Home / Essential Services / ESS-4779ae5d

Essential Services

DAILY POWER SYSTEM HIGHLIGHTS FOR JANUARY 29, 2004

Date
29 January 2004
Category
Essential Services
Text available
English
Files
1
English original DOCDownload English text
DAILY POWER SYSTEM HIGHLIGHTS FOR JANUARY 29, 2004 The CPA Electricity Advisor issues this report to note significant events or conditions of interest in the power sector. The basic daily data on the power system is available on the CPA web site. HIGHLIGHTS: Hilla, 1,2,3,4 and Najaf 1,3 were all out of service due to natural gas pipeline leak. This leak resulted in a 170 mw loss. Generation: Peak Power 4112Mw, 87,486 Mw hours, 7-day Avg. 3977 Mw Generators Returned to Service 108 Mw Dibis 4 8 Mw Najebia 5 100 Mw Generators Unscheduled Out of Service 798 Mw PLANT Type SP, CP, RP, HP Fault Mw Dibis 1 SP Turbine vibration 8 Baiji 5, SP Forced Outage (No ECD) 30 Daura 4 SP Rotor repair 25 South Baghdad 2 SP Air HeaterLeak 30 South Baghdad 4 SP Boiler Leak 30 * Nassirya 3 SP Boiler Leak 160 Baiji 2, CP Lubricating oil leak 40 * Qudis CP Fuel Pressure 90 Mosil 1 CP Rotor Defect 15 Mosil 3 CP Bleeder valve 15 Mosil 9 CP Rotor Defect 15 Old Mulla 1 CP Acc Gear 15 Old Mulla 2 CP Servo and Circuit breaker 15 New Mulla 6 CP Generator Defect 15 Taji 3, CP Compressor 15 * Taji 5, CP Stopped, Unknown Reason 15 Taji Mobile, 2 CP Software problem 15 * Hilla, 1,2,3,4 CP Natural gas Pipeline Leak 70 * Najaf 1,3 CP Natural Gas Pipeline Leak 100 Shuaiba 2, CP Gas Turbine Leak 80 * RED – Denotes out of service since last report Generators Scheduled Out of Service 854 Mw PLANT Type SP/NG Prog. Maintenance(M) / Rehab (R) Maint. Org. Date out-of -service Est. In-service Date Mw Baiji 2 SP M Bechtel 2 Jan 04 01Mar 100 Baiji 6 SP M Bechtel 5 Dec 03 03Feb 100 Daura 3 CP R RIE/ME 1 Mar 03 TBD 20 Daura 5 SP R Bechtel Jul 03 30 Apr 100 Daura 6 SP R Bechtel Jul 03 31May 100 Dibis 3 SP M ME/GRD 30Dec 03 15 Feb 8 Dibis 4 CP R ME/Bechtel Sep 03 30 Mar 18 Dibis 5 CP R ME/Bechtel Sep 03 6 Feb 18 Hartha 4 SP M ME/Bechtel 23Oct 03 1 Feb 150 Khor Zubayr 4 CP R RIE/GRD 20Dec03 31 Jan 55 Najaf 2 CP R RIE/GRD 5 Dec 03 30 Apr 50 New Mulla 1 CP M RIE/GRD 13 Jan 04 15 Feb 30 New Mulla 4 CP M RIE/GRD 3 Jan 04 31 Mar 30 Old Mulla 5 CP M RIE/GRD 1 Nov 03 15 Feb 15 Old Mulla 10 CP M RIE/GRD 6 Jan 04 5 Feb 15 Old Mulla 12 CP R RIE/GRD 1 Oct 03 TBD 15 South Baghdad 5 SP M ME/Bechtel 1 Mar 03 6 Feb 35 Taji 7 CP R RIE/GRD 1 Oct 03 TBD 15 Transmission: LINE Kv Fault Maint. Org. Date out-of -service Est. In-service Date Comments Nassiriya-Khor Zubayr 400 Sabotage Bechtel 1 May Haditha-Baghd West 400 Sabotage GRD 15 Mar 8 towers complete/236 req’d Hartha-Qarna – Wasit 400 Sabotage GRD 29 Feb 178 towers complete/293 req’d Baghd South – Diwaniya 400 Sabotage GRD Complete 27 towers complete/27 req’d Baiji - Baghd West #1 400 Sabotage GRD 10 Feb 38 towers complete/58 req’d Baghd E.-Baghd S. #2 400 New Line GRD 31 Jan 79 towers complete/81 req’d Haditha – Qaim 400 Sabotage ME TBD No Contractor Baiji – Haditha 400 Sabotage ME TBD No contractor Diyala Connection 400 Sabotage ME 30 Apr Baiji – Mosul 400 Sabotage ME Complete Mosul – Mosul East 132 Sabotage GRD TBD Shuwaiba-Toba-Hamar 132 Sabotage ME TBD Baghd West – Jamia 132 Sabotage GRD TBD Omara-Burzegan 132 Looting ME 1 Mar Temim- Tuz 132 Sabotage GRD TBD Nejibiya – Hartha 132 Sabotage GRD TBD Lines Returned to service: None reported today Distribution: Report Date - 29 January 2004 GOVERNORATE Peak Load MW MWH Average Load MW Power transferred from North to Middle 810 MW. Power transferred from South to Middle 190 MW. Baghdad 1530 31834 1326 Duhok 80 1934 81 Naynawa 330 8657 361 Tamim 175 3624 151 Salah Aldeen 195 5043 210 Anbar 180 4391 183 Dyala 120 2446 102 Babil 100 2476 103 Kirbala 97 1929 80 Najaf 115 2473 103 Kadsya 56 1425 59 Wasit 98 2125 89 Muthana 58 1380 58 Nasirya 130 2866 119 Misan 59 1170 49 Basra 250 6295 262 LEGEND OF ELECTRICAL SYSTEM POWER SOURCE SP: STEAM POWER – These plants use either fuel oil or crude in burners CP: COMBUSTION POWER RP: RECIPROCATING POWER HP: HYDRO POWER LEGEND OF MAINTENANCE ORGANIZATIONS ME: Ministry of Electricity RIE: Restore Iraq Electricity, Formerly TF RIE GRD: Gulf Region Division Data compiled and reported by: LTC Tharnell M. Thomas CENTCOM LNO CPA Ministry of Electricity thomast2orha.centcom.mil Page PAGE 3 of NUMPAGES 3