Home / Essential Services / ESS-34a8dd5d

Essential Services

System Status Apr 23

Date
23 April 2004
Category
Essential Services
Text available
English
Files
1
English original XLSDownload English text

Spreadsheet preview

Sheet “A-Steam Power Stations”: 16 rows × 13 columns

Reporting Peak for 22 APRIL 2004 / Report Date - 23 APRIL 2004
A - Steam Power Stations
Power StationsType FuelNo. of UnitsNo. of Operating UnitsUnits Load (MW)Total Load MWTarget Load MWRemarks
123456
DibisNatural Gas419924
BaijiFuel Oil6210080180500
DauraFuel Oil40180
South BaghdadFuel Oil6330303090200
MussaibeCrude and Fuel Oil43200200185585860
NassiryaCrude40600
NajebiaNatural Gas and Crude217070160
HarthaNatural Gas and Crude419090300
Out of Service for Unscheduled MaintanenceTotal:1,0242,824
Out of Service for Program Maintanence/Rehab
No activity
Not Performing at Peak Performance
# A-Steam Power Stations Reporting Peak for 22 APRIL 2004 / Report Date - 23 APRIL 2004 A - Steam Power Stations Power Stations Type Fuel No. of Units No. of Operating Units Units Load (MW) Total Load MW Target Load MW Remarks 1 2 3 4 5 6 Dibis Natural Gas 4 1 9 9 24 Baiji Fuel Oil 6 2 100 80 180 500 Daura Fuel Oil 4 0 180 South Baghdad Fuel Oil 6 3 30 30 30 90 200 Mussaibe Crude and Fuel Oil 4 3 200 200 185 585 860 Nassirya Crude 4 0 600 Najebia Natural Gas and Crude 2 1 70 70 160 Hartha Natural Gas and Crude 4 1 90 90 300 Out of Service for Unscheduled Maintanence Total: 1024 2824 Out of Service for Program Maintanence/Rehab No activity Not Performing at Peak Performance # B- Gas_C-Power Stations Reporting Peak for 22 APRIL 2004 / Report Date - 23 APRIL 2004 B- Gas Power Stations C -Hydro Power Stations Power Stations No. of Units No. of Operating Units Station Load Target Load Fuel Use Remarks Power Stations No. of Units No. of Operating Units Station Load Target Load Discharge m3/Sec Gas Pressure Baiji 2 1 85 125 Gas Oil Musil Dam Main 4 4 600 600 M. Baiji 8 3 70 Gas Oil Musil Dam reg 4 3 35 60 Quds 2 1 90 160 Gas Oil Musil Pumping 2 1 110 0 Mosil 12 7 110 150 Haditha Dam 6 160 Dibis 3 2 45 30 Samarra 3 3 55 55 Old Mulla 12 6 90 128 Himrin 2 2 35 21 New Mulla 6 4 120 173 Hindia 4 4 5 5 Taji 7 55 Kufa 4 2 1 0 M. Taji 2 18 Total 841 896 Daura 4 30 System Generation MWh Hilla 4 5 84 64 Syrian Line Generation MWh Najaf 3 3 100 129 Turkey Line Generation MWh Khor 4 3 80 80 Natural Gas Total Generation 78517 MWh Shuaiba 2 1 10 20 Natural Gas System Peak Load 3884 MW M. Shuaiba 2 Natural Gas Syria Peak Load 60 MW Petro 4 1 19 0 Natural Gas Turkey Peak Load 82 MW M. Dibis 4 3 9 24 Natural Gas Fixed Gen Peak Load 266 MW Mossil East 5 3 16 0 Gas Oil Total Peak Load 4026 MW Hmam/Zafranya 7 2 52 Gas Oil Baghdad Load 1200 MW Diesel Gas Oil Total 980 1186 Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590). Edited by Electricity Commission U.S. Advisor Staff. # Peak Loads Reporting Peak for 22 APRIL 2004 / Report Date - 23 APRIL 2004 GOVERNORATE Peak Load MW MWH Average Load MW Demand Load MW Baghdad 1280 Duhok 80 Naynawa 325 Tamim 145 Salah Aldeen 210 Anbar 186 Dyala 80 Babil 85 Kirbala 75 Najaf 89 Kadsya 40 Wasit 70 Muthana 40 Nasirya 25 Misan 30 Basra 265