DAILY POWER SYSTEM HIGHLIGHTS FOR MAY 6, 2004
The CPA Electricity Advisor issues this report to note significant events or conditions of interest in the power sector. The basic daily data on the power system is available on the CPA web site.
HIGHLIGHTS:
Generation:
Peak Power 3785Mw, 80,078Mw hours, 7-day Avg. 3911Mw Generators Returned to Service: (1) 210 Mw Mussaibe 3 210 Mw
Generators Unscheduled Out of Service (19) 673 Mw PLANT
Type
SP, CP, RP, HP
Fault
Mw
* Baiji 4
SP
Excitor
85
Dibis 2
SP
Drum Level low
8
Najebia 5
SP
Thrust bearing problem
80
Mussaibe 4
SP
Oil Leak
230
Baiji Mobile 2,3
CP
Planned Outage
40
Baiji Mobile, 4
CP
Fuel Filters
25
Doura 1,2
CP
No gas pressure
40
Mosil 1
CP
Rotor Defect
15
Mosil 2
CP
Reverse Power
15
Mosil 9
CP
Reverse Power
15
New Mulla 4
CP
Unstable Load
30
Old Mulla 7
CP
High exhaust temp
15
Taji 1,2
CP
No gas pressure
30
Taji 3,
CP
Compressor
15
Taji 5
CP
High Exhaust Temp
15
M. Taji 2
CP
Software
15
RED – Denotes out of service since last report
Generators Scheduled Out of Service (27) 1326 Mw PLANT
Type
SP/NG
Prog. Maintenance(M) / Rehab (R) Maint.
Org.
Date out-of -service
Est. In-service Date
Mw
Baiji 1
SP
M
Bechtel
21 Mar 04
21 May
100
Baiji 3
SP
M(Additional work)
Bechtel
29 Feb 04
TBD
100
Dibis 3
SP
M
ME
26 Apr 04
TBD
8
Dibis 4
SP
M
ME
15 Mar 04
TBD
8
Doura 4
CP
M
ME
14 Apr 04
31 May
20
Doura 3
CP
R
ME
1 Mar 03
TBD
20
Doura 3
SP
M
ME
18 Mar 04
18 May
65
Doura 4
SP
M
ME
2 Feb 04
TBD
65
Doura 5
SP
R
Bechtel
Jul 03
20 Jun
100
Doura 6
SP
R
Bechtel
Jul 03
20 Jul
100
Dibis 4
CP
R
GRD/RIE
Sep 03
12 May
30
Hartha 1
SP
M
ME
22 Mar 04
23 May
100
Khor Zubayr 2
CP
R
GRD/RIE
15 Mar 04
3 Jul
50
Mosil 7
CP
M
ME
24 Apr 04
TBD
15
Mussaibe 2
SP
M (additional work)
ME
28 Feb 04
20 May
200
Nassirya 1
SP
M
ME
30 Mar 04
15 May
130
New Mulla 6
CP
R
GRD/RIE
28 Mar 04
15 May
30
Old Mulla 1
CP
M
ME
17 Apr 04
15 May
15
Old Mulla 2
CP
M
ME
17 Apr 04
15 May
15
Old Mulla 8
CP
M
ME
17 Apr 04
TBD
15
Old Mulla 12
CP
R
GRD/RIE
1 Oct 03
15 May
15
South Baghdad 1
SP
M (Awaiting parts)
ME
12 Feb 04
31 May
30
South Baghdad 2
SP
M (Awaiting Parts)
ME
12 Feb 04
31 May
30
South Baghdad 3
SP
R
ME
18 Mar 04
18 May
20
Taji 4
CP
M
GRD/RIE
21 Apr 04
15 JUL
15
Taji 7
CP
R
GRD/RIE
1 Oct 03
15 JUL
15
Taji 6
CP
M
ME
2 Apr 04
26 May
15
New In-service date
LEGEND OF ELECTRICAL SYSTEM POWER SOURCE
SP: STEAM POWER – These plants use either fuel oil or crude in burners CP: COMBUSTION POWER RP: RECIPROCATING POWER HP: HYDRO POWER
Transmission:
LINE
Kv
Fault
Maint.
Org.
Date out-of -service
Est. In-service Date
Comments
Nassiriya-Khor Zubayr
400
Sabotage
Bechtel
26 May
159 towers complete/216req’d Haditha-Baghd West 400 Sabotage GRD/RIE
Complete
246 towers complete/246 req’d Hartha-Qut Wasit 400 Sabotage GRD/RIE
Complete
23 Apr Operational
Baiji - Baghd West #1
400
Sabotage
GRD/RIE
Complete
Operational
Baghd E.-Baghd S. #2
400
New Line
GRD/RIE
Complete
81 towers complete/81req’d Haditha – Qaim 400 Sabotage GRD-RIE
28 Feb 05
Start date 21 May 04
Baiji – Haditha
400
Sabotage
Bechtel
TBD
No contract awarded
Diyala Connection
400
New Line
ME
15 Jun
Foundations under construction Dibis/Erbil-Qara Qosh 132 New Line GRD/RIE
22 May
Construction ongoing
Dibis to Old Kirkuk
132
Reconductor
GRD-RIE
31 Jul
Bids for work under evaluation Mosul – Mosul East 132 Sabotage ME
TBD
Shuwaiba-Toba-Hamar
132
Sabotage
ME
Complete
44 towers complete/44 req’d Samediya – New Baghdad 132 Reconductor GRD-RIE
5 Jul
Assessment underway
Jazair to Yarmook
132
Reconductor
GRD-RIE
5 Jul
Assessment underway
Baghd West – Jamia
132
Sabotage
ME
TBD
Old Amarah-Burzulgan
132
Looting
GRD-RIE
25 Jun
Assessment underway
Temim- Tuz
132
Sabotage
ME
TBD
Nejibiya – Hartha
132
Sabotage
ME
TBD
Lines Returned to service:
Distribution: No report today Power transferred from North to Middle775 MW.
Power transferred from South to Middle 240 MW.
GOVERNORATE
Peak Load MW
MWH
Average Load MW
Demand Load MW
Baghdad
1240
24885
1037
1400
Duhok
82
1933
81
109
Naynawa
295
6494
271
491
Tamim
115
2909
121
181
Salah Aldeen
191
4541
189
247
Anbar
195
4214
176
233
Dyala
90
1999
83
134
Babil
90
2348
98
142
Kirbala
80
1811
75
107
Najaf
93
2126
89
128
Kadsya
60
1405
59
86
Wasit
87
1966
82
122
Muthana
55
1230
51
76
Nasirya
125
2533
106
128
Misan
65
1349
56
82
Basra
290
6549
273
317
Data compiled and reported by:
LTC Tharnell M. Thomas
CENTCOM LNO CPA Ministry of Electricity thomast2orha.centcom.mil Page PAGE 1 of NUMPAGES 3
Home / Essential Services / ESS-5380d6a4
Essential Services
DAILY POWER SYSTEM HIGHLIGHTS FOR MAY 6, 2004
- Date
- 6 May 2004
- Category
- Essential Services
- Text available
- English
- Files
- 1
Highlighting search results for: