DAILY POWER SYSTEM HIGHLIGHTS FOR APRIL 3, 2004
The CPA Electricity Advisor issues this report to note significant events or conditions of interest in the power sector. The basic daily data on the power system is available on the CPA web site.
HIGHLIGHTS: Baiji-Baghdad West #1, 400 Kv Transmission Line, operational now.
We will continue to see decreased power as we enter into the spring maintenance period. Sabotage will continue to have unanticipated and detrimental effects on power output.
Generation:
Peak Power 3903Mw, 79,171Mw hours, 7-day Avg. 3883Mw
Generators Returned to Service: 313 Mw Dibis 3, SP 8 Mw Baiji 6, SP 85 Mw South Baghdad 5, CP 30 Mw Baiji 2, CP 110 Mw Mosil 12, CP 15 Mw Mosil 2, CP 15 Mw New Mulla 3, CP 30 Mw Doura 4, CP 20 Mw
Generators Unscheduled Out of Service (18) 463 Mw PLANT
Type
SP, CP, RP, HP
Fault
Mw
* Dibis 2
SP
Boiler Leak
8
Baiji 2
SP
Low air flow
120
South Baghdad 4
SP
High furnace pressure
30
Mosil 1
CP
Rotor Defect
15
* Mosil 3
CP
Servo
15
Mosil 9
CP
Rotor Defect
15
Dibis 6
CP
Vibrations
30
Old Mulla 1
CP
Acc Gear
15
Old Mulla 2
CP
Servo
15
Old Mulla 6
CP
High exhaust temperature
15
Old Mulla 8
CP
Vibrations
15
Old Mulla 9,10
CP
Transformer damage
30
New Mulla 3
CP
Hydraulic Pressure
30
* Taji 2
CP
Turbine temperature
15
Taji 3,
CP
Compressor
15
* Taji 5
CP
Oil leak
15
M. Taji 2
CP
Software
15
Khor Zubayr 4
CP
Cooling System problem
50
RED – Denotes out of service since last report
Generators Scheduled Out of Service (26) 1903 Mw PLANT
Type
SP/NG
Prog. Maintenance(M) / Rehab (R) Maint.
Org.
Date out-of -service
Est. In-service Date
Mw
Baiji 1
SP
M
TBD
21 Mar 04
21 May
100
Baiji 3
SP
M
Bechtel
29 Feb 04
1 May
100
Dibis 4
SP
M
ME
15 Mar 04
30 Apr
8
Doura 2
CP
M
ME
21 Feb 04
15 May
20
Doura 3
CP
R
GRD/RIE
1 Mar 03
TBD
20
Doura 3
SP
M
ME
18 Mar 04
18 May
65
Doura 4
SP
M
ME
2 Feb 04
20 Apr
65
Doura 5
SP
R
Bechtel
Jul 03
30 May
100
Doura 6
SP
R
Bechtel
Jul 03
30 Jun
100
Dibis 4
CP
R
GRD/RIE
Sep 03
12 May
30
Hartha 1
SP
M
ME
22 Mar 04
23 May
100
Khor Zubayr 2
CP
R
GRD/RIE
15 Mar 04
15 Jun
50
Mosil 11
CP
M
ME
2 Apr 04
TBD
15
Mussaibe 2
SP
M
ME
28 Feb 04
28 Apr
200
Mussaibe 4
SP
M
ME
7 Feb 04
4 Apr
200
Nassirya 1
SP
M
ME
30 Mar 04
15 May
130
Nassirya 2
SP
M
ME
9 Mar 04
15 Apr
150
Nassirya 3
SP
M
ME
31 Mar 04
21 Apr
130
Nassirya 4
SP
M
ME
31 Mar 04
21 Apr
130
New Mulla 6
CP
R
GRD/RIE
28 Mar 04
15 May
30
Old Mulla 5
CP
M
ME
2 Apr 04
TBD
15
Old Mulla 12
CP
R
GRD/RIE
1 Oct 03
15 May
15
Shuaiba 1
CP
M
ME
14 Feb 04
31 May
20
South Baghdad 1
SP
M
ME
12 Feb 04
12 Apr
30
South Baghdad 2
SP
M
ME
12 Feb 04
12 Apr
30
South Baghdad 3
SP
R
ME
18 Mar 04
18 May
20
Taji 7
CP
R
GRD/RIE
1 Oct 03
15 May
15
Taji 6
CP
M
ME
2 Apr 04
TBD
15
LEGEND OF ELECTRICAL SYSTEM POWER SOURCE
SP: STEAM POWER – These plants use either fuel oil or crude in burners CP: COMBUSTION POWER RP: RECIPROCATING POWER HP: HYDRO POWER
Transmission:
LINE
Kv
Fault
Maint.
Org.
Date out-of -service
Est. In-service Date
Comments
Nassiriya-Khor Zubayr
400
Sabotage
Bechtel
26 May
102 towers complete/212req’d Haditha-Baghd West 400 Sabotage GRD/RIE
15 Apr
246 towers complete/246 req’d Hartha-Qut – Wasit 400 Sabotage GRD/RIE
Complete
297 towers complete/297 req’d Baiji - Baghd West #1 400 Sabotage GRD/RIE
Complete
68 towers complete/68 req’d Baghd E.-Baghd S. #2 400 New Line GRD/RIE
Complete
81 towers complete/81req’d Haditha – Qaim 400 Sabotage GRD-RIE
TBD
No contract awarded
Baiji – Haditha
400
Sabotage
Bechtel
TBD
No contract awarded
Diyala Connection
400
New Line
ME
30 May
Dibis/Erbil-Qara Qosh
132
New Line
GRD/RIE
15 May
Contractor mobilized
Dibis to Old Kirkuk
132
Reconductor
GRD-RIE
15 Jun
Bids for work under evaluation Mosul – Mosul East 132 Sabotage ME
TBD
Shuwaiba-Toba-Hamar
132
Sabotage
ME
Complete
44 towers complete/44 req’d Samediya – New Baghdad 132 Reconductor GRD-RIE
15 Jun
Contract Awarded 24 Mar
Jazair to Yarmook
132
Reconductor
GRD-RIE
15 Jun
Contract Awarded 24 Mar
Baghd West – Jamia
132
Sabotage
ME
TBD
Al Amarah-Burzulgan
132
Looting
GRD-RIE
15 Jun
26 towers complete /126 req’d Temim- Tuz 132 Sabotage ME
TBD
Nejibiya – Hartha
132
Sabotage
ME
TBD
Lines Returned to service: Baji-Baghdad West # 1 (31 Mar)
Distribution:
Power transferred from North to Middle 1075 MW.
Power transferred from South to Middle 130 MW.
GOVERNORATE
Peak Load MW
MWH
Average Load MW
Demand Load MW
Baghdad
1180
24696
1029
1292
Duhok
80
1824
76
104
Naynawa
380
7749
323
449
Tamim
165
3302
138
181
Salah Aldeen
210
4501
188
224
Anbar
200
4222
176
212
Dyala
100
2048
85
131
Babil
115
2356
98
137
Kirbala
95
2128
89
110
Najaf
110
2444
102
131
Kadsya
65
1471
61
84
Wasit
95
2138
89
116
Muthana
60
1385
58
77
Nasirya
100
1799
75
114
Misan
65
1496
62
85
Basra
320
6754
28
281
Data compiled and reported by:
LTC Tharnell M. Thomas
CENTCOM LNO CPA Ministry of Electricity thomast2orha.centcom.mil Page PAGE 1 of NUMPAGES 3
Home / Essential Services / ESS-83b11576
Essential Services
DAILY POWER SYSTEM HIGHLIGHTS FOR APRIL 3, 2004
- Date
- 3 April 2004
- Category
- Essential Services
- Text available
- English
- Files
- 1
Highlighting search results for: