DAILY POWER SYSTEM HIGHLIGHTS FOR APRIL 24, 2004
The CPA Electricity Advisor issues this report to note significant events or conditions of interest in the power sector. The basic daily data on the power system is available on the CPA web site.
HIGHLIGHTS: Nassirya 2 and Mussaibe 4 returned from maintenance, operational now.
We should begin to see a gradual climb in generation as units return from maintenance.
Generation:
Peak Power 3916Mw, 75,977Mw hours, 7-day Avg. 3856Mw Generators Returned to Service: (5) 265 Mw South Baghdad 5 30 Mw Mussaibe 4 125 Mw Nassirya 2 80 Mw Old Mulla 6 15 Mw Hilla 5 15 Mw Generators Unscheduled Out of Service (20) 558 Mw PLANT
Type
SP, CP, RP, HP
Fault
Mw
Dibis 3
SP
Tripped-Ground/ Differential 8 South Baghdad 6 SP Boiler Leak 30
* Najebia 5
SP
Under Frequency
80
Baiji 1
CP
Filter
85
Baiji Mobile, 4
CP
No Fuel Filters
25
Doura 1,2
CP
No gas pressure
40
* Khor Zubayr 4
CP
Under Frequency
50
Mosil 1
CP
Rotor Defect
15
Mosil 2
CP
Load Gear Oil leak
15
* Mosil 3
CP
Excitor Problem
15
Mosil 8
CP
Reverse Power
15
Mosil 9
CP
Rotor Defect
15
Old Mulla 9
CP
Load gear problems
15
New Mulla 4
CP
Load gear oil leak
30
* Shuaiba 1
CP
Under Frequency
15
Shuaiba 2
CP
Vibrations
15
Taji 1,2
CP
No gas pressure
45
Taji 3,
CP
Compressor
15
* Taji 5
CP
High Exhaust Temp
15
M. Taji 2
CP
Software
15
RED – Denotes out of service since last report
Generators Scheduled Out of Service (25) 1303 Mw PLANT
Type
SP/NG
Prog. Maintenance(M) / Rehab (R) Maint.
Org.
Date out-of -service
Est. In-service Date
Mw
Baiji 1
SP
M
TBD
21 Mar 04
21 May
100
Baiji 3
SP
M
Bechtel
29 Feb 04
1 May
100
Dibis 4
SP
M
ME
15 Mar 04
30 Apr
8
Doura 4
CP
M
ME
14 Apr 04
31 May
20
Doura 3
CP
R
GRD/RIE
1 Mar 03
15 May
20
Doura 3
SP
M
ME
18 Mar 04
18 May
65
Doura 4
SP
M
ME
2 Feb 04
30 Apr
65
Doura 5
SP
R
Bechtel
Jul 03
20 Jun
100
Doura 6
SP
R
Bechtel
Jul 03
20 Jul
100
Dibis 4
CP
R
GRD/RIE
Sep 03
12 May
30
Hartha 1
SP
M
ME
22 Mar 04
24 May
100
Khor Zubayr 2
CP
R
GRD/RIE
15 Mar 04
3 Jul
50
Mussaibe 2
SP
M
ME
28 Feb 04
28 Apr
200
Nassirya 1
SP
M
ME
30 Mar 04
15 May
130
New Mulla 6
CP
R
GRD/RIE
28 Mar 04
15 May
30
Old Mulla 1
CP
M
ME
17 Apr 04
15 May
15
Old Mulla 2
CP
M
ME
17 Apr 04
15 May
15
Old Mulla 8
CP
M
ME
17 Apr 04
23 Apr
15
Old Mulla 12
CP
R
GRD/RIE
1 Oct 03
15 May
15
South Baghdad 1
SP
M (Awaiting parts)
ME
12 Feb 04
TBD
30
South Baghdad 2
SP
M (Awaiting Parts)
ME
12 Feb 04
TBD
30
South Baghdad 3
SP
R
ME
18 Mar 04
18 May
20
Taji 4
CP
M
ME
21 Apr 04
15 JUL
15
Taji 7
CP
R
GRD/RIE
1 Oct 03
15 JUL
15
Taji 6
CP
M
ME
2 Apr 04
26 May
15
LEGEND OF ELECTRICAL SYSTEM POWER SOURCE
SP: STEAM POWER – These plants use either fuel oil or crude in burners CP: COMBUSTION POWER RP: RECIPROCATING POWER HP: HYDRO POWER
Transmission:
LINE
Kv
Fault
Maint.
Org.
Date out-of -service
Est. In-service Date
Comments
Nassiriya-Khor Zubayr
400
Sabotage
Bechtel
26 May
129 towers complete/216req’d Haditha-Baghd West 400 Sabotage GRD/RIE
Loading
246 towers complete/246 req’d Hartha-Qut – Wasit 400 Sabotage GRD/RIE
Complete
23 Apr Operational
Baiji - Baghd West #1
400
Sabotage
GRD/RIE
Complete
Operational
Baghd E.-Baghd S. #2
400
New Line
GRD/RIE
Complete
81 towers complete/81req’d Haditha – Qaim 400 Sabotage GRD-RIE
TBD
No contract awarded
Baiji – Haditha
400
Sabotage
Bechtel
TBD
No contract awarded
Diyala Connection
400
New Line
ME
15 Jun
Dibis/Erbil-Qara Qosh
132
New Line
GRD/RIE
15 May
Contractor mobilized
Dibis to Old Kirkuk
132
Reconductor
GRD-RIE
30 Jun
Bids for work under evaluation Mosul – Mosul East 132 Sabotage ME
TBD
Shuwaiba-Toba-Hamar
132
Sabotage
ME
Complete
44 towers complete/44 req’d Samediya – New Baghdad 132 Reconductor GRD-RIE
15 Jun
Contract Awarded 24 Mar
Jazair to Yarmook
132
Reconductor
GRD-RIE
15 Jun
Contract Awarded 24 Mar
Baghd West – Jamia
132
Sabotage
ME
TBD
Al Amarah-Burzulgan
132
Looting
GRD-RIE
25 Jun
26 towers complete /126 req’d Temim- Tuz 132 Sabotage ME
TBD
Nejibiya – Hartha
132
Sabotage
ME
TBD
Lines Returned to service:
Distribution:
Power transferred from North to Middle 980 MW.
Power transferred from South to Middle 105 MW.
GOVERNORATE
Peak Load MW
MWH
Average Load MW
Demand Load MW
Baghdad
1365
25833
1076
1283
Duhok
70
1879
78
105
Naynawa
325
7997
333
433
Tamim
135
2763
115
148
Salah Aldeen
210
4459
186
231
Anbar
210
4247
177
215
Dyala
85
1971
82
127
Babil
100
2504
104
131
Kirbala
95
2151
90
104
Najaf
125
2723
113
131
Kadsya
65
1525
64
85
Wasit
90
1792
75
91
Muthana
68
1383
58
77
Nasirya
110
2235
93
122
Misan
50
1450
60
83
Basra
245
4305
179
200
Data compiled and reported by:
LTC Tharnell M. Thomas
CENTCOM LNO CPA Ministry of Electricity thomast2orha.centcom.mil Page PAGE 1 of NUMPAGES 3
Home / Essential Services / ESS-7648e613
Essential Services
DAILY POWER SYSTEM HIGHLIGHTS FOR APRIL 24, 2004
- Date
- 24 April 2004
- Category
- Essential Services
- Text available
- English
- Files
- 1
Highlighting search results for: