DAILY POWER SYSTEM HIGHLIGHTS FOR FEBRUARY 7, 2004

Date
7 February 2004
Category
Essential Services
Text available
English
Files
1
English original DOCDownload English text
DAILY POWER SYSTEM HIGHLIGHTS FOR FEBRUARY 7, 2004 The CPA Electricity Advisor issues this report to note significant events or conditions of interest in the power sector. The basic daily data on the power system is available on the CPA web site. HIGHLIGHTS: Generation: Peak Power 3739Mw, 83,356 hours, 7-day Avg. 3919 Mw Generators Returned to Service 260 Mw Nassirya 2 150 Mw Baiji 1 110 Mw Generators Unscheduled Out of Service 758 Mw PLANT Type SP, CP, RP, HP Fault Mw Dibis 2 SP Boiler leak 8 Daura 4 SP Turbine Vibration 25 Mussaibe 4 SP Emergency stop, Vibration 170 South Baghdad 1 SP Air Heater 30 South Baghdad 2 SP Boiler Leak 30 * South Baghdad 6 SP Boiler Leak 30 Qudas 2 CP Tripped by loss of Flame 110 Baiji 2, CP Lubricating oil leak 110 * Hilla 2 CP Gas System trouble 15 Mosil 1 CP Rotor Defect 15 Mosil 3 CP Transformr. Primary Protec. 15 Mosil 9 CP Rotor Defect 15 Old Mulla 1 CP Acc Gear 15 Old Mulla 2 CP Servo and Circuit breaker 15 New Mulla 6 CP Generator Defect 15 Taji 3, CP Compressor 15 Taji 4 CP Combustion chamber temp. 15 Taji Mobile, 2 CP Software problem 15 Daura 4 CP Diesel trouble 15 Shuaiba 2, CP Gas Turbine Leak 80 * RED – Denotes out of service since last report Generators Scheduled Out of Service 874 Mw PLANT Type SP/NG Prog. Maintenance(M) / Rehab (R) Maint. Org. Date out-of -service Est. In-service Date Mw Baiji 2 SP M Bechtel 2 Jan 04 01Mar 100 Baiji 6 SP M Bechtel 5 Dec 03 18 Feb 100 Daura 3 CP R GRD/RIE 1 Mar 03 1 Jun 20 Daura 5 SP R Bechtel Jul 03 30 Apr 100 Daura 6 SP R Bechtel Jul 03 31May 100 Dibis 3 SP M ME 30Dec 03 15 Feb 8 Dibis 4 CP R GRD/RIE Sep 03 30 Mar 18 Dibis 5 CP R GRD/RIE Sep 03 6 Feb 18 Hartha 4 SP M ME/Bechtel 23Oct 03 14 Feb 150 Khor Zubayr 4 CP R GRD/RIE 20Dec03 14 Feb 55 Najaf 2 CP R GRD/RIE 5 Dec 03 30 Apr 50 New Mulla 1 CP M GRD/RIE 13 Jan 04 1 Jun 30 New Mulla 4 CP M GRD/RIE 3 Jan 04 1 Jun 30 Old Mulla 5 CP M GRD/RIE 1 Nov 03 1 Jun 15 Old Mulla 10 CP M GRD/RIE 6 Jan 04 1 Jun 15 Old Mulla 12 CP R GRD/RIE 1 Oct 03 1 Jun 15 South Baghdad 5 SP M ME/Bechtel 1 Mar 03 No ECD 35 Taji 7 CP R GRD/RIE 1 Oct 03 TBD 15 LEGEND OF ELECTRICAL SYSTEM POWER SOURCE SP: STEAM POWER – These plants use either fuel oil or crude in burners CP: COMBUSTION POWER RP: RECIPROCATING POWER HP: HYDRO POWER Transmission: LINE Kv Fault Maint. Org. Date out-of -service Est. In-service Date Comments Nassiriya-Khor Zubayr 400 Sabotage Bechtel 1 May Haditha-Baghd West 400 Sabotage GRD/RIE 15 Mar 38 towers complete/236 req’d Hartha-Qarna – Wasit 400 Sabotage GRD/RIE 29 Feb 227 towers complete/293 req’d Baghd South – Diwaniya 400 Sabotage GRD/RIE Complete 27 towers complete/27 req’d Baiji - Baghd West #1 400 Sabotage GRD/RIE 10 Feb 60 towers complete/66 req’d Baghd E.-Baghd S. #2 400 New Line GRD/RIE 10 Feb 81 towers complete/81 req’d Haditha – Qaim 400 Sabotage ME TBD No Contract awarded Baiji – Haditha 400 Sabotage ME TBD No contract awarded Diyala Connection 400 Sabotage ME 30 Apr Baiji – Mosul 400 Damaged ME Complete Mosul – Mosul East 132 Sabotage ME TBD Dibis/Irbil-Azadi/Quarqush 132 New Line GRD/RIE Shuwaiba-Toba-Hamar 132 Sabotage ME TBD Baghd West – Jamia 132 Sabotage ME TBD Omara-Burzegan 132 Looting ME 1 Mar Temim- Tuz 132 Sabotage ME TBD Nejibiya – Hartha 132 Sabotage ME TBD Lines Returned to service: None reported today Distribution: Report Date - 7 February 2004 GOVERNORATE Peak Load MW MWH Average Load MW Power transferred from North to Middle 750 MW. Power transferred from South to Middle 200 MW. Baghdad 968 Duhok 81 Naynawa 320 Tamim 142 Salah Aldeen 191 Anbar 165 Dyala 76 Babil 100 Kirbala 106 Najaf 102 Kadsya 84 Wasit 49 Muthana 47 Nasirya 114 Misan 57 Basra 318 Data compiled and reported by: LTC Tharnell M. Thomas CENTCOM LNO CPA Ministry of Electricity thomast2orha.centcom.mil Page PAGE 1 of NUMPAGES 3