# A-Steam Power Stations
REPORT DATE - 7 January 2004 A - Steam Power Stations Power Stations Type No. of Units No. of Operating Units Units Load (MW) Total Load MW Target Load Remarks Fuel 1 2 3 4 5 6 MW Dibis Natural Gas 4 2 8 0 8 16 24 #1 prog maint.10 DEC to 25 JAN. #3 FWF.
Baiji Fuel Oil 6 2 100 0 0 95 0 0 195 500 #2 lack of HCL. #3 boiler leak. #6 prog maint. 5 DEC to 19 JAN.
Daura Fuel Oil 4 1 80 0 0 0 80 180 No. 4 Repair of bearing, Nos. 5 & 6: Rehab.
South Baghdad Fuel Oil 6 2 0 0 20 30 0 0 50 200 #1 Boiler Leak, #2 A/H, #6 Thrust bearing, #5 prog maint Mussaibe Crude and Fuel Oil 4 2 210 0 0 215 425 860 #2 Inspection/Seal treatment, #3 Burner Mgmt. System (BMS) Nassirya Crude 4 3 130 140 140 0 410 600 #4 prog maint. 28 DEC to 28 JAN.
Najebia Natural Gas and Crude 2 2 40 90 130 160 #4 only one boiler in operation-degraded Hartha Natural Gas and Crude 4 1 140 0 140 300 #4 prog maint.
Total: 1446 2824
# B- Gas_C-Power Stations
Report Date- 7 January 2004 B- Gas Power Stations C -Hydro Power Stations Power Stations No. of Units No. of Operating Units Station Load Target Load Fuel Use Remarks Power Stations No. of Units No. of Operating Units Station Load Target Load Discharge m3/Sec Gas Pressure Baiji 2 1 130 125 Gas Oil No. 2 lubricating oil leak Musil Dam Main 4 3 380 600 Quds 2 1 110 160 Gas Oil 39 truck #2 C/B problem Musil Dam reg 4 3 36 60 450 Mosil 12 8 125 150 28 #1 Rotor Defect. #2 servo ACC. #3 Prog Maint. #9 rotor defect. Musil Pumping 2 1 110 0 Dibis 3 1 30 30 33 #4 and 5 rehab.. Haditha Dam 6 2 140 160 300 Old Mulla 12 7 90 128 520 #1 ACC gear, #2 servo, #5 Prog maint, #7 progm maint, #12 rehab. Samarra 3 3 40 55 400 New Mulla 6 3 95 173 30 #4, 5 prog maint, #6 Generator defect Himrin 2 1 22 21 90 Taji 7 4 55 55 18 #3 Compressor, #4 Turbine, #7 Rehab. Hindia 4 3 5 5 M. Taji 2 1 8 18 Natural Gas #2 software. Kufa 4 0 0 0 Daura 4 3 70 30 17 #3 Rehab Total 733 896 Hilla 4 3 55 64 30 #1 Stopped 1930 cooling system System Generation 69917 MWh Najaf 3 2 100 129 30 #2 prog maint Syrian Line Generation 1421 MWh Khor 4 3 125 80 Natural Gas #4 Rehab Turkey Line Generation 1889 MWh Shuaiba 2 2 4 20 Natural Gas #1 Stand by Total Generation 73630 MWh Petro 4 1 10 0 Natural Gas System Peak Load 3230 MW M. Dibis 4 4 12 24 Natural Gas Syria Peak Load 54 MW Mossil East 5 0 0 0 Gas Oil Turkey Peak Load 82 MW Hmam/Zafranya 7 0 5 Gas Oil Fixed Gen Peak Load 77 MW Diesel 0 Gas Oil Total Peak Load 3443 MW Total 1024 1186 Baghdad Load 1236 MW Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590).
Edited by Electricity Commission U.S. Advisor Staff.
# Peak Loads
Report Date - 7 January 2004 GOVERNORATE Peak Load MW MWH Average Load MW Power transferred from North to Middle 500 MW.
Power transferred from South to Middle 170 MW.
Baghdad 1236 27453 1143.875 Duhok 82 1876 78.1667 Naynawa 302 6633 276.375 Tamim 121 3041 126.7083 Salah Aldeen 180 4057 169.0417 Anbar 160 3753 156.375 Dyala 70 1577 65.7083 Babil 70 1801 75.0417 Kirbala 60 1394 58.0833 Najaf 90 2145 89.375 Kadsya 65 1141 47.5417 Wasit 95 1775 73.9583 Muthana 56 1194 49.75 Nasirya 125 2421 100.875 Misan 59 1395 58.125 Basra 325 6778 282.4167
Home / Essential Services / ESS-6490af25
Essential Services
System Status Jan 07
- Date
- 7 January 2004
- Category
- Essential Services
- Text available
- English
- Files
- 1
Spreadsheet preview
Sheet “A-Steam Power Stations”: 13 rows × 13 columns
| REPORT DATE - 7 January 2004 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| A - Steam Power Stations | ||||||||||||
| Power Stations | Type | No. of Units | No. of Operating Units | Units Load (MW) | Total Load MW | Target Load | Remarks | |||||
| Fuel | 1 | 2 | 3 | 4 | 5 | 6 | MW | |||||
| Dibis | Natural Gas | 4 | 2 | 8 | 0 | 8 | 16 | 24 | #1 prog maint.10 DEC to 25 JAN. #3 FWF. | |||
| Baiji | Fuel Oil | 6 | 2 | 100 | 0 | 0 | 95 | 0 | 0 | 195 | 500 | #2 lack of HCL. #3 boiler leak. #6 prog maint. 5 DEC to 19 JAN. |
| Daura | Fuel Oil | 4 | 1 | 80 | 0 | 0 | 0 | 80 | 180 | No. 4 Repair of bearing, Nos. 5 & 6: Rehab. | ||
| South Baghdad | Fuel Oil | 6 | 2 | 0 | 0 | 20 | 30 | 0 | 0 | 50 | 200 | #1 Boiler Leak, #2 A/H, #6 Thrust bearing, #5 prog maint |
| Mussaibe | Crude and Fuel Oil | 4 | 2 | 210 | 0 | 0 | 215 | 425 | 860 | #2 Inspection/Seal treatment, #3 Burner Mgmt. System (BMS) | ||
| Nassirya | Crude | 4 | 3 | 130 | 140 | 140 | 0 | 410 | 600 | #4 prog maint. 28 DEC to 28 JAN. | ||
| Najebia | Natural Gas and Crude | 2 | 2 | 40 | 90 | 130 | 160 | #4 only one boiler in operation-degraded | ||||
| Hartha | Natural Gas and Crude | 4 | 1 | 140 | 0 | 140 | 300 | #4 prog maint. | ||||
| Total: | 1,446 | 2,824 |
Sheet “B- Gas_C-Power Stations”: 25 rows × 13 columns
| Report Date- 7 January 2004 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| B- Gas Power Stations | C -Hydro Power Stations | |||||||||||
| Power Stations | No. of Units | No. of Operating Units | Station Load | Target Load | Fuel Use | Remarks | Power Stations | No. of Units | No. of Operating Units | Station Load | Target Load | Discharge m3/Sec |
| Gas Pressure | ||||||||||||
| Baiji | 2 | 1 | 130 | 125 | Gas Oil | No. 2 lubricating oil leak | Musil Dam Main | 4 | 3 | 380 | 600 | |
| Quds | 2 | 1 | 110 | 160 | Gas Oil | 39 truck #2 C/B problem | Musil Dam reg | 4 | 3 | 36 | 60 | 450 |
| Mosil | 12 | 8 | 125 | 150 | 28 | #1 Rotor Defect. #2 servo ACC. #3 Prog Maint. #9 rotor defect. | Musil Pumping | 2 | 1 | 110 | 0 | |
| Dibis | 3 | 1 | 30 | 30 | 33 | #4 and 5 rehab.. | Haditha Dam | 6 | 2 | 140 | 160 | 300 |
| Old Mulla | 12 | 7 | 90 | 128 | 520 | #1 ACC gear, #2 servo, #5 Prog maint, #7 progm maint, #12 rehab. | Samarra | 3 | 3 | 40 | 55 | 400 |
| New Mulla | 6 | 3 | 95 | 173 | 30 | #4, 5 prog maint, #6 Generator defect | Himrin | 2 | 1 | 22 | 21 | 90 |
| Taji | 7 | 4 | 55 | 55 | 18 | #3 Compressor, #4 Turbine, #7 Rehab. | Hindia | 4 | 3 | 5 | 5 | |
| M. Taji | 2 | 1 | 8 | 18 | Natural Gas | #2 software. | Kufa | 4 | 0 | 0 | 0 | |
| Daura | 4 | 3 | 70 | 30 | 17 | #3 Rehab | Total | 733 | 896 | |||
| Hilla | 4 | 3 | 55 | 64 | 30 | #1 Stopped 1930 cooling system | System Generation | 69,917 | MWh | |||
| Najaf | 3 | 2 | 100 | 129 | 30 | #2 prog maint | Syrian Line Generation | 1,421 | MWh | |||
| Khor | 4 | 3 | 125 | 80 | Natural Gas | #4 Rehab | Turkey Line Generation | 1,889 | MWh | |||
| Shuaiba | 2 | 2 | 4 | 20 | Natural Gas | #1 Stand by | Total Generation | 73,630 | MWh | |||
| Petro | 4 | 1 | 10 | 0 | Natural Gas | System Peak Load | 3,230 | MW | ||||
| M. Dibis | 4 | 4 | 12 | 24 | Natural Gas | Syria Peak Load | 54 | MW | ||||
| Mossil East | 5 | 0 | 0 | 0 | Gas Oil | Turkey Peak Load | 82 | MW | ||||
| Hmam/Zafranya | 7 | 0 | 5 | Gas Oil | Fixed Gen Peak Load | 77 | MW | |||||
| Diesel | 0 | Gas Oil | Total Peak Load | 3,443 | MW | |||||||
| Total | 1,024 | 1,186 | Baghdad Load | 1,236 | MW | |||||||
| Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590). | ||||||||||||
| Edited by Electricity Commission U.S. Advisor Staff. |
Sheet “Peak Loads”: 21 rows × 4 columns
| Report Date - 7 January 2004 | |||
|---|---|---|---|
| GOVERNORATE | Peak Load MW | MWH | Average Load MW |
| Power transferred from North to Middle 500 MW. | |||
| Power transferred from South to Middle 170 MW. | |||
| Baghdad | 1,236 | 27,453 | 1,143.88 |
| Duhok | 82 | 1,876 | 78.17 |
| Naynawa | 302 | 6,633 | 276.38 |
| Tamim | 121 | 3,041 | 126.71 |
| Salah Aldeen | 180 | 4,057 | 169.04 |
| Anbar | 160 | 3,753 | 156.38 |
| Dyala | 70 | 1,577 | 65.71 |
| Babil | 70 | 1,801 | 75.04 |
| Kirbala | 60 | 1,394 | 58.08 |
| Najaf | 90 | 2,145 | 89.38 |
| Kadsya | 65 | 1,141 | 47.54 |
| Wasit | 95 | 1,775 | 73.96 |
| Muthana | 56 | 1,194 | 49.75 |
| Nasirya | 125 | 2,421 | 100.88 |
| Misan | 59 | 1,395 | 58.12 |
| Basra | 325 | 6,778 | 282.42 |