# A-Steam Power Stations
Reporting Peak for 04 MAY 2004 / Report Date - 05 MAY 2004 A - Steam Power Stations Power Stations Type Fuel No. of Units No. of Operating Units Units Load (MW) Total Load MW Target Load MW Remarks 1 2 3 4 5 6 Dibis Natural Gas 4 1 8 8 24 #2 stopped at 1412 DLL; #3 gen earth fault; #4 prog maint Baiji Fuel Oil 6 3 130 85 100 315 500 #1, #3 prog maint; #5 forced outage Daura Fuel Oil 4 0 180 #3, #4 prog maint; #5, #6 rehab South Baghdad Fuel Oil 6 3 30 30 25 85 200 #1, #2, #3 prog maint; #5 synch at 820 Mussaibe Crude and Fuel Oil 4 2 200 170 370 860 #2 prog maint; #4 oil leak Nassirya Crude 4 3 170 150 105 425 600 #1 prog maint Najebia Natural Gas and Crude 2 1 80 80 160 #5 thrust bearing prob Hartha Natural Gas and Crude 4 1 180 180 300 #1 prog maint Out of Service for Unscheduled Maintanence Total: 1463 2824 Out of Service for Program Maintanence/Rehab No activity Not Performing at Peak Performance
# B- Gas_C-Power Stations
Reporting Peak for 04 MAY 2004 / Report Date - 05 MAY 2004 B- Gas Power Stations C -Hydro Power Stations Power Stations No. of Units No. of Operating Units Station Load Target Load Fuel Use Remarks Power Stations No. of Units No. of Operating Units Station Load Target Load Discharge m3/Sec Gas Pressure Baiji 2 2 180 125 Gas Oil Musil Dam Main 4 3 400 600 M. Baiji 8 1 20 Gas Oil Musil Dam reg 4 2 22 60 300 Quds 2 2 150 160 CO & GO #1 synch at 1515 Musil Pumping 2 0 Mosil 12 7 115 150 24 #1, #2 TF; #7 prog maint; #8 TF; #9 reverse power Haditha Dam 6 4 230 160 400 Dibis 3 2 45 30 29 #4 TF Samarra 3 3 46 55 590 Old Mulla 12 7 106 128 480 #1, #2 TF; #7 HET; #8 prog maint; #12 TF Himrin 2 2 35 21 135 New Mulla 6 4 120 173 3 #4 unstable load; #6 TF Hindia 4 4 5 5 120 Taji 7 55 #1, #2 NGPL; #3 TF; #4 NGPL; #5 HET; #6 prog maint; #7 TF Kufa 4 2 2 0 60 M. Taji 2 18 Gas Oil #2 software Total 740 896 Daura 4 30 #1, #2 NGPL; #3 needs rehab; #4 prog maint System Generation 70906 MWh Hilla 4 4 68 64 27 Syrian Line Generation 1230 MWh Najaf 3 3 110 129 26 Turkey Line Generation 1875 MWh Khor 4 3 131 80 Natural Gas #2 prog maint Total Generation 79438 MWh Shuaiba 2 2 14 20 Natural Gas #1 synch at 1255 System Peak Load 3188 MW M. Shuaiba 2 Natural Gas Syria Peak Load 55 MW Petro 4 0 Natural Gas Turkey Peak Load 80 MW M. Dibis 4 3 9 24 Natural Gas Fixed Gen Peak Load 266 MW Mossil East 5 3 17 0 Gas Oil Total Peak Load 3589 MW Hmam/Zafranya 7 Gas Oil Baghdad Load 1250 MW Diesel 69 Gas Oil Total 1154 1186 Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590).
Edited by Electricity Commission U.S. Advisor Staff.
# Peak Loads
Reporting Peak for 04 MAY 2004 / Report Date - 05 MAY 2004 Power transferred from North to Middle 920 MW.
Power transferred from South to Middle 150 MW.
GOVERNORATE Peak Load MW MWH Average Load MW Demand Load MW Baghdad 1250 25044 1044 1525 Duhok 80 1848 77 133 Naynawa 250 6514 271 491 Tamim 110 2836 118 178 Salah Aldeen 155 4269 178 248 Anbar 180 4243 177 237 Dyala 70 1694 71 136 Babil 80 2313 96 138 Kirbala 72 1587 66 112 Najaf 75 2026 84 129 Kadsya 45 1295 54 94 Wasit 65 1826 76 120 Muthana 55 1233 51 80 Nasirya 120 2512 105 127 Misan 55 1300 54 79 Basra 320 7186 299 315
Home / Essential Services / ESS-5c57a459
Essential Services
System Status May 05
- Date
- 5 May 2004
- Category
- Essential Services
- Text available
- English
- Files
- 1
Spreadsheet preview
Sheet “A-Steam Power Stations”: 16 rows × 13 columns
| Reporting Peak for 04 MAY 2004 / Report Date - 05 MAY 2004 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| A - Steam Power Stations | ||||||||||||
| Power Stations | Type Fuel | No. of Units | No. of Operating Units | Units Load (MW) | Total Load MW | Target Load MW | Remarks | |||||
| 1 | 2 | 3 | 4 | 5 | 6 | |||||||
| Dibis | Natural Gas | 4 | 1 | 8 | 8 | 24 | #2 stopped at 1412 DLL; #3 gen earth fault; #4 prog maint | |||||
| Baiji | Fuel Oil | 6 | 3 | 130 | 85 | 100 | 315 | 500 | #1, #3 prog maint; #5 forced outage | |||
| Daura | Fuel Oil | 4 | 0 | 180 | #3, #4 prog maint; #5, #6 rehab | |||||||
| South Baghdad | Fuel Oil | 6 | 3 | 30 | 30 | 25 | 85 | 200 | #1, #2, #3 prog maint; #5 synch at 820 | |||
| Mussaibe | Crude and Fuel Oil | 4 | 2 | 200 | 170 | 370 | 860 | #2 prog maint; #4 oil leak | ||||
| Nassirya | Crude | 4 | 3 | 170 | 150 | 105 | 425 | 600 | #1 prog maint | |||
| Najebia | Natural Gas and Crude | 2 | 1 | 80 | 80 | 160 | #5 thrust bearing prob | |||||
| Hartha | Natural Gas and Crude | 4 | 1 | 180 | 180 | 300 | #1 prog maint | |||||
| Out of Service for Unscheduled Maintanence | Total: | 1,463 | 2,824 | |||||||||
| Out of Service for Program Maintanence/Rehab | ||||||||||||
| No activity | ||||||||||||
| Not Performing at Peak Performance |
Sheet “B- Gas_C-Power Stations”: 27 rows × 13 columns
| Reporting Peak for 04 MAY 2004 / Report Date - 05 MAY 2004 | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| B- Gas Power Stations | C -Hydro Power Stations | |||||||||||
| Power Stations | No. of Units | No. of Operating Units | Station Load | Target Load | Fuel Use | Remarks | Power Stations | No. of Units | No. of Operating Units | Station Load | Target Load | Discharge m3/Sec |
| Gas Pressure | ||||||||||||
| Baiji | 2 | 2 | 180 | 125 | Gas Oil | Musil Dam Main | 4 | 3 | 400 | 600 | ||
| M. Baiji | 8 | 1 | 20 | Gas Oil | Musil Dam reg | 4 | 2 | 22 | 60 | 300 | ||
| Quds | 2 | 2 | 150 | 160 | CO & GO | #1 synch at 1515 | Musil Pumping | 2 | 0 | |||
| Mosil | 12 | 7 | 115 | 150 | 24 | #1, #2 TF; #7 prog maint; #8 TF; #9 reverse power | Haditha Dam | 6 | 4 | 230 | 160 | 400 |
| Dibis | 3 | 2 | 45 | 30 | 29 | #4 TF | Samarra | 3 | 3 | 46 | 55 | 590 |
| Old Mulla | 12 | 7 | 106 | 128 | 480 | #1, #2 TF; #7 HET; #8 prog maint; #12 TF | Himrin | 2 | 2 | 35 | 21 | 135 |
| New Mulla | 6 | 4 | 120 | 173 | 3 | #4 unstable load; #6 TF | Hindia | 4 | 4 | 5 | 5 | 120 |
| Taji | 7 | 55 | #1, #2 NGPL; #3 TF; #4 NGPL; #5 HET; #6 prog maint; #7 TF | Kufa | 4 | 2 | 2 | 0 | 60 | |||
| M. Taji | 2 | 18 | Gas Oil | #2 software | Total | 740 | 896 | |||||
| Daura | 4 | 30 | #1, #2 NGPL; #3 needs rehab; #4 prog maint | System Generation | 70,906 | MWh | ||||||
| Hilla | 4 | 4 | 68 | 64 | 27 | Syrian Line Generation | 1,230 | MWh | ||||
| Najaf | 3 | 3 | 110 | 129 | 26 | Turkey Line Generation | 1,875 | MWh | ||||
| Khor | 4 | 3 | 131 | 80 | Natural Gas | #2 prog maint | Total Generation | 79,438 | MWh | |||
| Shuaiba | 2 | 2 | 14 | 20 | Natural Gas | #1 synch at 1255 | System Peak Load | 3,188 | MW | |||
| M. Shuaiba | 2 | Natural Gas | Syria Peak Load | 55 | MW | |||||||
| Petro | 4 | 0 | Natural Gas | Turkey Peak Load | 80 | MW | ||||||
| M. Dibis | 4 | 3 | 9 | 24 | Natural Gas | Fixed Gen Peak Load | 266 | MW | ||||
| Mossil East | 5 | 3 | 17 | 0 | Gas Oil | Total Peak Load | 3,589 | MW | ||||
| Hmam/Zafranya | 7 | Gas Oil | Baghdad Load | 1,250 | MW | |||||||
| Diesel | 69 | Gas Oil | ||||||||||
| Total | 1,154 | 1,186 | ||||||||||
| Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590). | ||||||||||||
| Edited by Electricity Commission U.S. Advisor Staff. |
Sheet “Peak Loads”: 24 rows × 5 columns · preview of the first 21 rows; full file from the original button
| Reporting Peak for 04 MAY 2004 / Report Date - 05 MAY 2004 | ||||
|---|---|---|---|---|
| Power transferred from North to Middle 920 MW. | ||||
| Power transferred from South to Middle 150 MW. | ||||
| GOVERNORATE | Peak Load MW | MWH | Average Load MW | Demand Load MW |
| Baghdad | 1,250 | 25,044 | 1,044 | 1,525 |
| Duhok | 80 | 1,848 | 77 | 133 |
| Naynawa | 250 | 6,514 | 271 | 491 |
| Tamim | 110 | 2,836 | 118 | 178 |
| Salah Aldeen | 155 | 4,269 | 178 | 248 |
| Anbar | 180 | 4,243 | 177 | 237 |
| Dyala | 70 | 1,694 | 71 | 136 |
| Babil | 80 | 2,313 | 96 | 138 |
| Kirbala | 72 | 1,587 | 66 | 112 |
| Najaf | 75 | 2,026 | 84 | 129 |
| Kadsya | 45 | 1,295 | 54 | 94 |
| Wasit | 65 | 1,826 | 76 | 120 |
| Muthana | 55 | 1,233 | 51 | 80 |
| Nasirya | 120 | 2,512 | 105 | 127 |
| Misan | 55 | 1,300 | 54 | 79 |
| Basra | 320 | 7,186 | 299 | 315 |