduled Out of Service 798 Mw PLANT
Type
SP, CP, RP, HP
Fault
Mw
Dibis 1
SP
Turbine vibration
8
Baiji 5,
SP
Forced Outage (No ECD)
30
Daura 4
SP
Rotor repair
25
South Baghdad 2
SP
Air HeaterLeak
30
South Baghdad 4
SP
Boiler Leak
30
* Nassirya 3
SP
Boiler Leak
160
Baiji 2,
CP
Lubricating oil leak
40
* Qudis
CP
Fuel Pressure
90
Mosil 1
CP
Rotor Defect
15
Mosil 3
CP
Bleeder valve
15
Mosil 9
CP
Rotor Defect
15
Old Mulla 1
CP
Acc Gear
15
Old Mulla 2
CP
Servo and Circuit breaker
15
New Mulla 6
CP
Generator Defect
15
Taji 3,
CP
Compressor
15
* Taji 5,
CP
Stopped, Unknown Reason
15
Taji Mobile, 2
CP
Software problem
15
* Hilla, 1,2,3,4
CP
Natural gas Pipeline Leak
70
* Najaf 1,3
CP
Natural Gas Pipeline Leak
100
Shuaiba 2,
CP
Gas Turbine Leak
80
* RED – Denotes out of service since last report
Generators Scheduled Out of Service 854 Mw PLANT
Type
SP/NG
Prog. Maintenance(M) / Rehab (R) Maint.
Org.
Date out-of -service
Est. In-service Date
Mw
Baiji 2
SP
M
Bechtel
2 Jan 04
01Mar
100
Baiji 6
SP
M
Bechtel
5 Dec 03
03Feb
100
Daura 3
CP
R
RIE/ME
1 Mar 03
TBD
20
Daura 5
SP
R
Bechtel
Jul 03
30 Apr
100
Daura 6
SP
R
Bechtel
Jul 03
31May
100
Dibis 3
SP
M
ME/GRD
30Dec 03
15 Feb
8
Dibis 4
CP
R
ME/Bechtel
Sep 03
30 Mar
18
Dibis 5
CP
R
ME/Bechtel
Sep 03
6 Feb
18
Hartha 4
SP
M
ME/Bechtel
23Oct 03
1 Feb
150
Khor Zubayr 4
CP
R
RIE/GRD
20Dec03
31 Jan
55
Najaf 2
CP
R
RIE/GRD
5 Dec 03
30 Apr
50
New Mulla 1
CP
M
RIE/GRD
13 Jan 04
15 Feb
30
New Mulla 4
CP
M
RIE/GRD
3 Jan 04
31 Mar
30
Old Mulla 5
CP
M
RIE/GRD
1 Nov 03
15 Feb
15
Old Mulla 10
CP
M
RIE/GRD
6 Jan 04
5 Feb
15
Old Mulla 12
CP
R
RIE/GRD
1 Oct 03
TBD
15
South Baghdad 5
SP
M
ME/Bechtel
1 Mar 03
6 Feb
35
Taji 7
CP
R
RIE/GRD
1 Oct 03
TBD
15
Transmission:
LINE
Kv
Fault
Maint.
Org.
Date out-of -service
Est. In-service Date
Comments
Nassiriya-Khor Zubayr
400
Sabotage
Bechtel
1 May
Haditha-Baghd West
400
Sabotage
GRD
15 Mar
8 towers complete/236 req’d Hartha-Qarna – Wasit 400 Sabotage GRD
29 Feb
178 towers complete/293 req’d
Baghd South – Diwaniya
400
Sabotage
GRD
Complete
27 towers complete/27 req’d Baiji - Baghd West #1 400 Sabotage GRD
10 Feb
38 towers complete/58 req’d Baghd E.-Baghd S. #2 400 New Line GRD
31 Jan
79 towers complete/81 req’d Haditha – Qaim 400 Sabotage ME
TBD
No Contractor
Baiji – Haditha
400
Sabotage
ME
TBD
No contractor
Diyala Connection
400
Sabotage
ME
30 Apr
Baiji – Mosul
400
Sabotage
ME
Complete
Mosul – Mosul East
132
Sabotage
GRD
TBD
Shuwaiba-Toba-Hamar
132
Sabotage
ME
TBD
Baghd West – Jamia
132
Sabotage
GRD
TBD
Omara-Burzegan
132
Looting
ME
1 Mar
Temim- Tuz
132
Sabotage
GRD
TBD
Nejibiya – Hartha
132
Sabotage
GRD
TBD
Lines Returned to service:
None reported today
Distribution:
Report Date - 29 January 2004 GOVERNORATE Peak Load MW MWH Average Load MW Power transferred from North to Middle 810 MW.
Power transferred from South to Middle 190 MW.
Baghdad
1530
31834
1326
Duhok
80
1934
81
Naynawa
330
8657
361
Tamim
175
3624
151
Salah Aldeen
195
5043
210
Anbar
180
4391
183
Dyala
120
2446
102
Babil
100
2476
103
Kirbala
97
1929
80
Najaf
115
2473
103
Kadsya
56
1425
59
Wasit
98
2125
89
Muthana
58
1380
58
Nasirya
130
2866
119
Misan
59
1170
49
Basra
250
6295
262
LEGEND OF ELECTRICAL SYSTEM POWER SOURCE
SP: STEAM POWER – These plants use either fuel oil or crude in burners CP: COMBUSTION POWER RP: RECIPROCATING POWER HP: HYDRO POWER
LEGEND OF MAINTENANCE ORGANIZATIONS
ME: Ministry of Electricity RIE: Restore Iraq Electricity, Formerly TF RIE GRD: Gulf Region Division
Data compiled and reported by:
LTC Tharnell M. Thomas
CENTCOM LNO CPA Ministry of Electricity thomast2orha.centcom.mil Page PAGE 3 of NUMPAGES 3
Home / Essential Services / ESS-4779ae5d
Essential Services
DAILY POWER SYSTEM HIGHLIGHTS FOR JANUARY 29, 2004
- Date
- 29 January 2004
- Category
- Essential Services
- Text available
- English
- Files
- 1
Highlighting search results for: