DAILY POWER SYSTEM HIGHLIGHTS FOR MARCH 4, 2004
The CPA Electricity Advisor issues this report to note significant events or conditions of interest in the power sector. The basic daily data on the power system is available on the CPA web site.
HIGHLIGHTS:
Generation:
Peak Power 3923Mw, 85,539Mw hours, 7-day Avg. 4019Mw
Generators Returned to Service: 395 Mw Mussaibe 1 200 Mw Hartha 4 80 Mw Najaf 2 50 Mw Khor Zubayr 2 (2 Mar) 50 Mw Mosul 8 (2 Mar) 15 Mw
Generators Unscheduled Out of Service 698 Mw PLANT
Type
SP, CP, RP, HP
Fault
Mw
Dibis 2
SP
Boiler Leak
8
* Baiji 1
SP
Air Heater
100
Baiji 6
SP
Trip Valve
100
South Baghdad 4
SP
Boiler Leak
30
Baiji 2,
CP
Lubricating oil leak
110
* Qudas 1
CP
Fuel Pump
100
* Dibis 5
CP
Thermal Coupler
30
Hilla 2
CP
Servo
20
Khor Zubayr 3
CP
Generator Transf. Prob.
50
Mosil 1
CP
Rotor Defect
15
Mosil 9
CP
Rotor Defect
15
Old Mulla 1
CP
Acc Gear
15
Old Mulla 2
CP
Servo
15
* Old Mulla 7
CP
Load gear
15
New Mulla 6
CP
Generator Defect
30
Taji 3,
CP
Compressor
15
Taji 4
CP
Control card
15
Taji Mobile, 2
CP
Software problem
15
* RED – Denotes out of service since last report Generators Scheduled Out of Service 1101 Mw PLANT
Type
SP/NG
Prog. Maintenance(M) / Rehab (R) Maint.
Org.
Date out-of -service
Est. In-service Date
Mw
Baiji 2
SP
M
Bechtel
2 Jan 04
4 Mar
100
Baiji 3
SP
M
GRD/RIE
29 Feb 04
30 Jun
100
Doura 2
CP
M
ME
21 Feb 04
TBD
20
Doura 3
CP
R
GRD/RIE
1 Mar 03
15 May
20
Doura 4
SP
M
ME
2 Feb 04
20 Apr
65
Doura 5
SP
R
Bechtel
Jul 03
30 Apr
100
Doura 6
SP
R
Bechtel
Jul 03
31May
100
Dibis 3
SP
M
ME
30Dec 03
31 May
8
Dibis 4
CP
R
GRD/RIE
Sep 03
30 Mar
18
Mussaibe 2
SP
M
ME
28 Feb 04
28 Apr
200
Mussaibe 4
SP
M
ME
7 Feb 04
7 Mar
200
New Mulla 2
CP
M
ME
17 Feb04
TBD
30
Old Mulla 5
CP
M
GRD/RIE
1 Nov 03
15 May
15
Old Mulla 8
CP
M
GRD/RIE
28 Feb 04
15 May
15
Old Mulla 12
CP
R
GRD/RIE
1 Oct 03
15 May
15
Taji 7
CP
R
GRD/RIE
1 Oct 03
15 May
15
Shuaiba 1
CP
M
ME
14 Feb 04
31 May
20
South Baghdad 1
SP
M
ME
12 Feb 04
12 Apr
30
South Baghdad 2
SP
M
ME
12 Feb 04
12 Apr
30
LEGEND OF ELECTRICAL SYSTEM POWER SOURCE
SP: STEAM POWER – These plants use either fuel oil or crude in burners CP: COMBUSTION POWER RP: RECIPROCATING POWER HP: HYDRO POWER
Transmission:
LINE
Kv
Fault
Maint.
Org.
Date out-of -service
Est. In-service Date
Comments
Nassiriya-Khor Zubayr
400
Sabotage
Bechtel
26 May
102 towers complete/212req’d Haditha-Baghd West 400 Sabotage GRD/RIE
15 Apr
101 towers complete/236 req’d Hartha-Qut – Wasit 400 Sabotage GRD/RIE
7 Mar
293 towers complete/297 req’d Baiji - Baghd West #1 400 Sabotage GRD/RIE
22 Mar
68 towers complete/68 req’d Baghd E.-Baghd S. #2 400 New Line GRD/RIE
3 Mar
81 towers complete/81req’d Baghd S. – Diwaniyah 400 Sabotage GRD/RIE
Compl. 24 Jan
27 towers complete/27 req’d Haditha – Qaim 400 Sabotage ME
TBD
No contract awarded
Baiji – Haditha
400
Sabotage
ME
TBD
No contract awarded
Diyala Connection
400
New Line
ME
30 Apr
Dibis/Irbil-Quarqush
132
New Line
GRD/RIE
15 May
Contractor on-site 20 Feb
Mosul – Mosul East
132
Sabotage
ME
TBD
Shuwaiba-Toba-Hamar
132
Sabotage
ME
28 Feb
44 towers complete/44 req’d Baghd West – Jamia 132 Sabotage ME
TBD
Omara-Burzegan
132
Looting
ME
1 May
26 towers complete/126 req’d Temim- Tuz 132 Sabotage ME
TBD
Nejibiya – Hartha
132
Sabotage
ME
TBD
Lines Returned to service:
None reported today
Distribution:
Report Date - 04 MARCH 2004 Power transferred from North to Middle 740 MW.
Power transferred from South to Middle 250 MW.
GOVERNORATE
Peak Load MW
MWH
Average Load MW
Baghdad
1270
27049
1127
Duhok
80
1900
79
Naynawa
270
9329
389
Tamim
130
3454
144
Salah Aldeen
185
4917
205
Anbar
180
4894
204
Dyala
94
2631
110
Babil
95
2488
104
Kirbala
124
2695
112
Najaf
147
2942
123
Kadsya
50
1503
63
Wasit
81
2201
92
Muthana
55
1407
59
Nasirya
110
2809
117
Misan
65
1535
64
Basra
300
7165
299
Data compiled and reported by:
LTC Tharnell M. Thomas
CENTCOM LNO CPA Ministry of Electricity thomast2orha.centcom.mil Page PAGE 2 of NUMPAGES 3
Home / Essential Services / ESS-55aa17b0
Essential Services
DAILY POWER SYSTEM HIGHLIGHTS FOR MARCH 4, 2004
- Date
- 4 March 2004
- Category
- Essential Services
- Text available
- English
- Files
- 1
Highlighting search results for: