System Status Apr 02

Date
2 April 2004
Category
Essential Services
Text available
English
Files
1
English original XLSDownload English text

Spreadsheet preview

Sheet “A-Steam Power Stations”: 16 rows × 13 columns

Reporting Peak for 01 APRIL 2004 / Report Date - 02 APRIL 2004
A - Steam Power Stations
Power StationsType FuelNo. of UnitsNo. of Operating UnitsUnits Load (MW)Total Load MWTarget Load MWRemarks
123456
DibisNatural Gas42991824
BaijiFuel Oil63858080245500
DauraFuel Oil400180
South BaghdadFuel Oil62303060200
MussaibeCrude and Fuel Oil42205200405860
NassiryaCrude400600
NajebiaNatural Gas and Crude229090180160
HarthaNatural Gas and Crude41170170300
Out of Service for Unscheduled MaintanenceTotal:1,0782,824
Out of Service for Program Maintanence/Rehab
No activity
Not Performing at Peak Performance
# A-Steam Power Stations Reporting Peak for 01 APRIL 2004 / Report Date - 02 APRIL 2004 A - Steam Power Stations Power Stations Type Fuel No. of Units No. of Operating Units Units Load (MW) Total Load MW Target Load MW Remarks 1 2 3 4 5 6 Dibis Natural Gas 4 2 9 9 18 24 Baiji Fuel Oil 6 3 85 80 80 245 500 Daura Fuel Oil 4 0 0 180 South Baghdad Fuel Oil 6 2 30 30 60 200 Mussaibe Crude and Fuel Oil 4 2 205 200 405 860 Nassirya Crude 4 0 0 600 Najebia Natural Gas and Crude 2 2 90 90 180 160 Hartha Natural Gas and Crude 4 1 170 170 300 Out of Service for Unscheduled Maintanence Total: 1078 2824 Out of Service for Program Maintanence/Rehab No activity Not Performing at Peak Performance # B- Gas_C-Power Stations Reporting Peak for 01 APRIL 2004 / Report Date - 02 APRIL 2004 B- Gas Power Stations C -Hydro Power Stations Power Stations No. of Units No. of Operating Units Station Load Target Load Fuel Use Remarks Power Stations No. of Units No. of Operating Units Station Load Target Load Discharge m3/Sec Gas Pressure Baiji 2 2 170 125 Gas Oil Musil Dam Main 4 4 610 600 M. Baiji 8 4 92 Gas Oil Musil Dam reg 4 4 46 60 Quds 2 2 200 160 Gas Oil Musil Pumping 2 1 112 0 Mosil 12 8 130 150 Haditha Dam 6 160 Dibis 3 2 50 30 Samarra 3 3 67 55 Old Mulla 12 5 69 128 Himrin 2 2 40 21 New Mulla 6 5 155 173 Hindia 4 2 3 5 Taji 7 2 40 55 Kufa 4 2 1 0 M. Taji 2 1 8 18 Total 879 896 Daura 4 2 45 30 System Generation MWh Hilla 4 4 66 64 Syrian Line Generation MWh Najaf 3 3 120 129 Turkey Line Generation MWh Khor 4 3 140 80 Natural Gas Total Generation 79336 MWh Shuaiba 2 1 4 20 Natural Gas System Peak Load 3481 MW M. Shuaiba 2 Natural Gas Syria Peak Load 60 MW Petro 4 0 Natural Gas Turkey Peak Load 82 MW M. Dibis 4 2 6 24 Natural Gas Fixed Gen Peak Load 266 MW Mossil East 5 3 15 0 Gas Oil Total Peak Load 3623 MW Hmam/Zafranya 7 2 33 Gas Oil Baghdad Load 1150 MW Diesel Gas Oil Total 1343 1186 Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590). Edited by Electricity Commission U.S. Advisor Staff. # Peak Loads Reporting Peak for 01 APRIL 2004 / Report Date - 02 APRIL 2004 GOVERNORATE Peak Load MW MWH Average Load MW Baghdad 1180 Duhok 80 Naynawa 380 Tamim 165 Salah Aldeen 210 Anbar 200 Dyala 100 Babil 115 Kirbala 95 Najaf 110 Kadsya 65 Wasit 95 Muthana 60 Nasirya 100 Misan 65 Basra 320